Data Center Construction Field Technician

Nucor Corporation

Madison (IN)

In loco

USD 39.000 - 40.000

Tempo pieno

6 giorni fa
Candidati tra i primi

Aumenta le possibilità di ricevere una risposta da questo datore di lavoro

Il tuo curriculum e una lettera di presentazione personalizzati, che corrispondono esattamente a ciò che sta cercando.

Supera i filtri ATS

Descrizione del lavoro

Nucor Data Systems, part of Nucor Corporation, is seeking a Construction Field Technician to support on-site project duties from pre-construction through closeout, including installation of data center components and sound control devices.

Applicants should have strong knowledge of hand and power tools, measuring equipment, and be able to multitask while prioritizing safety; a valid driver's license and clean driving record are required.

Competenze

  • Must have a valid Driver’s License and a clean driving record.
  • Proficient in using tools and equipment for commercial, residential, or industrial construction.
  • Ability to multitask, prioritize, and manage time efficiently.

Mansioni

  • Assist with on-site project duties from pre-construction through closeout.
  • Install data center components and sound control devices.
  • Ensure safety policies and housekeeping standards are followed at all times.

Conoscenze

Hand tools
Power tools
Measuring equipment
Multitasking

Formazione

High School Graduated / GED

Strumenti

Forklift certification
Scissor lift certification
OSHA 10

Descrizione del lavoro

Nucor Data Systems, part of Nucor Corporation, is seeking a Construction Field Technician to support on-site project duties from pre-construction through closeout, including installation of data center components and sound control devices.

Applicants should have strong knowledge of hand and power tools, measuring equipment, and be able to multitask while prioritizing safety; a valid driver's license and clean driving record are required.

Ottieni la revisione del curriculum gratis e riservata.

o trascina qui il file.

Similar jobs

Offerte di lavoro simili che vale la pena confrontare

Traveling Data Center Field Technician
Traveling Data Center Field Technician

Nucor Corporation • San Bernardino (CA)

In loco
USD 52.000 - 78.000
Medical insurance
Dental insurance
Vision insurance
+7
Construction Field Technician
Construction Field Technician

Nucor Corporation • San Bernardino (CA)

In loco
USD 52.000 - 78.000
Medical insurance
Dental insurance
Vision insurance
+7
Construction Field Technician
Construction Field Technician

Nucor Corporation • Madison (IN)

In loco
USD 39.000 - 40.000
Field Safety Technician – Data Center & Construction
Field Safety Technician – Data Center & Construction

Nox Group • Harlingen (TX)

Ibrido
USD 42.000 - 66.000
Field Construction Technician (74002)
Field Construction Technician (74002)

Valcourt Group • Phoenix (AZ)

In loco
USD 32.000 - 42.000
Health, Vision & Dental Insurance
401(k) with Company Match
Employee Assistance Program
+3
Field Engineer: Data Center & Mission-Critical
Field Engineer: Data Center & Mission-Critical

Nox Group • Pecos (TX)

In loco
USD 70.000 - 100.000
Data Center Field Technician - Build, Install & Learn
Data Center Field Technician - Build, Install & Learn

TechnoGuard, Inc. • Sterling (VA)

Ibrido
USD 28.000 - 34.000
Paid training
Travel opportunities with per diem
Data Center Cooling Field Service Technician
Data Center Cooling Field Service Technician

Nortek Air Solutions, LLC • Texas

Ibrido
USD 55.000 - 85.000
Air-conditioned environment
Benefits start day one
401(k) match
+1
Field Construction Manager – Data Center Projects
Field Construction Manager – Data Center Projects

NTT Global Data Centers Americas, Inc. • Illinois

In loco
USD 118.000 - 169.000
Paid time off
Medical, dental, vision benefits
Life and disability insurance
+1
Data Center Field Engineer: Commissioning & Service
Data Center Field Engineer: Commissioning & Service

Nortek Air Solutions, LLC • Mississippi

Ibrido
USD 55.000 - 75.000
Health, dental, vision, life, STD, LTD