Office Project Engineer — Construction Scheduling & Docs

Gibralter Border Barriers

El Paso (TX)

On-site

USD 75,000 - 110,000

Full time

4 days ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

Gibralter Border Barriers is seeking an Office Project Engineer to provide technical, documentation, scheduling, and project controls support for heavy civil and perimeter security construction projects.

This role collaborates closely with Project Managers, Project Engineers, Superintendents, subcontractors, inspectors, and clients to maintain accurate project records, track progress, and support successful project execution from startup through closeout.

Qualifications

  • Bachelor’s degree in a construction-related field is preferred.
  • Experience with heavy civil or perimeter security construction is preferred.
  • Experience with RFIs, submittals, change orders, and cost reporting is preferred.
  • Experience with Primavera P6 and MS Project is strongly preferred.

Responsibilities

  • Prepare, review, organize, and maintain project documentation, drawings, specifications, and records.
  • Submit and track RFIs, submittals, transmittals, material approvals, and change documentation.
  • Maintain project logs for RFIs, submittals, drawings, inspections, and procurement.
  • Review drawings and specs to identify conflicts and constructability issues.
  • Assist with developing and updating construction schedules using Primavera P6 and/or MS Project.
  • Track progress against baselines, milestones, and contractual requirements.
  • Assist with look-ahead schedules and identify schedule risks and delays.
  • Prepare progress reports and supporting documentation.
  • Assist with quantity takeoffs, material tracking, and progress measurements.
  • Support preparation and review of estimates, pay applications, and cost reports.
  • Monitor subcontractor progress and documentation status.
  • Coordinate procurement status and material deliveries.
  • Maintain QA/QC documentation and inspection records.
  • Coordinate project information with all stakeholders.
  • Maintain organized project files and closeout documentation.
  • Provide technical and administrative support through all project phases.

Skills

Reading construction drawings
Scheduling and project controls
Documentation management
Communication skills
Attention to detail
Team collaboration
Problem solving
Safety awareness

Education

Bachelor’s degree in Construction Management or Civil Engineering

Tools

Primavera P6 Professional
Microsoft Project
Excel

Job description

Gibralter Border Barriers is seeking an Office Project Engineer to provide technical, documentation, scheduling, and project controls support for heavy civil and perimeter security construction projects.

This role collaborates closely with Project Managers, Project Engineers, Superintendents, subcontractors, inspectors, and clients to maintain accurate project records, track progress, and support successful project execution from startup through closeout.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Office Project Engineer — Construction Controls
Office Project Engineer — Construction Controls

Gibraltar US, Inc. • El Paso (TX)

On-site
USD 70,000 - 95,000
Office Engineer
Office Engineer

Gibralter Border Barriers • El Paso (TX)

On-site
USD 75,000 - 110,000
Office Project Controls Engineer (Heavy Civil)
Office Project Controls Engineer (Heavy Civil)

Gibraltar Fabrication • El Paso (TX)

On-site
USD 70,000 - 100,000
Office Engineer
Office Engineer

Gibraltar Fabrication • El Paso (TX)

On-site
USD 70,000 - 100,000
Construction Project Controls Engineer
Construction Project Controls Engineer

Gibraltar Fabrication, LLC • El Paso (TX)

On-site
USD 70,000 - 95,000
Lead Project Manager - Heavy Civil and Federal Projects
Lead Project Manager - Heavy Civil and Federal Projects

Gibralter Border Barriers • Lukeville (AZ)

On-site
USD 120,000 - 180,000
Office Engineer
Office Engineer

Gibraltar US, Inc. • El Paso (TX)

On-site
USD 70,000 - 95,000
Office Engineer
Office Engineer

Gibraltar Fabrication, LLC • El Paso (TX)

On-site
USD 70,000 - 95,000
Field Project Engineer: Heavy Civil & Security Construction
Field Project Engineer: Heavy Civil & Security Construction

Gibraltar Fabrication • El Paso (TX)

On-site
USD 65,000 - 95,000
Field Project Engineer: Heavy Civil Scheduling
Field Project Engineer: Heavy Civil Scheduling

Gibraltar Fabrication • Santa Teresa (NM)

On-site
USD 70,000 - 100,000