Night-Shift Medical Lab Tech — Full-Time, Impactful Work

Opelousas General

Opelousas (LA)

Hybrid

USD 45,000 - 65,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Opelousas General is seeking a Medical Lab Technician for a full-time night shift in Opelousas, LA. The role involves performing a broad range of laboratory analyses across chemistry, hematology, microbiology, serology, urinalysis, and phlebotomy, including high-complexity testing.

The candidate will enter data, maintain equipment, monitor quality assurance, and communicate results to physicians and researchers. A relevant Associates degree is required; a Bachelor's is preferred.

Qualifications

  • Associates degree in medical technology or chemical, physical or biological science required.
  • Bachelors degree in medical technology or chemical, physical or biological science preferred.
  • Proficient in performing high-complexity testing.
  • Able to maintain quality assurance and regulatory compliance.
  • Ability to work flexible shifts as needed.

Responsibilities

  • Promotes the mission, vision, and values of the organization
  • Conducts chemical analysis of body fluids to determine normal/abnormal components.
  • Analyzes laboratory findings to check the accuracy of the results.
  • Enters data from analysis of medical tests and clinical results into computer for storage.
  • Operates, calibrates and maintains equipment used in quantitative and qualitative analysis and computer-controlled analyzers.
  • Establishes and monitors quality assurance programs and activities to ensure the accuracy of laboratory results.
  • Sets up, cleans and maintains laboratory equipment.
  • Provides technical information about test results to physicians, family members and researchers.
  • Collects and studies blood samples to determine the number of cells and compatibility for transfusion; uses microscopic techniques.
  • Analyzes samples of biological material for chemical content or reaction.
  • Identifies patient and labels all specimens with correct information.
  • Performs high-complexity testing.
  • Responds to results with STAT/NOW/timed specimen statuses.
  • Alters methods and procedures according to age-specific guidelines.
  • Prepares reagents for daily operations and performs maintenance.
  • Ensures adequate supplies for testing.
  • Notifies nursing/physician of critical values with documentation.
  • Maintains current documentation standards and policies.
  • Interacts with Laboratory Manager, Pathologist and staff; other customers.
  • Submits abnormal results to Pathologist.
  • Maintains knowledge of policy and regulatory requirements.
  • Presents records to accrediting inspectors as requested.
  • Demonstrates flexibility and teamwork under stress.
  • Offers support to co-workers.
  • Manages and operates lab equipment safely.
  • Consults with other departments to improve patient care.
  • Assists in compiling data for reports promptly.
  • Reviews pending reports and resolves outstanding specimens.
  • May work shifts other than assigned to ensure staffing.

Skills

Phlebotomy
Quality assurance
Data entry
Instrument maintenance
Communication

Education

Associate degree in medical technology
Bachelor's degree preferred

Job description

Opelousas General is seeking a Medical Lab Technician for a full-time night shift in Opelousas, LA. The role involves performing a broad range of laboratory analyses across chemistry, hematology, microbiology, serology, urinalysis, and phlebotomy, including high-complexity testing.

The candidate will enter data, maintain equipment, monitor quality assurance, and communicate results to physicians and researchers. A relevant Associates degree is required; a Bachelor's is preferred.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Night-Shift Medical Lab Tech - Full-Time
Night-Shift Medical Lab Tech - Full-Time

Opelousas General Health System • Opelousas (LA)

On-site
USD 52,000 - 68,000
Medical Lab Technician (full time)
Medical Lab Technician (full time)

Opelousas General Health System • Opelousas (LA)

On-site
USD 52,000 - 68,000
Medical Lab Technician (full time)
Medical Lab Technician (full time)

Opelousas General • Opelousas (LA)

Hybrid
USD 45,000 - 65,000
Night-Shift Medical Lab Technician (12-Hour)
Night-Shift Medical Lab Technician (12-Hour)

ochsner • Marrero (LA), New Orleans (LA)

On-site
USD 60,000 - 90,000
12-Hour Night Medical Lab Tech | Impactful Care
12-Hour Night Medical Lab Tech | Impactful Care

Ochsner Health • Marrero (LA)

On-site
USD 52,000 - 75,000
On-Call Medical Technologist – Multispecialty Lab
On-Call Medical Technologist – Multispecialty Lab

Opelousas General Health System • Opelousas (LA)

On-site
USD 55,000 - 75,000
Medical Lab Technologist – Night Shift
Medical Lab Technologist – Night Shift

Lifepoint Health® • Paris (TX)

On-site
USD 60,000 - 75,000
Health, Dental, Vision
401K Benefits
Competitive PTO
+2
Night-Shift Medical Lab Technologist | 7on/7off
Night-Shift Medical Lab Technologist | 7on/7off

LCMC Health • Marrero (LA)

On-site
USD 60,000 - 80,000
Night-Shift Medical Lab Tech: Impactful Care & Career Growth
Night-Shift Medical Lab Tech: Impactful Care & Career Growth

1103 Team Member Services • Redmond (OR)

On-site
USD 43,000 - 80,000
Medical Insurance
Dental Insurance
Vision Insurance
+9
Night Shift Clinical Lab Specialist
Night Shift Clinical Lab Specialist

Ochsner Health • Louisiana

On-site
USD 60,000 - 90,000