Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Energy Jobline ZR is seeking an entry-level Equipment Installer for an extended field project in Abilene, TX. Training starts immediately, with the opportunity to become a permanent employee.
The role emphasizes hands-on installation in data center and construction environments, safety, and strong customer service. Shifts are 10 hours, five days a week, with benefit considerations such as per diem and hotel coverage for qualified candidates.
Job DescriptionJob Description
Paid training, Paid Time off, Vacation Time and Health Benefits.
We are looking for candidates with hands-on experience assembling, building, and working with tools.
Hours: 10 hour shifts, 5 days a week
Equipment Installer – I: Responsible for quality installation of equipment in Data Center/Construction environments as specified in engineering instructions and drawings and in accordance with customer standards. This is a field-based position.
*Join as a contractor on an extended project (over 12mo) with the possibility of transitioning to a permanent employee*
OUR VALUES