On-Site Materials Manager, Data Center Construction

Hut 8 Corp.

Austin (TX)

Sur place

USD 65 000 - 98 000

Plein temps

14 jours+

Une candidature complète en une minute

Un CV et une lettre de motivation personnalisés, prêts à envoyer.

Passez les filtres ATS

Résumé du poste

Hut 8 Corp. is seeking an on-site Materials Manager to oversee receiving, laydown, storage, and inventory control for a data center build.

You will drive material readiness, coordinate with vendors and field teams, and ensure compliance with preservation and safety standards on site. Ideal candidates have 5+ years in site materials management within industrial or data center projects, strong ERP/Excel skills, and forklift experience.

Qualifications

  • 5+ years in site materials management, warehousing, or field logistics on industrial, power, or data center construction projects.
  • Direct experience receiving and storing major electrical/mechanical equipment, including OEM preservation requirements.
  • Strong inventory-control discipline: location systems, cycle counts, and reconciliation habits that hold up under audit.
  • Fluency with inventory/ERP tools and Excel; barcode/scanning system experience a plus.
  • Comfortable operating daily in an active construction environment alongside superintendents and trade crews.

Responsabilités

  • Run site receiving operation: delivery scheduling and gate coordination, unloading and inspection, OS&D documentation with photos, and same-day receiving records against POs.
  • Manage laydown yards, warehouse space, and climate-controlled storage with a documented location system.
  • Maintain accurate inventory records tied to storage locations; run cycle counts; reconcile physical inventory against POs, BOMs, and issue records; report shortages ahead of installation needs.
  • Run a disciplined material issue process to trade partners - requisitions, staging, sign-out accountability - and manage returns, surplus, and attrition tracking.
  • Work the three-week lookahead with superintendents and the planner: verify material readiness for upcoming work fronts, flag at-risk items, and stage material to work areas ahead of need.
  • Coordinate crane and forklift resources for material moves, keep laydown areas safe and organized, and support site logistics planning as the project density increases.

Connaissances

Materials management
Inventory control
ERP tools
Excel
Forklift certification
Site logistics coordination

Outils

ERP systems
Barcode/scan system

Description du poste

Hut 8 Corp. is seeking an on-site Materials Manager to oversee receiving, laydown, storage, and inventory control for a data center build.

You will drive material readiness, coordinate with vendors and field teams, and ensure compliance with preservation and safety standards on site. Ideal candidates have 5+ years in site materials management within industrial or data center projects, strong ERP/Excel skills, and forklift experience.

Obtenez votre examen gratuit et confidentiel de votre CV.

ou faites glisser et déposez votre fichier ici.

Similar jobs

Postes similaires à comparer

On-Site Materials Manager for Data Center Build
On-Site Materials Manager for Data Center Build

Hut 8 Corp. • Houston (TX)

Sur place
USD 70 000 - 100 000
On-Site Materials Lead for Data Center Build
On-Site Materials Lead for Data Center Build

Hut 8 Corp. • Corpus Christi (TX)

Sur place
USD 70 000 - 110 000
On-Site Materials Manager - Data Center Construction
On-Site Materials Manager - Data Center Construction

Hut 8 Corp. • San Antonio (TX)

Sur place
USD 65 000 - 95 000
Materials Manager
Materials Manager

Hut 8 Corp. • Corpus Christi (TX)

Sur place
USD 70 000 - 110 000
Materials Manager
Materials Manager

Hut 8 Corp. • Austin (TX)

Sur place
USD 65 000 - 98 000
Materials Manager
Materials Manager

Hut 8 Corp. • Houston (TX)

Sur place
USD 70 000 - 100 000
Materials Manager
Materials Manager

Hut 8 Corp. • San Antonio (TX)

Sur place
USD 65 000 - 95 000
Materials Manager
Materials Manager

KODIAK Construction Recruiting & Staffing • Abernathy (TX)

Sur place
USD 48 000 - 59 000
Health insurance
Retirement benefits
Paid time off
Site Materials and Logistics Coordinator
Site Materials and Logistics Coordinator

LAMP • Liberty (TX)

Sur place
USD 90 000 - 130 000
Senior Material Control Lead - Data Center Logistics
Senior Material Control Lead - Data Center Logistics

EPI Power • Des Moines (IA)

Sur place
USD 65 000 - 90 000
Competitive pay
Benefits package
Growth opportunities
+2