Enable job alerts via email!

Data Center Construction Quality Assurance Manager

ZipRecruiter

Dallas (TX)

On-site

USD 90,000 - 130,000

Full time

3 days ago
Be an early applicant

Boost your interview chances

Create a job specific, tailored resume for higher success rate.

Job summary

A leading company is seeking a Data Center Construction Quality Assurance Manager to act as the Owner's Representative for critical projects in Dallas. The role involves ensuring compliance with contract requirements and industry standards through rigorous quality management processes. Ideal candidates will have extensive experience in QA/QC within data center environments and a strong commitment to safety and quality.

Qualifications

  • Minimum 10 years of relevant experience in quality assurance/control in data centers or similar projects.
  • OSHA 30; First Aid/CPR certification required within 90 days of hire.
  • CDCP and LEED AP certifications preferred.

Responsibilities

  • Develop and maintain project-specific Quality Assurance and Quality Control (QA/QC) Plan.
  • Perform regular inspections on all installed products to verify compliance with contract documents.
  • Provide daily and weekly quality reports to the Owner.

Skills

Communication
Problem-Solving
Teamwork
Attention to Detail
Commitment to Safety

Education

Bachelor’s degree in Electrical Engineering, Mechanical Engineering, or Construction Management

Tools

Procore
BlueBeam Revu
Autodesk Cloud
Microsoft Office Suite

Job description

Job Description

Data Center Construction Quality Assurance Manager (QA) will act as Owner’s Representative for mission-critical data center projects. QA will work alongside owner, project managers, project engineers, general contractors, trade partners, equipment vendors, design and engineering consultants, and commissioning agents to ensure that all installed products meet or exceed the intent of the contract documents and industry standards for mission-critical construction.

Responsibilities include:

  1. Develop and maintain project-specific Quality Assurance and Quality Control (QA/QC) Plan, including preparatory meetings, first-of-a-kind inspections, corrective actions, and final inspections.
  2. Thoroughly understand all project documentation such as drawings, specifications, RFIs, submittals, shop drawings, equipment data sheets, and MSDS.
  3. Perform regular inspections on all installed products to verify compliance with contract documents.
  4. Report quality deficiencies to the General Contractor and trade partners using the project’s software platform.
  5. Address all quality issues through corrective actions and root cause analyses when necessary.
  6. Audit system installations to ensure conformity to BIM models.
  7. Collaborate on site logistics and material staging to improve efficiency.
  8. Lead weekly quality control meetings.
  9. Provide daily and weekly quality reports to the Owner.
  10. Verify materials and equipment deliveries conform to approved submittals and are stored safely.
  11. Maintain logs of inspections by authorities; rectify all failed inspections.
  12. Participate in fostering a strong safety culture.
  13. Act as liaison during commissioning phases.
  14. Track design changes and update as-built documentation and BIM files accordingly.
  15. Support project billing processes by verifying work progress.
  16. Promote open communication, transparency, and mutual respect among stakeholders.

Requirements:

  1. Bachelor’s degree in Electrical Engineering, Mechanical Engineering, or Construction Management.
  2. Minimum 10 years of relevant experience in quality assurance/control in data centers or similar projects.
  3. OSHA 30; First Aid/CPR certification required within 90 days of hire.
  4. CDCP and LEED AP certifications preferred.
  5. Knowledge of local and building codes (NFPA, NEC, IBC, etc.).
  6. Proficiency in construction management software (Procore, BlueBeam Revu, Autodesk Cloud).
  7. Strong skills in Microsoft Office Suite.
  8. Unwavering commitment to safety.
  9. High initiative, attention to detail, and ability to work in a team.
  10. Excellent communication, problem-solving, and decision-making skills.
  11. Willingness to travel.
Get your free, confidential resume review.
or drag and drop a PDF, DOC, DOCX, ODT, or PAGES file up to 5MB.

Similar jobs

Data Center Construction Quality Assurance Manager

Worldwidemissioncritical

Dallas

On-site

USD 80,000 - 110,000

30+ days ago

Data Center Construction Quality Assurance Manager

Worldwide Mission Critical

Dallas

On-site

USD 80,000 - 100,000

30+ days ago

Quality Assurance Manager

ZipRecruiter

Atlanta

Remote

USD 70,000 - 100,000

3 days ago
Be an early applicant

Quality Assurance Manager

ZipRecruiter

Arlington

Remote

USD 125,000 - 140,000

3 days ago
Be an early applicant

Quality Assurance Manager

National Power

Nashville

Remote

USD 109,000 - 185,000

Yesterday
Be an early applicant

Quality Assurance Manager *

ZipRecruiter

Manassas

Remote

USD 80,000 - 110,000

3 days ago
Be an early applicant

Quality Assurance Manager

ZipRecruiter

Silver Spring

Remote

USD 90,000 - 120,000

3 days ago
Be an early applicant

Quality Assurance Manager

ZipRecruiter

Orlando

Remote

USD 70,000 - 100,000

3 days ago
Be an early applicant

Quality Assurance Manager

Digital Management Llc

Remote

USD 80,000 - 120,000

3 days ago
Be an early applicant