A complete application in a minute
Tailored resume and cover letter, ready to send.
Custom Control Sensors, LLC in Phoenix, AZ is seeking a Production Planner to translate the master schedule into four-week executable work, ensure adherence to the critical path, and manage direct-material needs. The role collaborates with Manufacturing and Materials to minimize delays and protect on-time delivery.
The planner will own loading, sequencing, and the four-week plan, with responsibilities for capacity checks, direct buy decisions, and daily plan-versus-actual recovery to support the
If you are unable to complete this application due to a disability, contact this employer to ask for an accommodation or an alternative application process.
PRODUCTION CONTROL Full Time Indirect Phoenix, AZ, US
2 days ago Requisition ID: 1114
Translate the master plan into four weeks of executable work, protect the critical path and resolve targeted direct-material needs.
CUSTOM CONTROL SENSORS, LLC | PHOENIX, AZ | FULL TIME · EXEMPT
Custom Control Sensors (CCS) designs and manufactures high-reliability pressure, temperature and liquid flow switches and sensors for aerospace, defense and industrial markets. Since 1957, our products have incorporated the DUAL-SNAP action disc spring principle pioneered by CCS. We serve customers whose expectations for product quality, delivery and regulatory compliance are exacting. CCS operates under ISO 9001 and AS9100 quality systems and applicable FAA PMA, product and export-control requirements.
You are a disciplined manufacturing planner who turns master-schedule priorities into realistic, loaded cell schedules. You understand routings, standard hours, capacity, material lead times and the dependencies that drive customer delivery. You make informed, limited direct purchases when needed, expose critical-path risks early and close actions with Manufacturing and Materials.
CCS needs a credible four-week plan that makes each production constraint visible before it delays a customer commitment. The Master Production Scheduler owns the annual and rolling 13-week plan; the Production Planner owns detailed loading, sequencing and the critical path through assigned cells. Focused buying for in-process or one-off direct needs removes delays without replacing strategic Purchasing.
Partner across functions so the detailed plan is executable while decision authority stays clear.
Master production scheduling: The Master Production Scheduler owns annual and rolling 13-week planning, cross-site priorities and promise-date feasibility. This role owns detailed four-week loading, execution dependencies and critical-path visibility for the assigned area.
Manufacturing execution: Plant Managers and supervisors own labor deployment, production choices, overtime approvals and completed output. This role develops the executable sequence and raises issues requiring production decisions.
Strategic purchasing and suppliers: Purchasing owns recurring direct-material sourcing, supplier selection, long-term agreements, negotiated pricing, payment terms and supplier T&Cs. The Planner places only authorized in-process or one-off direct buys under approved suppliers, controls and spending authority; escalates exceptions for approval.
Engineering, Quality and systems: Engineering and Programming own technical content, drawings, routings and approved changes; Quality retains independent holds, acceptance and release. Business Systems & Technology owns the ERP platform and security controls.
Performance is reviewed against the separate Right Seat Framework Performance Scorecard. Primary outcomes include four-week loaded-plan completeness and stability, on-time completion of critical-path milestones and exception recovery, schedule adherence, planned-start readiness, direct one-off purchase need-date performance, and ERP accuracy. Targets, approved purchasing limits and baselines are established with leadership. Manufacturing owns production execution and shipment OTD.
Successful performance includes these six role‑specific competencies. CCS Standards, Safety and Compliance remain company-wide expectations.
Four-Week Loaded Planning
Maintains a realistic, work-center-level plan aligned to master priorities and demonstrated capacity.
Critical-Path Management
Tracks controlling dependencies, milestones, owners and due dates; escalates at-risk commitments early.
Direct Buying Discipline
Sources authorized in-process and one-off direct needs with accurate specifications, lead times, costs and approvals.
Schedule Recovery Judgment
Uses daily plan-versus-actual facts to identify bottlenecks and recommend practical recovery actions.
ERP/MRP Data Integrity
Keeps work-order timing, cell loading and authorized purchasing records timely and traceable.
Cross-Functional Execution
Coordinates plants, Materials, Purchasing, Quality and the Master Scheduler with clear actions and due dates.
This role includes office and manufacturing environments, including walking production areas, standing, sitting and computer work. Reasonable accommodations may be made for qualified individuals.
CCS is an Equal Opportunity Employer. Employment decisions are made without unlawful discrimination under applicable law.