Enable job alerts via email!

Data Center Construction Quality Assurance Manager

Worldwidemissioncritical

Dallas (TX)

On-site

USD 80,000 - 110,000

Full time

30+ days ago

Boost your interview chances

Create a job specific, tailored resume for higher success rate.

Job summary

An established industry player is seeking a Data Center Construction Quality Assurance Manager to ensure the highest standards in mission-critical data center projects. This role involves acting as the Owner's Representative, collaborating with various stakeholders to uphold quality assurance protocols. You will develop and implement QA/QC plans, conduct thorough inspections, and facilitate communication among project partners. Join a dynamic team dedicated to excellence in construction, where your expertise will significantly impact the success of innovative projects. If you are passionate about quality and safety in construction, this opportunity is ideal for you.

Qualifications

  • 10+ years of experience in QA/QC roles for data centers.
  • Bachelor's degree in relevant engineering or construction management.

Responsibilities

  • Develop and maintain project-specific QA/QC plans.
  • Conduct inspections and report deficiencies to contractors.
  • Lead quality control meetings and provide daily summaries.

Skills

Quality Assurance
Quality Control
Construction Management
Problem Solving
Communication Skills
Attention to Detail

Education

Bachelor's degree in Electrical Engineering
Bachelor's degree in Mechanical Engineering
Bachelor's degree in Construction Management

Tools

Procore
BlueBeam Revu
Autodesk Cloud
Microsoft Office Suite

Job description

Description

Data Center Construction Quality Assurance Manager (QA) will act as Owner’s Representative for mission critical data center projects. QA will work alongside owner, project managers, project engineers, general contractors, trade partners, equipment vendors, design and engineering consultants, and commissioning agents to assure that all installed product meets or exceeds the intent of the contract documents, as well as industry accepted standards for mission critical construction.

Responsibilities
  • Develop and maintain project-specific Quality Assurance Quality Control (QA/QC) Plan inclusive of Preparatory Meetings, First of Kind Inspections, Corrective Actions, and Final Inspections.
  • Thoroughly understand all project documentation including drawings, specifications, RFIs, submittals, shop drawings, equipment data sheets, and material safety data sheets (MSDS).
  • Perform cadenced inspections on all installed product to ensure that it meets or exceeds the intent of the contract documents.
  • Report quality deficiencies to the General Contractor and trade partners via the project’s adopted software platform.
  • Drive all documented quality issues through corrective actions and closure authoring Root Cause Analyses (RCA) when required.
  • Continually audit systems installation to ensure that the key geometries, dimensions, and pathways conform to the Building Information Model (BIM).
  • Partner with General Contractor and trade partners on site logistics planning and material staging to drive greater efficiency on the site.
  • Lead weekly quality control meetings with General Contractor and trade partners.
  • Provide daily quality summaries and more detailed, weekly reports to Owner.
  • Verify that all materials and equipment delivered to the project conform to the approved submittals, free of damage, safely stored/protected, and acceptable for use.
  • Maintain log of all inspections by the Authority Having Jurisdiction (AHJ). All failed inspections are to be rectified.
  • Participate actively and directly in the development and maintenance of a strong safety culture.
  • Act as liaison between General Contractor, trade partners, equipment vendors, owner operations, and commissioning agents (CxA) throughout entirety of commissioning phase.
  • Track all project design changes and ensure that they are accurately captured in appropriate as-built documentation and BIM files.
  • Support project management team on monthly applications for payment to ensure that percentage of work installed in the field matches that which has been billed.
  • Sustain a culture of open communication, transparency, and mutual respect and understanding between all project stakeholders.
Requirements
  • Bachelor’s degree in Electrical Engineering, Mechanical Engineering, or Construction Management preferred.
  • 10+ years of relevant work experience in quality assurance or quality control role in data centers or similar mission critical build typologies.
  • OSHA 30; First Aid/CPR; or able to obtain within first 90-days of hire.
  • CDCP highly preferred, but not required.
  • LEED AP highly preferred, but not required.
  • Familiarity with local and national building codes including NFPA, NEC, IBC, general life safety and egress.
  • Robust proficiency in construction management software platforms such as Procore, BlueBeam Revu, and Autodesk Cloud.
  • Strong general computing skills with a focus on Microsoft Office Suite (Word, Excel, PowerPoint, Project, and Outlook.)
  • Uncompromising commitment to safety.
  • High levels of initiative, self-direction, and attention to detail.
  • Ability to work in a close team environment.
  • Ability to motivate Contractor with solid communication skills and contract knowledge to accomplish Owner and project goals.
  • Ability to direct troubleshooting and resolution of highly complex or unusual construction problems.
  • Capable of planning and organizing internal and external resources.
  • Problem analysis.
  • Willingness to take on responsibilities with a commitment to perform.
  • Flexibility.
  • Problem-solving.
  • Decision-making.
  • Excellent communication and interpersonal skills.
  • Willingness to travel.
Get your free, confidential resume review.
or drag and drop a PDF, DOC, DOCX, ODT, or PAGES file up to 5MB.

Similar jobs

Data Center Construction Quality Assurance Manager

ZipRecruiter

Dallas

On-site

USD 90,000 - 130,000

11 days ago

Data Center Construction Quality Assurance Manager

Worldwide Mission Critical

Dallas

On-site

USD 80,000 - 100,000

30+ days ago

Quality Assurance Manager

ZipRecruiter

Marietta

Remote

USD 70,000 - 90,000

4 days ago
Be an early applicant

Quality Assurance Manager

National Power, LLC

Atlanta

Remote

USD 80,000 - 110,000

6 days ago
Be an early applicant

Quality Assurance Manager

ZipRecruiter

Atlanta

Remote

USD 70,000 - 100,000

11 days ago

Quality Assurance Manager

ZipRecruiter

Scottsdale

Remote

USD 70,000 - 90,000

3 days ago
Be an early applicant

Food Quality Assurance Manager- Remote

Lensa

Detroit

Remote

USD 80,000 - 95,000

3 days ago
Be an early applicant

Senior Quality Assurance Manager - Focus

Hudl

Remote

USD 101,000 - 169,000

4 days ago
Be an early applicant

Quality Assurance Manager

ZipRecruiter

Phoenix

Remote

USD 70,000 - 90,000

4 days ago
Be an early applicant