Earned Value Management (EVM) Analyst - Level 4

0090 CORP-Corporate Office

United States

On-site

USD 117,500 - 176,300

Full time

14 days+
Application generator

Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Northrop Grumman Space Sector is seeking an Earned Value Management (EVM) Analyst – Level 4 to join our western region EVM Center of Excellence team. This role is located in our Redondo Beach, CA facility.

The position emphasizes mentoring, training, and providing EVM expertise across programs. A Bachelor’s with 8+ years or a Master’s with 6+ years, plus EVMS experience, are required; travel up to 10% and Top Secret clearance may be needed.

Qualifications

  • Bachelor’s degree with 8+ years of related experience (or Master’s with 6+ years).
  • Alternatively, 4+ years of experience in lieu of a degree.
  • Strong EVMS experience with cost and schedule management and EIA-748 knowledge.
  • Experience deploying processes in an EIA-748 compliant EVMS.
  • Experience with DCMA data-driven surveillance metrics and related tools.
  • Proficient in SAP, SAP BW, Deltek Cobra, and MS Project.
  • Strong analytical skills; proficient in MS Office (Excel).
  • Willingness to travel up to 10%; ability to obtain Top-Secret clearance.

Responsibilities

  • Mentor PMO, CAMs, cost analysts and schedule analysts on EVM implementation.
  • Develop training material and sessions on EVM topics for diverse audiences.
  • Guide program startup and IBR preparation with PM and business teams.
  • Support internal EVM surveillance reviews to ensure EIA-748 compliance.
  • Assist in EVMS reviews with DCMA, audits, and process feedback.
  • Communicate professionally with program teams and stakeholders.

Skills

EVMS experience
Cost & Schedule management
Analytical skills
MS Excel
Travel willingness

Education

Bachelor's degree in related field
Master's degree in related field
4+ years of experience in lieu of degree

Tools

SAP
SAP BW
Deltek Cobra
MS Project
Deltek CostPoint

Job description

Relocation Assistance: No relocation assistance available.
Clearance Required for Start: No.
Clearance Type: Top Secret.
Travel: Yes, 10% of the time.

Northrop Grumman Space Sector is currently seeking an Earned Value Management (EVM) Analyst – Level 4 to join our western region EVM Center of Excellence team. This role is located in our Redondo Beach, CA facility.

Responsibilities
  • Serve as a SME by mentoring, coaching and guiding the Program Management Office (PMO), Control Account Managers (CAMs), cost analysts, and schedule analysts on the proper EVM implementation and execution.
  • Develop material and facilitate training sessions as needed to support programs and audiences of all sizes on various EVM topics.
  • Provide Program Startup and business process implementation guidance, expertise and leadership (in collaboration with Business and Program Management) through active participation in program baseline development and Integrated Baseline Review (IBR) preparation and execution.
  • Conduct and support internal EVM Surveillance Reviews (ISR) to ensure compliance with the EIA-748 EVMS guidelines.
  • Support program teams in preparing, executing and closing internal and external EVMS reviews (e.g., Defense Contract Management Agency (DCMA), Internal Audit). Provide program, division, sector, and corporate process and procedure feedback.
  • Communicate professionally and effectively with program team, stakeholders, and various customers.
  • Apply knowledge of the DCMA data-driven Earned Value Management Systems compliance process and current policy.
  • Support programs in compliance with EVM and Program Control Corporate and Sector PrOP.
  • Other duties as assigned.
Basic Qualifications
  • Bachelor’s degree with 8+ years of relevant professional experience in Accounting, Finance, Business Administration, Program Cost Analysis or Program Scheduling – OR – Master’s degree with 6+ years of relevant professional experience in the same fields.
  • Will consider an additional 4+ years of experience in lieu of a degree.
  • Strong EVMS experience with Cost and Schedule Management skills; working knowledge of EVM and industry standards (EIA‑748 guidelines).
  • Experience with deployment of processes in an EIA‑748 compliant Earned Value Management environment.
  • Experience with DCMA data‑driven surveillance metrics and associated tools and processes.
  • Experience with SAP, SAP Business Warehouse, Deltek Cobra, and MS Project.
  • Strong analytical skillset and ability to communicate significance of results.
  • Strong PC skills and proficient knowledge of Microsoft Office Suite, including MS Excel.
  • Ability to travel up to 10%.
  • Must have the ability to obtain and maintain a U.S. Government Top‑Secret security clearance.
Preferred Qualifications
  • Active U.S. Government Top Secret security clearance (with a full investigation within the past 6 years).
  • Experience with Deltek CostPoint.
  • Experience in a program oversight or auditing role.
  • Aerospace/Defense industry experience.

