Evening ER CNA - Sign-On Bonus & Full-Time Impact

Prime Healthcare

Leavenworth (KS)

On-site

USD 32,000 - 42,000

Full time

6 days ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Health, dental, and vision insurance
Paid vacation, sick time and holidays
Bereavement leave, FMLA and otherleave
Employer 401K options
Tuition reimbursement
Life and disability insurance
Other benefits

Job summary

Prime Healthcare is hiring an Emergency Room CNA at Saint John Hospital in Leavenworth, KS. The Evening shift runs from 10:45am to 11:15pm, and the position is full-time.

The ER CNA supports nurses and doctors, monitors patient vital signs, assists with procedures, and ensures supplies are stocked in a fast-paced ED. Responsibilities include helping patients with basic needs, transporting patients, recording observations, and maintaining infection control.

Qualifications

  • Current Certified Nursing Assistant certificate upon hire, required.
  • Current BLS upon hire and maintain current.
  • Possesses knowledge of Medical Terminology.
  • Minimum six months of previous experience in an acute care hospital or physician's office preferred.

Responsibilities

  • Help patients with basic needs (bathing, dressing, toileting), reposition and transfer patients as needed.
  • Monitor and record vital signs (blood pressure, pulse, temperature, respiration), assist with wound care and dressing changes under supervision.
  • Prepare rooms and ensure medical supplies are stocked, transport patients within the hospital (to imaging or other departments).
  • Assist with procedures (e.g., setting up equipment, applying splints), perform CPR and basic life support if certified.
  • Record patient information and observations, report changes in patient condition to nurses or doctors and provide emotional support to patients and families.
  • Clean and sanitize patient areas and equipment, follow hospital protocols to prevent infection spread.

Skills

Medical terminology

Education

Nursing Assistant CNA certification
BLS certification

Job description

Prime Healthcare is hiring an Emergency Room CNA at Saint John Hospital in Leavenworth, KS. The Evening shift runs from 10:45am to 11:15pm, and the position is full-time.

The ER CNA supports nurses and doctors, monitors patient vital signs, assists with procedures, and ensures supplies are stocked in a fast-paced ED. Responsibilities include helping patients with basic needs, transporting patients, recording observations, and maintaining infection control.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

ER CNA - Evening Shift with Sign-On Bonus
ER CNA - Evening Shift with Sign-On Bonus

Prime Healthcare • South Basehor (KS)

On-site
USD 21,000 - 26,000
Health, dental, and vision insurance
Paid vacation, sick time and holidays
Bereavement leave, FMLA
+4
ER Night Shift Registered Nurse — Sign-On Bonus
ER Night Shift Registered Nurse — Sign-On Bonus

Prime Healthcare • Leavenworth (KS)

On-site
USD 70,000 - 100,000
Emergency Room CNA
Emergency Room CNA

Prime Healthcare • South Basehor (KS)

On-site
USD 21,000 - 26,000
Health, dental, and vision insurance
Paid vacation, sick time and holidays
Bereavement leave, FMLA
+4
Emergency Room CNA
Emergency Room CNA

Prime Healthcare • Leavenworth (KS)

On-site
USD 32,000 - 42,000
Health, dental, and vision insurance
Paid vacation, sick time and holidays
Bereavement leave, FMLA and otherleave
+4
ER Night Shift RN — $20k Sign-On Bonus
ER Night Shift RN — $20k Sign-On Bonus

Saint John Hospital, Inc. • Leavenworth (KS)

On-site
USD 70,000 - 90,000
Sign-On Bonus
Night shifts
ER Clinical Supervisor RN – Day Shift | Sign-On Bonus
ER Clinical Supervisor RN – Day Shift | Sign-On Bonus

Prime Healthcare • South Basehor (KS)

On-site
USD 90,000 - 120,000
Health insurance
Dental insurance
Vision insurance
+6
ER Nursing Supervisor (RN) - Day Shift | Sign-On Bonus
ER Nursing Supervisor (RN) - Day Shift | Sign-On Bonus

Prime Healthcare • Leavenworth (KS)

On-site
USD 85,000 - 110,000
Health, dental, and vision insurance
Paid vacation, sick time and holidays
Bereavement leave, FMLA and otherLeave
+4
Night ER Nurse (Per Diem) — Fast-Paced Critical Care
Night ER Nurse (Per Diem) — Fast-Paced Critical Care

Prime Healthcare • South Basehor (KS)

On-site
USD 41,328 - 68,880
Competitive compensation
Medical insurance benefit plan
401K
Behavioral Health CNA — Sign-On Bonus, Day Shift (12h)
Behavioral Health CNA — Sign-On Bonus, Day Shift (12h)

Prime Healthcare • Leavenworth (KS)

On-site
USD 32,000 - 38,000
Full benefits
Emergency Room Nurse – Night Shift with Sign-On Bonus
Emergency Room Nurse – Night Shift with Sign-On Bonus

Prime Healthcare • Missouri

On-site
USD 80,000 - 110,000
Sign-On Bonus