Earned Value Lead: Integrated Program Analyst (Onsite FW)

Textron

Fort Worth (TX)

Presencial

USD 90.000 - 130.000

Jornada completa

14 días+

Consigue una respuesta de este empleador

Tu currículum y tu carta de presentación, adaptados exactamente a lo que buscan contratar.

Supera los filtros ATS

Ventajas ofrecidas por este puesto de trabajo

9/80 work schedule
PTO
Vacation time
Paid holidays
Parental leave
Tuition reimbursement
Comprehensive health insurance
On-site clinic

Descripción de la vacante

Bell Textron is seeking an Integrated Program Analyst in Fort Worth, TX. The role leads integrated cost, schedule, and Earned Value performance across complex aircraft programs, driving IMS development, variance analysis, and forecasting to keep programs on time and on budget.

You will partner with managers, engineers, and manufacturing to deliver data-driven insights and executive-level dashboards, ensuring alignment of scope, schedule, and resources.

Formación

  • Bachelor’s degree in Industrial Engineering, Systems Engineering, or related field required.
  • At least 2 years in project controls, CPM scheduling, and cost/schedule analysis in engineering/aerospace/defense or related manufacturing settings.
  • Ability to present analytical findings regularly to leadership and stakeholders.
  • Ability to interpret WBS, SOW, and technical plans to create IMS and cost/schedule models.
  • Strong analytical skills in variance, trend analysis, SRA, and EAC development.
  • Proficiency with enterprise scheduling tools (Primavera P6, MS Project) and office tools.

Responsabilidades

  • Provide accountability for program baselines, performance metrics, and planning integration.
  • Lead development and optimization of integrated master schedules (IMS) and forecast costs/schedules.
  • Ensure alignment of scope, schedule, budget, and risk; shape recovery strategies.
  • Guide CAMs on planning inputs, analyze risk impacts, and present dashboards to leadership.

Conocimientos

Project controls
CPM scheduling
Data analysis
Executive reporting
WBS/SOW interpretation
Variance analysis
Trend analysis
SRA
Forecasting (EAC)
Presentation to leadership

Educación

Bachelor’s degree in Industrial Engineering

Herramientas

Primavera P6
MS Project
Excel
PowerPoint

Descripción del empleo

Bell Textron is seeking an Integrated Program Analyst in Fort Worth, TX. The role leads integrated cost, schedule, and Earned Value performance across complex aircraft programs, driving IMS development, variance analysis, and forecasting to keep programs on time and on budget.

You will partner with managers, engineers, and manufacturing to deliver data-driven insights and executive-level dashboards, ensuring alignment of scope, schedule, and resources.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Strategic Program Analyst: Cost, Schedule & EVM
Strategic Program Analyst: Cost, Schedule & EVM

Bell Flight • Fort Worth (TX)

Presencial
USD 90.000 - 120.000
Competitive salary
On-site health facilities
Tuition reimbursement
+1
Integrated Program Analyst - Fort Worth, TX
Integrated Program Analyst - Fort Worth, TX

Bell Flight • Fort Worth (TX)

Presencial
USD 90.000 - 120.000
Competitive salary
On-site health facilities
Tuition reimbursement
+1
Finance Program Control Analyst — Earned Value
Finance Program Control Analyst — Earned Value

RTX • Richardson (TX)

Presencial
USD 76.000 - 144.000
Earned Value Cost Integrator — Program Finance
Earned Value Cost Integrator — Program Finance

Lockheed Martin Corporation • Palmdale (CA)

Presencial
USD 89.000 - 166.000
Flexible work arrangements
4x10 schedule
Senior Program Finance Analyst – Earned Value
Senior Program Finance Analyst – Earned Value

Textron • Wilmington (MA)

Presencial
USD 93.000 - 140.000
Flexible Work Schedules
Education Assistance
Wellness Program
+1
Program Finance & Control Analyst - Onsite (Earned Value)
Program Finance & Control Analyst - Onsite (Earned Value)

Collins Aerospace • Cedar Rapids (IA)

Presencial
USD 108.000 - 205.000
Medical, dental, and vision insurance
Vacation and paid time off
401(k) retirement plan with matching
Senior Earned Value & Program Controls Analyst
Senior Earned Value & Program Controls Analyst

Textron • Wilmington (MA)

Presencial
USD 92.600 - 139.600
Flexible Work Schedules
Education Assistance
Career Development & Training
+3
Senior Program Finance Analyst — Earned Value & Contracts
Senior Program Finance Analyst — Earned Value & Contracts

Kautex Textron • Wilmington (MA)

Presencial
USD 90.000 - 150.000
Flexible schedules
Education assistance
Career development
+3
Senior Electrical Instrumentation Engineer - Fort Worth
Senior Electrical Instrumentation Engineer - Fort Worth

Textron Inc. • Fort Worth (TX)

Presencial
USD 90.000 - 140.000
9/80 work schedule
PTO on-site clinic
Tuition reimbursement
+3
Senior Program Finance Analyst – Earned Value & Budgets
Senior Program Finance Analyst – Earned Value & Budgets

Textron Inc. • Wilmington (MA)

Híbrido
USD 93.000 - 116.000
Flexible Work Schedules
Education Assistance
Career Development & Training
+3