Manufacturing Program Manager, Earned Value & Cost Control

Lockheed Martin

Stratford (CT)

On-site

USD 118,000 - 219,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Medical
Dental
Vision
Flexible work schedules
401(k) match
Paid time off
Holidays
Parental Leave
Education Assistance
Life Insurance
Short-Term Disability
Long-Term Disability

Job summary

Lockheed Martin is seeking a Manufacturing Program Manager (MPM) embedded within a designated Product Center. The role serves as the single point of contact for program-wide cost, schedule, quality, risk, and change-control activities.

Responsibilities include aligning the Production Build Plan with Operations, forecasting EV tracking, and owning financial accountability as CAM. The position emphasizes cross-functional collaboration and data-driven decision making to deliver on time and within

Qualifications

  • Experience in program operations, logistics, or supply chain management.
  • Strong analytical and problem-solving skills, ability to manage competing deadlines.
  • Excellent organizational and communication abilities for collaboration with customers.
  • Ability to analyze data and drive process improvements to optimize delivery performance.

Responsibilities

  • Program Integration – Align and coordinate the Production Build Plan with Operations; ensure all manufacturing plans are developed, maintained, and executed on schedule and within budget.
  • Strategic Translation – Convert Product Center strategy into forecasting, resource allocation, and earned‑value tracking.
  • Financial & Schedule Ownership – Serve as the CAM; provide financial accountability through EV reporting and variance analysis.
  • Performance Metrics – Track indicators such as PI and HPU; support on‑time delivery and affordability goals.
  • Reporting & Liaison – Produce EV/financial reports and coordinate with stakeholders across functions.
  • Risk & Opportunity Management – Maintain a risk register and implement mitigation actions.

Skills

Earned-value mgmt
Integrated schedule
Risk mitigation
Cross-functional
Data-driven decisions

Job description

Lockheed Martin is seeking a Manufacturing Program Manager (MPM) embedded within a designated Product Center. The role serves as the single point of contact for program-wide cost, schedule, quality, risk, and change-control activities.

Responsibilities include aligning the Production Build Plan with Operations, forecasting EV tracking, and owning financial accountability as CAM. The position emphasizes cross-functional collaboration and data-driven decision making to deliver on time and within

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Security-Cleared Manufacturing Program Lead
Security-Cleared Manufacturing Program Lead

Lockheed Martin • Liverpool Township (OH)

On-site
USD 85,000 - 158,000
Medical insurance
Dental insurance
Vision insurance
+5
Manufacturing Project Leader - Lean, Schedule & Risk
Manufacturing Project Leader - Lean, Schedule & Risk

Lockheed Martin • Town of Owego (NY)

On-site
USD 85,000 - 158,000
Medical insurance
Dental insurance
Vision insurance
+8
Aerospace Project Engineer — Lead PBCS & EVMS
Aerospace Project Engineer — Lead PBCS & EVMS

Lockheed Martin • Englewood (CO)

On-site
USD 96,000 - 178,000
Medical
Dental
Vision
+3
Project Engineering Manager - Lean Manufacturing & CAM
Project Engineering Manager - Lean Manufacturing & CAM

Lockheed Martin • Town of Owego (NY)

On-site
USD 129,000 - 240,000
Medical, Dental, Vision
401(k) match
Paid time off
+8
Manufacturing Engineering Manager, Advanced Programs
Manufacturing Engineering Manager, Advanced Programs

Lockheed Martin • Grand Prairie (TX)

On-site
USD 129,000 - 240,000
Medical benefits
Flexible work arrangements
401(k) match
Manufacturing Planner Lead - MRP & Lean Ops
Manufacturing Planner Lead - MRP & Lean Ops

Lockheed Martin • Chelmsford (MA)

On-site
USD 100,000 - 186,000
Medical
Dental
Vision
+11
Manufacturing Project Manager: Earned Value Lead
Manufacturing Project Manager: Earned Value Lead

Textron Systems • Wilmington (MA)

On-site
USD 90,000 - 120,000
Manufacturing Program Manager — Cross-Functional Execution
Manufacturing Program Manager — Cross-Functional Execution

LHH Recruitment Solutions • Goldsboro (NC)

On-site
USD 110,000 - 140,000
Senior Manufacturing Planner & Production Control Lead
Senior Manufacturing Planner & Production Control Lead

Lockheed Martin • Palmdale (CA)

On-site
USD 100,000 - 186,000
Medical, Dental, Vision
Flexible work arrangements
401(k) match
+1
Manufacturing Planning Lead — MRP, BOM & Logistics
Manufacturing Planning Lead — MRP, BOM & Logistics

Lockheed Martin • Moorestown Township (NJ)

On-site
USD 100,000 - 186,000
Medical, Dental, Vision
Flexible work arrangements
401(k) match
+8