Primary Level Salary Range: $117,500.00 – $176,300.00. The above salary range represents a general guideline; however, Northrop Grumman considers a number of factors when determining base salary offers such as scope and responsibilities of the position and candidate’s experience, education, skills and current market conditions. Employees may be eligible for overtime, shift differential, discretionary bonus and, for certain positions, Long Term Incentives. Benefits include health insurance, life and disability insurance, savings plan, company‑paid holidays and paid time off (PTO) for vacation and/or personal business.

U.S. Citizenship is required for all positions with a government clearance and certain other restricted positions.

Northrop Grumman is an Equal Opportunity Employer, making decisions without regard to race, color, religion, creed, sex, sexual orientation, gender identity, marital status, national origin, age, veteran status, disability, or any other protected class. For our complete EEO and pay transparency statement, please visit http://www.northropgrumman.com/EEO.

Click the link below to learn more about the space sector: https://www.northropgrumman.com/space

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Earned Value Management (EVM) Analyst - Level 3 or 4
Earned Value Management (EVM) Analyst - Level 3 or 4

Northrop Grumman Corp. • Chandler (AZ)

On-site
USD 86,000 - 128,000
Earned Value Management (EVM) Analyst - Level 3 or 4
Earned Value Management (EVM) Analyst - Level 3 or 4

Northrop Grumman • Chandler (AZ)

On-site
USD 86,000 - 128,000
Sentinel - Sr Principal Program Cost and Schedule Control Analyst (17419)
Sentinel - Sr Principal Program Cost and Schedule Control Analyst (17419)

Northrop Grumman • Roy (UT)

On-site
USD 101,400 - 152,200
Medical, Dental & Vision coverage
401(k) plan
Educational assistance
+5
Sr EVM Program Control Analyst (level 4)
Sr EVM Program Control Analyst (level 4)

Northrop Grumman Corp. (AU) • Melbourne (FL)

On-site
USD 101,400 - 152,200
Health insurance
Life and disability insurance
Savings plan
+1
Principal Program Cost and Schedule Control Analyst
Principal Program Cost and Schedule Control Analyst

Northrop Grumman • Palmdale (CA)

On-site
USD 81,000 - 122,000
Health insurance
Life and disability insurance
Savings plan
+1
Program Cost and Schedule Control Analyst
Program Cost and Schedule Control Analyst

Northrop Grumman • Redondo Beach (CA)

On-site
USD 76,000 - 114,000
Health insurance
Life and disability insurance
401K savings plan
+1
Sr EVM Program Control Analyst (level 4)
Sr EVM Program Control Analyst (level 4)

Northrop Grumman • Melbourne (FL)

On-site
USD 101,400 - 152,200
Health insurance
Life and disability insurance
Paid time off
+1
Program Cost and Schedule Control Analyst
Program Cost and Schedule Control Analyst

Talentify • Layton (UT)

On-site
USD 66,000 - 114,000
Flexible work arrangements
Excellent benefits
9/80 schedule
+1
Program Cost and Schedule Control Analyst
Program Cost and Schedule Control Analyst

Talentify • El Segundo (CA)

On-site
USD 76,000 - 114,000
9/80 schedule
401K matching
Health insurance
Material Cost Management Analyst - Level 3
Material Cost Management Analyst - Level 3

Northrop Grumman • Redondo Beach (CA)

On-site
USD 94,000 - 141,000
Health insurance
Life and disability insurance
Savings plan
+1