Gas Turbine Package Systems Integration Lead

GE Vernova

Greenville (SC)

On-site

USD 98,000 - 164,000

Full time

14 days+
Application generator

Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.

Get past ATS filters

Benefits offered by this job

Medical, dental, vision and Rx
Retirement Savings Plan with company
Tuition assistance
Paid holidays and leave
Relocation assistance

Job summary

GE Vernova is seeking an Aeroderivative Systems Integration Leader to drive program plans for gas turbine generator packages, balancing technical, production, and business needs with a cross-discipline team.

The role defines detailed work scope, performs system trades, sets priorities, and manages budgets. It requires strong communication, leadership, and a solid background in gas turbine engineering, with experience in NPI, RAM, RAM or PCO programs where applicable.

Qualifications

  • 6 years of technical experience in gas turbines, accessories, plant, or controls engineering (USA).
  • Bachelor of Science in Engineering required.

Responsibilities

  • Partners with cross-discipline engineering teams to develop program plans that meet technical, production, and business requirements.
  • Translates product requirements into documented technical requirements for the engineering team to achieve.
  • Leads execution with engineering teams to ensure program plans are progressing to deliver on-time and within budget for a set scope of work from program scoping to validation completion.
  • Resolves system level technical issues. Performs trade studies with engineering teams to ensure PRD CTQ’s are met.
  • Defines scope, schedule, cost, and risk mitigation plans to achieve technical product requirements for package proposals outside of quoting limits.
  • Demonstrates clear technical communication across engineering, commercial and supply chain organizations.
  • Participates as a presenter or reviewer in technical and program reviews with engineering leadership.

Skills

Gas turbine knowledge
Controls engineering
Systems engineering
Cross-functional collaboration
Technical communication
Leadership

Education

Bachelor of Science in Engineering
Master of Science in Engineering

Job description

GE Vernova is seeking an Aeroderivative Systems Integration Leader to drive program plans for gas turbine generator packages, balancing technical, production, and business needs with a cross-discipline team.

The role defines detailed work scope, performs system trades, sets priorities, and manages budgets. It requires strong communication, leadership, and a solid background in gas turbine engineering, with experience in NPI, RAM, RAM or PCO programs where applicable.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Systems Integration Lead, Gas Turbine Packages
Senior Systems Integration Lead, Gas Turbine Packages

GE-Vernova- • Greenville (SC)

On-site
USD 98,000 - 164,000
Relocation assistance
Health benefits
Retirement plan
Senior Systems Integration Lead - Gas Turbine Packages
Senior Systems Integration Lead - Gas Turbine Packages

A01242 GE Gas Turbines (Greenville) L.L.C. • South Carolina

On-site
USD 98,000 - 164,000
Medical, dental, vision
Retirement plan with 401(k)
Tuition assistance
+2
Aeroderivative PM: New Units & Packaging Strategy
Aeroderivative PM: New Units & Packaging Strategy

GE Vernova, Inc. • Houston (TX)

On-site
USD 134,000 - 223,000
Medical insurance
Dental insurance
Vision coverage
+10
Global Gas Turbine Services Program Lead
Global Gas Turbine Services Program Lead

LS3002 GE Vernova Operations LLC • Houston (TX)

On-site
USD 134,000 - 223,000
Medical, dental, vision, prescription
401(k) with company match
Tuition assistance
+6
Gas Turbine Systems Product Definition Engineer (CAD)
Gas Turbine Systems Product Definition Engineer (CAD)

GE Vernova, Inc. • Greenville (NC)

On-site
USD 72,000 - 108,000
Medical, dental, vision benefits
Retirement savings plan (401k) with GE
Paid holidays
Lead Package Systems Integration Leader
Lead Package Systems Integration Leader

GE Vernova • Greenville (SC)

On-site
USD 98,000 - 164,000
Medical, dental, vision and Rx
Retirement Savings Plan with company
Tuition assistance
+2
Lead Mechanical Engineer: Gas Turbine Hardware & Analysis
Lead Mechanical Engineer: Gas Turbine Hardware & Analysis

LS3002 GE Vernova Operations LLC • South Carolina

On-site
USD 105,000 - 148,000
Gas Turbine Systems Design Engineer – Fluid & Packaging
Gas Turbine Systems Design Engineer – Fluid & Packaging

GE Vernova, Inc. • Greenville (NC)

On-site
USD 72,000 - 108,000
Relocation assistance
Medical, dental, vision benefits
401(k) retirement plan
+2
Aero Gas Turbine Engineering Lead
Aero Gas Turbine Engineering Lead

Aero Alliance • Houston (TX)

On-site
USD 98,000 - 164,000
Medical
Dental
Vision
+3
Senior Wind Systems Integration Engineer
Senior Wind Systems Integration Engineer

GE Vernova • Greenville (SC)

On-site
USD 113,000 - 189,000
Medical coverage
Dental coverage
Vision coverage
+5