Data Center Construction Security Manager

Fleet Data Centers

Sparks (NV)

On-site

USD 150,000 - 175,000

Full time

14 days+
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

100% employer-covered medical, dental,
Vision insurance
401K program
Unlimited PTO
Paid holidays

Job summary

Fleet Data Centers in Reno, NV seeks a Construction Security Manager to lead security operations on an active data center project. Youll oversee guard forces, access control, and incident response, coordinating with EHS and project leadership to safeguard critical infrastructure.

The role requires 7+ years in security, strong vendor management, and experience in high-availability sites. Compensation includes a base salary with discretionary bonus and comprehensive benefits.

Qualifications

  • Minimum 7+ years of progressive experience in physical security or related fields.
  • Minimum 3+ years of experience managing site security operations and vendors.
  • Experience in mission-critical construction or data center environments.
  • Strong ability to develop security procedures, post orders and access controls.
  • Experience responding to incidents and documenting investigations.

Responsibilities

  • Lead day-to-day construction security operations per Fleet standards and contract terms.
  • Manage security vendors, staffing, training, reporting and compliance.
  • Develop and improve security policies, SOPs and post orders.
  • Coordinate with Construction, EHS, Operations and other stakeholders on security needs.
  • Provide oversight for high-risk activities including gate operations and material deliveries.
  • Ensure compliance with access control, badging and visitor management.
  • Respond to incidents, document investigations, and drive corrective actions.

Skills

Security operations
Vendor management
Access control
Incident response
Policy development

Tools

Access control systems

Job description

Overview

Fleet Data Centers designs, builds and operates mega-scale data center campuses. Fleet provides its customers with flexibility and predictability to meet their upside demand forecasts, addressing a key need in the market as traditional leased models are struggling to keep pace with the demand for new Cloud and AI infrastructure. Fleet is led by a team of industry veterans that have already made a lasting imprint on the evolution of global digital infrastructure and are committed and uniquely capable of upleveling data center development scale and operations in the face of rising demand. Fleet is well positioned to bring in-house design, engineering and operational capabilities to collaborate with customers on tailored solutions for campuses of 500MW+. This unique model enables Fleet to provide the world’s largest and most sophisticated customers with a seamless extension of their own data center fleets with constant access to design innovation. Fleet is headquartered in Denver, Colorado, with satellite offices in Seattle, WA and Arlington, VA.

Position Overview

The Construction Security Manager is responsible for the day-to-day security oversight of Fleet’s active data center construction environment in Reno, Nevada. This leader ensures construction security programs are executed consistently, vendors perform to Fleet standards and contractual requirements, and security processes support safe, compliant, and uninterrupted construction operations.

This role will oversee on-site construction security operations, including guarding services, security procedures, and response to security events across active jobsite and adjacent live environments. The Construction Security Manager will partner closely with Construction, Construction EHS, Fleet EHS, Operations, and other cross-functional stakeholders to identify security needs, protect critical infrastructure, audit security performance to contractual standards, and transition live spaces to Fleet Security Standards. The successful candidate will be a visible leader who drives accountability, strengthens security culture, and ensures security standards are followed across the project.

Job Responsibilities

The Construction Security Manager will have responsibility for the following:

  • Lead day-to-day construction security operations for the project, ensuring site security programs are executed in accordance with Fleet standards, contract requirements, and operational needs.
  • Manage all security vendors, including on-site guarding services, and hold third-party partners accountable for performance, professionalism, reporting, staffing, training, and compliance with Fleet expectations and contractual obligations.
  • Develop, implement, maintain, and improve security policies, post orders, Standard Operating Procedures (SOPs), and other security processes required to support active construction operations.
  • Partner closely with Construction, Construction EHS, Fleet EHS, Operations, Commissioning, and other internal stakeholders to support evolving security needs across the project and adjacent live spaces.
  • Provide security oversight for higher-risk construction activities, including gate operations, material deliveries, equipment staging, laydown yards, temporary perimeter controls, hot work support, infrastructure protection, and other activities that present elevated security risk.
  • Ensure construction personnel, contractors, vendors, and visitors are following required security measures, access rules, badging requirements, and site expectations, and drive corrective action when standards are not met.
  • Respond to security incidents, alarms, protests, thefts, trespass events, and other jobsite events as needed, ensuring timely escalation, documentation, investigation support, and follow-through on corrective actions.
  • Escalate security system and device issues to the Security Technical Program Manager, construction leadership, and third-party integrator to ensure prompt troubleshooting, repair, and restoration of security capabilities.
  • Conduct routine inspections, audits, and quality checks of physical security controls, procedures, guard force performance, and contractual security requirements to identify gaps and drive continuous improvement.
  • Support access control and badging processes, visitor management, vehicle and equipment screening, key control, patrol expectations, incident reporting, emergency response coordination, and turnover readiness for spaces transitioning to Fleet Security Standards.
  • Maintain accurate records, logs, incident reports, audit results, and operational metrics, and provide regular updates to leadership regarding security posture, incidents, risks, compliance, and ongoing improvements.
  • Promote a strong construction security culture through visible leadership, clear communication, training reinforcement, and disciplined execution of security standards.
  • Build trusted working relationships with project leadership, local law enforcement, site leadership, and partner teams to ensure security is integrated into daily construction activity and long-term operational planning.
  • Support investigations into security concerns, policy violations, theft, vandalism, workplace violence concerns, or operational issues, and ensure appropriate documentation and escalation to leadership.
  • Identify security risks, process breakdowns, contractual gaps, or infrastructure vulnerabilities and make practical recommendations to improve protection, audit readiness, transition planning, and operational resilience.
  • Maintains a safe, secure, and well-controlled construction environment with strong access control, guard force execution, incident response, and protection of personnel, materials, and infrastructure.
  • Ensures construction security operations run reliably every day, including post orders, staffing coverage, gate operations, badging, patrols, delivery control, and alarm response.
  • Builds strong partnerships with construction leadership, Construction EHS, Fleet EHS, Operations, vendors, and law enforcement so security supports project activity without slowing critical work.
  • Identifies risks early and drives consistent follow-through on corrective actions, audits, investigations, standards enforcement, and compliance with contractual security measures.
  • Creates a culture of accountability, professionalism, and readiness where teams are trained, procedures are followed, and spaces are transitioned to Fleet Security Standards in a controlled and well-documented manner.
  • Continually raises the bar in construction security standards to deliver best-in-class security services through every phase of the project life cycle.
Education and Experience

