Data Center Construction Laborer/ Equipment Assembly in Meridian

Energy Jobline ZR

Meridian (ID)

On-site

USD 28,000 - 40,000

Full time

10 days ago

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Paid training
Paid Time off
Vacation Time
Health Benefits
Per diem

Job summary

Energy Jobline ZR is seeking an Entry Level Equipment Installer to train from the ground up for field-based data center/construction installations in Meridian, MS. The role starts with paid training and includes benefits like PTO, vacation, and health coverage.

The position emphasizes hands-on building, tool use, and safety compliance, with potential contractor-to-permanent conversion after 12 months. Responsibilities include installing equipment, reviewing drawings/MOPs, ensuring quality

Qualifications

  • High school diploma or equivalent.
  • Strong verbal, written and customer-facing skills.
  • Basic computer skills including MS Office.

Responsibilities

  • Install equipment in Telecom Facilities & Data Center/Construction environments
  • On-site analysis of job drawings, specifications and MOPs
  • Ensure quality installations by conforming to all applicable standards
  • Perform all work with safety as the top priority, using proper PPE
  • Maintain professional appearance and provide outstanding customer service
  • Use computer for Data Entry/Administrative tasks
  • Ability to pass background, drug, and motor vehicle screening

Skills

Communication skills
Hand tools
MS Office basics

Education

High school diploma or equivalent

Tools

Hand tools

Job description

ENTRY LEVEL INSTALLER: WE TRAIN YOU FROM THE GROUND UP! Great Opportunity to take on a new career.
THIS PROJECT BEGINS ON 7/13/2026
Location: Meridian, MS
Paid training, Paid Time off, Vacation Time and Health Benefits.
CONSTRUCTION/ MACHANICAL BACKGROUNDS ENCOURAGED!

We are looking for candidates with hands‑on experience assembling, building, and working with tools.

Hours: 10 hour shifts, 5 days a week
EQUIPMENT INSTALLER - I - JOB SUMMARY - Pay Rate Starts at $25hr (+ Daily Per Diem and Hotel Covered if qualified)

Equipment Installer - I: Responsible for quality installation of equipment in Data Center/Construction environments as specified in engineering instructions and drawings and in accordance with customer standards. This is a field-based position.

*Join as a contractor on an extended project (over 12mo) with the possibility of transitioning to a permanent employee*

ESSENTIAL JOB FUNCTIONS
  • Install equipment in Telecom Facilities & Data Center/Construction environments
  • On‑site analysis of job drawings, specifications and MOPs
  • Ensure quality installations by conforming to all applicable standards
  • Perform all work with safety as the top priority. This includes following all company and customer mandated procedures as well as utilizing the proper PPE for the task at hand
  • Maintain professional appearance and provide outstanding customer service
  • Use computer for Data Entry/Administrative tasks
  • Ability to pass background, drug, and motor vehicle screening
JOB QUALIFICATIONS- We Will Train You!
  • High school diploma or equivalent
  • Strong verbal, written and customer-facing skills
  • Basic computer skills to include MS Office or equivalent
  • Basic knowledge and skills with hand tools
STANDARD TRAINING REQUIREMENTS
  • OSHA10 required, OSHA30
  • Fall protection
  • Manlift/Forklift certification
Company Description

OUR VALUES

  • Acting Like an Owner
  • Assuming Positive intent in all employee interactions
  • Being passionate about your work
  • Challenging yourself in personal development
  • Being tireless in exceeding customer expectations
  • Assisting others to be successful as a team
  • Owning our own mistakes quickly
  • Talking with people and NOT about them
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

*Paid Training* Telecom Equipment Installer/ Construction in Meridian
*Paid Training* Telecom Equipment Installer/ Construction in Meridian

Energy Jobline ZR • Meridian (ID)

On-site
USD 28,000 - 40,000
Paid training
Paid Time off
Vacation Time
+1
Data Center Construction Laborer/ Equipment Assembly in Santa Teresa
Data Center Construction Laborer/ Equipment Assembly in Santa Teresa

Energy Jobline ZR • Santa Teresa (NM)

On-site
USD 28,000 - 40,000
Paid training
Paid time off
Vacation time
+3
Data Center Construction Laborer/ Equipment Assembly in Abilene
Data Center Construction Laborer/ Equipment Assembly in Abilene

Energy Jobline ZR • Abilene (TX)

On-site
USD 28,000 - 40,000
Paid training
Paid time off
Vacation time
+3
Entry Level Construction/ Data Center Installer - OSHA10 in Santa Teresa
Entry Level Construction/ Data Center Installer - OSHA10 in Santa Teresa

Energy Jobline ZR • Santa Teresa (NM)

On-site
USD 28,000 - 40,000
Paid training
Paid time off
Vacation time
+1
Data Center Technician I
Data Center Technician I

InfraServices • Wanamingo (MN)

On-site
USD 28,000 - 34,000
Medical, Dental, Vision Benefits
Short- & Long-Term Disability Benefits
401(K) with Company match
+1
Data Center Technician I
Data Center Technician I

InfraServices LLC • Albuquerque (NM)

On-site
USD 28,000 - 34,000
Medical, Dental, & Vision Benefits
401(K) with Company match
Paid Time Off
Data Center Technician II
Data Center Technician II

InfraServices LLC • Minnesota

Hybrid
USD 52,000 - 73,000
Medical, Dental, & Vision Benefits
401(K) with Company match
Paid Time Off
Data Center Technician II
Data Center Technician II

InfraServices • Amherst (NH)

On-site
USD 34,000 - 48,000
Medical, dental, & vision benefits
401(k) with company match
Paid time off & holidays
+1
Datacenter Technician
Datacenter Technician

Insight Global (United States) • Des Moines (IA)

On-site
USD 30,000 - 47,000
Medical insurance
Dental insurance
Vision insurance
+2
Electrician (Construction)
Electrician (Construction)

x • Southaven (MS)

Hybrid
USD 60,000 - 85,000