Master Scheduler: S&OP & Production Excellence

SureFire LLC

Fountain Valley (CA)

On-site

USD 85,000 - 105,000

Full time

44 hours ago
Be an early applicant
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

SureFire LLC in Fountain Valley, CA is seeking a Master Scheduler to lead the master production schedule, align manufacturing with demand, and minimize downtime. You will collaborate with production, procurement, engineering, and sales to optimize capacity and materials, ensuring on-time delivery and quality standards.

The role requires strong analytical skills, experience with ERP systems, and the ability to drive continuous improvement in scheduling processes.

Qualifications

  • Certification in APICS CPIM or CSCP preferred.
  • Proven experience leading demand consensus reviews in S&OP/IBP.
  • Strong proficiency in demand planning methodologies and statistical baseline analysis.
  • Balances Make-to-Order (MTO) and Make-to-Stock (MTS) with capacity and lead times.
  • Cross-functional facilitation and communication with Sales and Commercial teams.
  • Lean manufacturing knowledge is a plus.
  • Bachelor’s Degree in Operations Management, Business, or related field.
  • Up to 6 years of relevant work experience preferred.

Responsibilities

  • Facilitate monthly S&OP meeting to synchronize forecasts, demand, and plant capacity.
  • Drive consensus demand forecasting across sales and commercial teams.
  • Differentiate and manage MTO vs MTS demand plans against firm backlogs and production.
  • Analyze outlier demand and lead-time constraints with Sales to avoid disruptions.
  • Identify forecast variance and provide data-driven insights to improve accuracy.
  • Serve as bridge between Sales and Supply Planning for schedules.
  • Develop and maintain the master production schedule.
  • Monitor progress and adjust schedules for delays or demand changes.
  • Assess capacity constraints and material availability to optimize throughput.
  • Communicate schedule changes to stakeholders; ensure transparent execution.
  • Utilize ERP and scheduling software to track status and generate reports.
  • Identify and implement process improvements for scheduling accuracy.
  • Support demand planning and inventory management with scheduling data.
  • Maintain attendance, punctuality, and a cooperative attitude.

Education

Bachelor’s Degree in Operations Management or related field

Tools

Epicor ERP

Job description

SureFire LLC in Fountain Valley, CA is seeking a Master Scheduler to lead the master production schedule, align manufacturing with demand, and minimize downtime. You will collaborate with production, procurement, engineering, and sales to optimize capacity and materials, ensuring on-time delivery and quality standards.

The role requires strong analytical skills, experience with ERP systems, and the ability to drive continuous improvement in scheduling processes.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Master Scheduler: Optimize Production & On-Time Deliveries
Master Scheduler: Optimize Production & On-Time Deliveries

Littelfuse • Chicago (IL)

Hybrid
USD 90,000 - 120,000
Flexible work arrangements
Competitive compensation and benefits
Master Scheduler - Production Planning & S&OP Excellence
Master Scheduler - Production Planning & S&OP Excellence

Faurecia • Louisville (KY)

On-site
USD 65,000 - 90,000
Master Scheduler
Master Scheduler

Star Brands - A Division of the Middleby Corporation • Smithville (TN)

On-site
USD 85,000 - 130,000
Master Scheduler
Master Scheduler

STAR INTERNATIONAL HOLDINGS • Smithville (TN)

On-site
USD 85,000 - 120,000
Strategic Master Scheduler & S&OP Leader
Strategic Master Scheduler & S&OP Leader

Ralliant • Hollister (CA)

Hybrid
USD 92,000 - 170,000
Bonus eligibility
Master Scheduler: Optimize Demand, Capacity & Delivery
Master Scheduler: Optimize Demand, Capacity & Delivery

Forgent Power Solutions, Inc. • Waco (TX)

On-site
USD 80,000 - 100,000
Master Scheduler
Master Scheduler

PAC Worldwide • Steuben Township (PA)

On-site
USD 80,000 - 120,000
Master Scheduler: Optimize Production & Delivery
Master Scheduler: Optimize Production & Delivery

PAC Worldwide • Steuben Township (PA)

On-site
USD 80,000 - 120,000
Master Scheduler
Master Scheduler

Atrio Search • Los Angeles (CA)

On-site
USD 85,000 - 135,000
Master Scheduler: Orchestrate Fast-Paced Production Plans
Master Scheduler: Orchestrate Fast-Paced Production Plans

ProAmpac • Bethlehem

On-site
USD 85,000 - 115,000