Data Center Construction Laborer — Growth & Impact
Salute
Fernley (NV)
On-site
USD 22,446 - 31,968
Full time
14 days+
Application generator
A complete application in a minute — tailored resume and cover letter, ready to send.
Get past ATS filters
Benefits offered by this job
Health insurance
401(k) retirement matching
Paid time off
Job summary
A leading data center services provider in Fernley, Nevada, is looking for an experienced Construction Laborer to join their team. The role includes responsibilities such as site preparation, materials handling, and assisting specialized contractors. Candidates must possess physical strength and technical knowledge, and being bilingual in English and Spanish is desirable. The position offers an hourly wage of $19.75 along with comprehensive benefits including health insurance, PTO, and a retirement plan.
Qualifications
Physical strength and endurance required.
Good hand-eye coordination for using tools and machines.
Technical knowledge preferred.
Responsibilities
Clean and prepare the job site.
Load and deliver materials.
Set up and take down temporary structures.
Operate tools and machines.
Assist specialized contractors.
Control traffic at construction sites.
Skills
Physical strength and endurance
Good hand-eye coordination
Ability to stay focused
Technical knowledge
Fluent in both English and Spanish
Job description
A leading data center services provider in Fernley, Nevada, is looking for an experienced Construction Laborer to join their team. The role includes responsibilities such as site preparation, materials handling, and assisting specialized contractors. Candidates must possess physical strength and technical knowledge, and being bilingual in English and Spanish is desirable. The position offers an hourly wage of $19.75 along with comprehensive benefits including health insurance, PTO, and a retirement plan.