Master Coordinator

pjm

Lower Providence Township (PA)

On-site

USD 110,000 - 160,000

Full time

6 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

PJM is seeking a Master Coordinator to ensure the PJM system is scheduled in accordance with Market Rules and to administer PJM energy market transactions per current rules. The role involves real-time, often autonomous action to shedding of firm load to prevent violations, and is an entry point with progression opportunities to Generation Dispatcher.

The position requires knowledge of electricity theory, PJM policies, and complex scheduling tools, with a 24/7 rotating shift, training, and

Qualifications

  • Thorough understanding of electricity and interconnected system operations and PJM policies.
  • Forecasting techniques and analysis methodology.
  • Familiarity with PJM markets, operating policies and unit scheduling procedures.

Responsibilities

  • Maintain power system reliability by ensuring operations comply with NERC standards and PJM procedures.
  • Operate PJM OASIS site and provide customer support for energy scheduling.
  • Process inquiries for energy transactions, scheduling, and generation outage information.
  • Represent PJM as contact for OASIS, TMS, EES, NERC IDC, OATI and related systems.
  • Direct and optimize scheduling of generating units to meet load and reserve requirements.
  • Monitor generator capability changes, return dates, and operating constraints.

Job description

On-site Position - Audubon, PA

A Master Coordinator is responsible for ensuring the PJM system is properly scheduled in accordance with PJM Market Rules and ensure that transactions in the PJM energy market are administered consistent with current rules and procedures. Additionally, s/he has the responsibility and the authority to take direct and timely real-time actions (without obtaining higher level approval) including directing shedding of firm load to prevent or alleviate System Operating Limit or Reliability Operating Limit Violations.

Master Coordinators must have a thorough understanding or the technical ability to obtain a thorough understanding of:

  • The basic principles and theory of electricity and interconnected system operations, including all PJM operating and safety policies sufficient to maintain system reliability and robust markets.
  • Forecasting techniques and analysis methodology.
  • PJM Member Company operating policies, PJM markets, and unit scheduling procedures as well as an awareness of those of neighboring systems and their interactions with PJM.
  • PJM computer systems, the real-time scheduling and transaction programs, the interrelationships of PJM Member Company and NERC tagging computer systems.
  • Understanding of the regional transmission tariff by coordinating the scheduled use of transmission service and implementing curtailments as necessary.

This is a rotating shift position and requires staffing 7 x 24 including holidays. This position requires successful testing through the Profiles XT assessment and obtaining NERC/PJM Certification and other training requirements within the allotted timeframe. The Profiles XT assessment is a validated testing process that evaluates the success of system operators at PJM.

The Master Coordinator position is as an entry point for all new hires and requires advancement to the next level - Generation Dispatcher - within a specified time period. All Master Coordinators must receive training and pass tests (written and simulator) for the Generation Dispatcher position no later than whenever management determines an on‑job trainer is available for him/her and s/he has completed the necessary 12 week training period.

Master Coordinator Training:

Training includes online training, self‑study, one‑on‑one training, simulations, and On the Job Training (OJT). Twelve weeks of the training program consists of OJT under the supervision of an OJT trainer who guides the trainee in acquiring the knowledge and skills required for the position. Prior to being qualified as a Master Coordinator the candidate is required to successfully complete the Master Coordinator computer based final exam with a minimum score of 80%. The candidate is also required to successfully complete a hands‑on examination on the Operator Training Simulator (OTS) with a minimum score of 80%.

This position requires successful testing through the Profiles XT assessment and obtaining NERC certification at the Reliability Coordinator or Balancing and Interchange level and PJM Generation certification and other training requirements within the allotted timeframe. The Profiles XT assessment is a validated testing process that evaluates the success of system operators at PJM.

Additionally, the Master Coordinator has the responsibility and the authority to take direct and timely real‑time actions (without obtaining higher level approval) including directing shedding of firm load to prevent or alleviate System Operating Limit or Reliability Operating Limit Violations.

Essential Functions:
  • Maintain power system reliability by ensuring operations are in compliance with applicable NERC standards and PJM operating and emergency procedures.
  • Operates PJM OASIS site and provides customer support to the energy scheduling process.
  • Process all customer inquiries and requests for energy transactions, scheduling, and generation outage information in a timely and effective manner.
  • Represent PJM as contact personnel for the following systems: OASIS, TMS, EES, NERC IDC, OATI, eDart generator outages, Supplemental Status Report, Generation Checkout, and Second Pass Commitment questions.
  • Directs the scheduling of generating units of the PJM participants to meet the PJM load and reserve requirements for future operating periods to gain maximum system economy within established PJM reliability criteria.
  • Monitors generating unit (over 1000 generators) capability changes, return dates, operating constraints, start‑up and minimum run times.
  • Works in conjunction with PJM's Market Operations and Reliability Engineers to determine the generator unit scheduling strategy and directs the implementation of that strategy through the PJM participants.
  • Monitors and adjusts the strategy as changes on the actual system occur.
  • Forecasts (and revises) the PJM system load forecast for the next seven days by monitoring weather forecasts throughout the PJM service territory.
  • Monitors all input data to the scheduling and transa
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Master Coordinator
Master Coordinator

PJM Interconnection, LLC • Lower Providence Township (PA)

On-site
USD 90,000 - 130,000
Master Coordinator
Master Coordinator

PJM Interconnection • Lower Providence Township (PA)

On-site
USD 70,000 - 110,000
Master Coordinator
Master Coordinator

PJM Interconnection • Audubon (NJ)

On-site
USD 90,000 - 120,000
Master Coordinator
Master Coordinator

PJM Interconnection, LLC • Audubon (IA)

On-site
USD 95,000 - 130,000
Medical, vision and dental insurance
401(k) plan with employer match
Paid vacation and holidays
+2
PJM Master Coordinator - Real-Time Grid Scheduler (On-Site)
PJM Master Coordinator - Real-Time Grid Scheduler (On-Site)

PJM Interconnection, LLC • Lower Providence Township (PA)

On-site
USD 90,000 - 130,000
PJM Master Dispatcher & Energy Markets Coordinator
PJM Master Dispatcher & Energy Markets Coordinator

PJM Interconnection • Audubon (NJ)

On-site
USD 90,000 - 120,000
Senior Energy Grid Operations Coordinator
Senior Energy Grid Operations Coordinator

PJM Interconnection • Lower Providence Township (PA)

On-site
USD 70,000 - 110,000
Real-Time Grid Scheduler & Reliability Lead
Real-Time Grid Scheduler & Reliability Lead

pjm • Lower Providence Township (PA)

On-site
USD 110,000 - 160,000
System Operator
System Operator

EverLine - Energy's Technical Stack • Houston (TX)

On-site
USD 90,000 - 120,000
System Operator
System Operator

EVERLINE TECH OPS LLC • Houston (TX)

On-site
USD 90,000 - 130,000