Logistics & Expediting Lead - Critical-Path Equipment

Hut 8 Corp.

Miami, Northern (FL, KY)

Hybrid

USD 110,000 - 170,000

Full time

2 days ago
Be an early applicant
Application generator

Stand out for this role — generate a tailored resume and cover letter in about a minute.

Get past ATS filters

Job summary

Hut 8 Corp. is seeking a Logistics & Expediting Manager to own inbound logistics, freight, and delivery scheduling for major data center equipment. Ensure critical-path items arrive on time, with no surprises, including transformers, switchgear, generators, and chillers.

Responsibilities include planning heavy-haul routes, permits, escorts, coordinating with vendors, tracking factory milestones, FAT scheduling, and ship-date protection. Travel 25–40%. This role is based at our Miami HQ.

Qualifications

  • 5+ years in project logistics, traffic, or expediting for major capital projects (data centers, heavy industrial).
  • Hands-on heavy-haul experience: permits, routing studies, escorts, rigging interfaces for loads in 100k–500k+ lb class.
  • Vendor expediting depth: factory milestone tracking, FAT logistics, and holding OEMs accountable to ship dates.
  • Freight terms, cargo insurance, and claims knowledge.
  • Customs/import experience for international equipment a plus.

Responsibilities

  • Own inbound logistics plan for major equipment: transformers, MV/LV switchgear, generators, chillers, CDUs, UPS systems.
  • Plan heavy-haul routing, permits, escorts, and site delivery windows aligned to crane schedules.
  • Run expediting on critical-path POs; track factory milestones and coordinate FAT scheduling.
  • Select and manage freight forwarders and carriers; manage freight terms, insurance, and OS&D; handle customs when needed.
  • Report logistics status and risks; build Hut 8's logistics playbook for future POs.

Skills

5+ years logistics experience
Heavy-haul experience
Vendor expediting
Freight terms & insurance
Incoterms knowledge
Customs/import experience
Scheduling & planning
Excel proficiency
ERP exposure
Travel 25-40%

Tools

Excel
ERP

Job description

Hut 8 Corp. is seeking a Logistics & Expediting Manager to own inbound logistics, freight, and delivery scheduling for major data center equipment. Ensure critical-path items arrive on time, with no surprises, including transformers, switchgear, generators, and chillers.

Responsibilities include planning heavy-haul routes, permits, escorts, coordinating with vendors, tracking factory milestones, FAT scheduling, and ship-date protection. Travel 25–40%. This role is based at our Miami HQ.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Logistics & Expediting Manager
Logistics & Expediting Manager

Hut 8 Corp. • Miami (FL), Northern (KY)

Hybrid
USD 110,000 - 170,000
Senior Customer Project Manager, Data Center Delivery
Senior Customer Project Manager, Data Center Delivery

Hut 8 • Miami (FL)

On-site
USD 110,000 - 150,000
Medical Insurance
Dental Insurance
Vision Insurance
+2
On-Site Materials Manager for Data Center Build
On-Site Materials Manager for Data Center Build

Hut 8 Corp. • Houston (TX)

On-site
USD 70,000 - 100,000
Supply Chain Engineer - P2P & Logistics
Supply Chain Engineer - P2P & Logistics

Hut 8 • Miami (FL)

On-site
USD 55,000 - 85,000
Medical insurance
Dental insurance
Vision insurance
+2
Global Logistics Operations Lead for Data Centers
Global Logistics Operations Lead for Data Centers

Meta • Huntsville (AL)

On-site
USD 115,000 - 163,000
Global Parts & Logistics Lead – Service & Projects
Global Parts & Logistics Lead – Service & Projects

HITEC Power Protection BV • Rosenberg (TX), Northern (KY)

Hybrid
USD 85,000 - 110,000
Project Logistics Coordinator (Power Generation)
Project Logistics Coordinator (Power Generation)

Airswift • Houston (TX)

On-site
USD 60,000 - 85,000
On-Site Materials Manager, Data Center Construction
On-Site Materials Manager, Data Center Construction

Hut 8 Corp. • Austin (TX)

On-site
USD 65,000 - 98,000
On-Site Materials Lead for Data Center Build
On-Site Materials Lead for Data Center Build

Hut 8 Corp. • Corpus Christi (TX)

On-site
USD 70,000 - 110,000
Director, Preconstruction & Build Readiness
Director, Preconstruction & Build Readiness

Hut 8 Corp. • Miami (FL)

On-site
USD 180,000 - 280,000