Dough Mixer - 2nd Shift, Full-Time, Impactful Role

Magnolia Foods, Llc.

Rialto (CA)

On-site

USD 26,000 - 29,000

Full time

3 days ago
Be an early applicant
Application generator

Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Magnolia Foods, Llc. in Rialto, CA is seeking a Mixer, Flour Department for 2nd shift from 12PM to 8:30PM. The role requires operating and cleaning bakery machinery, following GMPs and safety procedures.

Prior experience with dough mixing, batch tracking, and lockout/tagout procedures is preferred. You will prepare materials, verify formulations, maintain logs, and support the operator during breaks, ensuring batches meet specifications and quality standards.

Qualifications

  • Ability to operate and clean mixing machinery in a production environment.
  • Familiarity with GMPs, food safety, and safety procedures.
  • Ability to follow formulas and verify weights and lot numbers.

Responsibilities

  • Comply with all Plant, State and Federal OSHA, EPA, FDA, HACCP, and SQF regulations.
  • Prepare material for batched.
  • Ensure formulations are followed for each batch.
  • Verifies Temperature of Dough
  • Mix the ingredients to make Dough
  • Identifies the ingredients with weights and lot number
  • Line Cleaning (All equipment)
  • Assist the operator during breaks or lunch
  • Fill Out the Daily Prod. Report
  • Order Material for Warehouse.
  • Avoid using raw material that may be damaged, or defective be it, color, appearance, expiration date, etc.
  • Verify that the product in process is within product specification, color, appearance, diameter, and weight.
  • Start up machinery as well as shutting it down
  • Verify machinery temperature (within product specification)
  • Document all the pertinent information on the mixing logs
  • Inform the Lead and Supervisor of any discrepancies in product or problems with machinery
  • Follow all safety procedures in a proper manner.
  • Dress appropriately and wear all required personal protective equipment assigned (PPE).
  • Use lockout/tag out devices and procedures as required.
  • Other duties may be assigned based on department and business needs.

Job description

Magnolia Foods, Llc. in Rialto, CA is seeking a Mixer, Flour Department for 2nd shift from 12PM to 8:30PM. The role requires operating and cleaning bakery machinery, following GMPs and safety procedures.

Prior experience with dough mixing, batch tracking, and lockout/tagout procedures is preferred. You will prepare materials, verify formulations, maintain logs, and support the operator during breaks, ensuring batches meet specifications and quality standards.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Dough Mixer | GMP & Food Safety Operator
Dough Mixer | GMP & Food Safety Operator

Magnolia Foods, Llc. • Rialto (CA)

On-site
USD 26,000 - 29,000
Dough Mixer Technician - GMP Food Production
Dough Mixer Technician - GMP Food Production

Magnolia Foods, Llc. • Rialto (CA)

On-site
USD 26,000 - 29,000
Mixer, Flour Department 2nd Shift 12PM-8:30PM
Mixer, Flour Department 2nd Shift 12PM-8:30PM

Magnolia Foods, Llc. • Rialto (CA)

On-site
USD 26,000 - 29,000
Dough Mixer Operator I - 2nd Shift
Dough Mixer Operator I - 2nd Shift

Flowers Baking Co. of Jacksonville LLC • Jacksonville (FL)

On-site
USD 30,000 - 37,000
Comprehensive health benefits
401(k) Retirement plan
Professional growth and training
+1
Mixer, Flour Department 3rd Shift 8pm-430am
Mixer, Flour Department 3rd Shift 8pm-430am

Magnolia Foods, Llc. • Rialto (CA)

On-site
USD 26,000 - 29,000
Mixer, Flour Department 1st Shift 4AM-1230PM
Mixer, Flour Department 1st Shift 4AM-1230PM

Magnolia Foods, Llc. • Rialto (CA)

On-site
USD 26,000 - 29,000
Dough Mixer Operator - 2nd Shift, Flexible Hours
Dough Mixer Operator - 2nd Shift, Flexible Hours

Pures Food Specialties LLC • Bedford Park (IL)

On-site
USD 25,000 - 26,000
Evening Mixer Operator I – Dough Production
Evening Mixer Operator I – Dough Production

Flowers Foods & Subsidiaries • Tucker (GA)

On-site
USD 37,000 - 40,000
Health benefits
401(k) plan
Growth & training
+1
3rd Shift Mixer Operator - SIGN ON BONUS AVAILABLE $2,500!
3rd Shift Mixer Operator - SIGN ON BONUS AVAILABLE $2,500!

Urban Farmer • Manteno (IL)

On-site
USD 30,000 - 45,000
2nd Shift Master Mixer - SIGN ON BONUS AVAILABLE $2,500
2nd Shift Master Mixer - SIGN ON BONUS AVAILABLE $2,500

UrbanFarmer LLC. • Manteno (IL)

On-site
USD 29,893 - 34,357
Sign-on bonus of $2,500