Data Center Construction Laborer — Growth & Impact
Salute
Fallon (NV)
On-site
USD 22,446 - 31,968
Full time
14 days+
Application generator
Stand out for this role — generate a tailored resume and cover letter in about a minute.
Get past ATS filters
Benefits offered by this job
Health insurance
Dental insurance
Vision insurance
401(k) retirement matching
Paid time off
Parental leave
Job summary
A leading infrastructure services provider in Fallon, Nevada, is looking for a skilled Construction Laborer to join the team. Responsibilities include preparing job sites, delivering materials, setting up temporary structures, and operating machinery. Candidates should have physical strength, good coordination, and technical knowledge. The position offers a compensation of $19.75 per hour along with comprehensive benefits including health insurance, retirement matching, and paid time off.
Qualifications
Ability to lift and carry heavy equipment, up to 40 lbs.
Good hand-eye coordination and dexterity for working with small components.
Possession of a valid driver’s license for work-related travel.
Responsibilities
Clean and prepare job site.
Load and deliver materials.
Set up and take down temporary structures.
Operate tools and machines.
Help specialized contractors.
Control traffic at road construction sites.
Skills
Physical strength
Good hand-eye coordination
Technical knowledge
Ability to stay focused
Job description
A leading infrastructure services provider in Fallon, Nevada, is looking for a skilled Construction Laborer to join the team. Responsibilities include preparing job sites, delivering materials, setting up temporary structures, and operating machinery. Candidates should have physical strength, good coordination, and technical knowledge. The position offers a compensation of $19.75 per hour along with comprehensive benefits including health insurance, retirement matching, and paid time off.