Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Energy Jobline ZR is seeking an Entry Level Installer for a 12‑month project in Santa Teresa, NM. Training is provided from the ground up, with 10‑hour shifts, five days a week. On-site role with potential future transition to a permanent position.
Typical duties include equipment installation in Data Center/Construction environments, on-site analysis of drawings, and ensuring quality installations with safety as a top priority. OSHA10/OSHA30 and certifications are part of standard training.
Job DescriptionJob Description
*This project is expected to last approximately 12 months. While travel is not required or expected, candidates who are open to traveling to future job sites may have the opportunity to transition into a long-term role with the company*
We are looking for candidates with hands‑on experience assembling, building, and working with tools.
Equipment Installer – I: Responsible for quality installation of equipment in Data Center/Construction environments as specified in engineering instructions and drawings and in accordance with customer standards. This is a field‑based position.
*Join as a contractor on an extended project (over 12mo) with the possibility of transitioning to a permanent employee*