This role is designed for a fast-moving data center construction environment where security operations must support active building activity, changing site conditions, contractor access, temporary controls, vendor presence, and phased turnover into live operations. The Construction Security Manager must be effective in balancing physical security, life safety, incident response, and construction support responsibilities while coordinating across internal teams, security vendors, EHS partners, and project leadership.

The role requires strong judgment in environments with evolving site conditions, changing operational demands, multiple stakeholder priorities, and overlapping construction and live-site risks. Success will depend on the ability to maintain a safe, secure, and well-run project, identify and elevate risks early, enforce standards consistently, audit performance against contractual requirements, and make practical decisions that support both construction progress and business continuity.

  • Minimum 7+ years of progressive experience in physical security, security operations, critical infrastructure protection, construction security, law enforcement, military, or related fields.
  • Minimum 3+ years of experience managing site-level security operations, construction security programs, vendor relationships, or guard force operations.
  • Experience working in mission-critical construction, industrial, logistics, manufacturing, utility, or data center environments.
  • Demonstrated experience developing and implementing security procedures, post orders, access controls, and operational response processes for active worksites.
  • Experience responding to incidents, conducting investigations, and preparing clear written incident documentation.
  • Strong working knowledge of physical security operations, access control, visitor management, incident response, infrastructure protection, and construction site security practices.
  • Proven ability to manage third-party security vendors and drive accountability against service expectations.
  • Strong communication skills and ability to work effectively across cross-functional teams in a fast-paced operational environment.
Preferred Qualifications
  • Experience supporting security operations at a data center construction site, critical infrastructure project, or other high-availability development environment.
  • Familiarity with security systems such as access control, video surveillance, intrusion detection, and alarm monitoring platforms.
  • Experience overseeing security support for material movements, chain-of-custody processes, secure deliveries, equipment protection, and temporary perimeter controls.
  • Experience partnering with construction teams, EHS teams, or operations teams to support day-to-day project needs and evolving business requirements.
  • Knowledge of incident command, emergency response coordination, physical security risk assessment practices, and audit or compliance oversight in construction environments.
  • Relevant industry certifications such as ASIS CPP, PSP, PCI, or equivalent are a plus.
Location

Reno, Nevada

Travel Requirement

Limited travel between project sites and office locations

Annual Compensation Range

** ** $150,000-$175,000 Base Salary + Discretionary Bonus

Fleet Data Centers Employment

Fleet Data Centers employees enjoy competitive compensation and comprehensive benefits, including 100% employer-covered medical, dental, and vision insurance, a 401K program, standard paid holidays, and unlimited PTO.

NOTE: This job description is not intended to be all-inclusive. Employees may perform other related duties to meet the organization’s ongoing needs.

Fleet Data Centers is proud to be an Equal Opportunity Employer. Qualified applicants are considered for employment regardless of age, race, color, religion, sex, national origin, sexual orientation, gender identity, disability, or veteran status. If you need assistance applying for any of our open positions, please contact us at info@fleetdatacenters.com_._

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Security Technical Program Manager
Security Technical Program Manager

Fleet Data Centers • Sparks (NV)

On-site
USD 140,000 - 165,000
Health benefits
401K
Unlimited PTO
Fleet Security Coordinator
Fleet Security Coordinator

Tract Capital Management, LP • Alexandria (VA)

On-site
USD 85,000 - 125,000
100% employer-covered medical, dental, and vision insurance
401K program
Unlimited PTO
Director of Construction
Director of Construction

Fleet Data Centers • Sparks (NV)

On-site
USD 180,000 - 280,000
Medical insurance
Dental insurance
Vision insurance
+2
Manager, Data Center Critical Facilities Operations - PR
Manager, Data Center Critical Facilities Operations - PR

Fleet Data Centers • Sparks (NV)

On-site
USD 120,000 - 150,000
Employer-covered medical, dental and V
401K program
Unlimited PTO
+1
Manager, Data Center Critical Facilities Operations - SV
Manager, Data Center Critical Facilities Operations - SV

Fleet Data Centers • Sparks (NV)

On-site
USD 120,000 - 150,000
IT Security Documentation Coordinator
IT Security Documentation Coordinator

Fleet Data Centers • Alexandria (VA)

On-site
USD 85,000 - 125,000
Project Engineer
Project Engineer

Fleet Data Centers • Sparks (NV)

On-site
USD 85,000 - 105,000
Comprehensive benefits
Sr. Project Engineer
Sr. Project Engineer

Fleet Data Centers • Sparks (NV)

On-site
USD 112,000 - 140,000
Director, Critical Facilities Systems
Director, Critical Facilities Systems

Tract Capital Management, LP • Mercer Island (WA)

Hybrid
USD 180,000 - 225,000
100% employer-covered medical, dental, and vision insurance
401K program
Unlimited PTO
+1
Sr. Project Engineer - PR
Sr. Project Engineer - PR

Fleet Data Centers • Sparks (NV)

On-site
USD 112,000 - 140,000
Medical insurance
Dental insurance
Vision insurance
+3