Master Scheduler, Fiber Optic Supply Chain

Prysmian

Jackson (TN)

On-site

USD 75,000 - 110,000

Full time

38 hours ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Prysmian Jackson, a fiber optic cable manufacturer, seeks a Master Scheduler to develop and maintain the rolling MPS, translate forecasts into production plans, and balance capacity with demand. You will work with Sales, Customer Service, and Procurement to ensure on-time delivery and optimized inventory in a fast-paced plant environment.

The role requires 5+ years in production planning, strong ERP/MRP experience (SAP/Oracle/JD Edwards), and advanced Excel skills.

Qualifications

  • Bachelor’s degree in Supply Chain, Engineering, Operations, or related field.
  • Minimum 5 years of production planning, master scheduling, or supply chain experience in manufacturing.
  • Experience with ERP/MRP systems (SAP, Oracle, JD Edwards, or similar).
  • Strong analytical, organizational, and problem-solving skills.
  • Advanced Microsoft Excel skills.
  • Excellent communication and cross-functional collaboration abilities.
  • Ability to manage multiple priorities in a dynamic manufacturing environment.

Responsibilities

  • Develop and maintain a rolling Master Production Schedule (MPS) for fiber optic cable and related products.
  • Translate customer demand forecasts and sales orders into executable production schedules.
  • Balance manufacturing capacity, labor availability, equipment constraints, and material supply.
  • Monitor schedule adherence and adjust plans to address changing priorities and challenges.
  • Lead weekly production planning and scheduling meetings with cross-functional teams.
  • Collaborate with Demand Planning, Sales, and Customer Service to review forecasts and customer requirements.
  • Analyze inventory levels and maintain optimal stock to support service and financial objectives.
  • Identify demand fluctuations, risks, and capacity gaps and develop mitigation plans.
  • Drive inventory reduction initiatives while maintaining required customer service levels.
  • Partner with Procurement to ensure raw material availability aligns with production schedules.
  • Coordinate with Operations and Manufacturing leaders regarding machine utilization and production capacity.
  • Work closely with Logistics to support shipment commitments and customer delivery requirements.
  • Communicate schedule changes, constraints, and recovery plans to stakeholders.
  • Monitor and report key planning metrics including: Schedule attainment, On-time delivery, Inventory turns, Capacity utilization, Customer service levels, Production adherence.
  • Analyze production performance and recommend schedule improvements.
  • Support continuous improvement initiatives to enhance planning accuracy and manufacturing efficiency.
  • Maintain planning parameters and scheduling data within ERP/MRP systems.
  • Ensure accuracy of bills of materials, lead times, routing information, and planning master data.
  • Support implementation and optimization of planning tools and reporting systems.

Skills

ERP/MRP proficiency
Advanced Excel
Analytical thinking
Cross-functional collaboration
Problem-solving

Education

Bachelor's degree in Supply Chain or related field

Tools

SAP
Oracle
JD Edwards

Job description

Prysmian Jackson, a fiber optic cable manufacturer, seeks a Master Scheduler to develop and maintain the rolling MPS, translate forecasts into production plans, and balance capacity with demand. You will work with Sales, Customer Service, and Procurement to ensure on-time delivery and optimized inventory in a fast-paced plant environment.

The role requires 5+ years in production planning, strong ERP/MRP experience (SAP/Oracle/JD Edwards), and advanced Excel skills.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Fiber Optic Supply Chain Master Scheduler
Fiber Optic Supply Chain Master Scheduler

Prysmian Group • Missouri

On-site
USD 75,000 - 105,000
Supply Chain Planner
Supply Chain Planner

Prysmian Group • Jackson (TN)

On-site
USD 85,000 - 115,000
Supply Chain Planner
Supply Chain Planner

Prysmian • Jackson (TN)

On-site
USD 75,000 - 110,000
Jackson Supply Chain Planner
Jackson Supply Chain Planner

Prysmian Group • Missouri

On-site
USD 75,000 - 105,000
Supply Chain Planner
Supply Chain Planner

Prysmian • Lexington (SC)

On-site
USD 95,000 - 125,000
Supply Chain Planner
Supply Chain Planner

Prysmian Group • Lexington (SC)

On-site
USD 85,000 - 110,000
Master Scheduler: Optimize Demand, Capacity & Delivery
Master Scheduler: Optimize Demand, Capacity & Delivery

Forgent Power Solutions, Inc. • Waco (TX)

On-site
USD 80,000 - 100,000
Master SAP Planner: End-to-End Supply Chain Leader
Master SAP Planner: End-to-End Supply Chain Leader

Prysmian Group • Lexington (VA)

On-site
USD 85,000 - 110,000
Master Scheduler: Optimize Production & On-Time Deliveries
Master Scheduler: Optimize Production & On-Time Deliveries

Littelfuse • Chicago (IL)

Hybrid
USD 90,000 - 120,000
Flexible work arrangements
Competitive compensation and benefits
Strategic Supply Chain Master Planner
Strategic Supply Chain Master Planner

Prysmian • Lexington (SC)

On-site
USD 95,000 - 125,000