Four-Week Production Planner – Critical-Path Mastery

Custom Control Sensors

Phoenix (AZ)

On-site

USD 65,000 - 95,000

Full time

32 hours ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Custom Control Sensors, LLC in Phoenix, AZ, seeks a Production Planner to translate the master schedule into a four-week loaded plan, protect the critical path and resolve material needs. You will own loading, sequencing and capacity visibility while coordinating with Manufacturing, Materials and Purchasing.

The role relies on ERP/MRP planning in SyteLine, with direct-buy authority for in-process materials and a focus on on-time delivery in a high-reliability environment.

Qualifications

  • Experience in manufacturing production planning and capacity loading.
  • ERP/MRP experience; Infor SyteLine preferred.
  • Associates or Bachelor's degree in Supply Chain or related field.
  • ASCM/APICS CPIM training valued.
  • Ability to load four-week plan and monitor critical-path milestones.

Responsibilities

  • Four-week loaded production plan: Build and maintain a rolling four-week schedule by cell and work center.
  • Work-order sequencing and releases within master-plan priorities.
  • Capacity and bottleneck visibility to identify overloads and recovery options.
  • Targeted direct buying for in-process materials as needed.
  • End-to-end critical-path management across components, assembly, inspection and shipment.
  • ERP/MRP planning and data integrity in SyteLine; accurate planning data.

Skills

Production planning
Direct-material coordination
Capacity loading
ERP/MRP experience

Education

Associate’s or bachelor’s degree in Supply Chain, Operations or related field
ASCM/APICS CPIM training valued

Tools

Infor SyteLine

Job description

Custom Control Sensors, LLC in Phoenix, AZ, seeks a Production Planner to translate the master schedule into a four-week loaded plan, protect the critical path and resolve material needs. You will own loading, sequencing and capacity visibility while coordinating with Manufacturing, Materials and Purchasing.

The role relies on ERP/MRP planning in SyteLine, with direct-buy authority for in-process materials and a focus on on-time delivery in a high-reliability environment.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Four-Week Production Planner: Critical Path & Capacity
Four-Week Production Planner: Critical Path & Capacity

Ccsdualsnap • Phoenix (AZ)

On-site
USD 60,000 - 90,000
Strategic Master Production Scheduler | 13-Week Plan Expert
Strategic Master Production Scheduler | 13-Week Plan Expert

Ccsdualsnap • Phoenix (AZ)

On-site
USD 90,000 - 120,000
Strategic Master Scheduler: 13-Week Planning Lead
Strategic Master Scheduler: 13-Week Planning Lead

Custom Control Sensors • Phoenix (AZ)

On-site
USD 90,000 - 120,000
Production Planner
Production Planner

Custom Control Sensors • Phoenix (AZ)

On-site
USD 65,000 - 95,000
Production Planner
Production Planner

Ccsdualsnap • Phoenix (AZ)

On-site
USD 60,000 - 90,000
Master Production Scheduler
Master Production Scheduler

Custom Control Sensors • Phoenix (AZ)

On-site
USD 90,000 - 120,000
Master Production Scheduler
Master Production Scheduler

Ccsdualsnap • Phoenix (AZ)

On-site
USD 90,000 - 120,000
Hybrid Senior Production Planner & Master Scheduler
Hybrid Senior Production Planner & Master Scheduler

Aleron • Phoenix (AZ)

Hybrid
USD 29,000 - 42,000
Hybrid-flex role
Cross-functional collaboration
Fast-paced environment
+1
Production Planner
Production Planner

Russell Tobin • Phoenix (AZ)

On-site
USD 41,328 - 48,505
Comprehensive healthcare coverage
401(k)
Life and disability insurance
+1
Materials Planner I — Fast-Paced Lean Inventory Mastery
Materials Planner I — Fast-Paced Lean Inventory Mastery

Phoenix Contact USA • Middletown Township (PA)

On-site
USD 58,000 - 78,000
Medical, dental, and vision coverage
401k matching
Generous paid time off
+2