Data Center Construction Electrical Design Engineer

Worldwide Mission Critical

Plano (TX)

On-site

USD 90,000 - 130,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Worldwide Mission Critical is seeking an Electrical Design Engineer to guide planning, coordination, and execution of electrical systems on large-scale data-center projects. You will collaborate with internal teams and EoR to ensure robust, code-compliant designs that are reliable, efficient, and scalable.

You will lead documentation, reviews, and risk assessment, mentor junior engineers, and support field construction to ensure a successful handoff to operations.

Qualifications

  • Bachelor’s degree in Electrical Engineering or Power Engineering with building systems emphasis.
  • Proficiency with Revit BIM design.
  • Experience in power distribution and lighting design, including controls.

Responsibilities

  • Troubleshoot and resolve electrical design challenges with EoR and contractors.
  • Lead development/review of diagrams, load calculations, panel schedules, submittals, studies, RFIs.
  • Research new technologies to optimize data-center electrical systems for efficiency and reliability.
  • Ensure timely delivery of design packages and manage evolving requirements.
  • Ensure NEC, IEEE, IEC compliance and mitigate design risks.
  • Contribute to budget by evaluating cost impacts of changes.

Skills

Revit BIM design
Power distribution design
Electrical lighting design
Short circuit analysis
Medium/low voltage systems
Mentoring staff
MS Office proficiency

Education

Bachelor’s degree in Electrical/Power Engineering with building systems emphasis

Tools

SKM
Revit
AutoCAD

Job description

ABOUT WORLDWIDE MISSION CRITICAL

Worldwide Mission Critical is a global owner’s representation and project management company dedicated to the mission-critical industry, helping companies deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, our ability to provide oversight for all aspects of a project sets us apart.

Summary

As an Electrical Design Engineer, you will play a critical role in guiding the planning, coordination, and execution of advanced electrical systems on large-scale infrastructure projects. You will work cross-functionally with internal teams and external partners to ensure that all designs are technically robust, code-compliant, and aligned with project objectives. Your focus will be on delivering reliable, efficient, and scalable electrical solutions while upholding safety, quality, cost, and schedule commitments.

Primary Responsibilities
  • You will serve as a key liaison between internal departments, external consultants, contractors, and the Engineer of Record (EoR) to troubleshoot and resolve electrical design challenges.
  • You will lead the development and review of electrical documents, including one-line diagrams, load calculations, panel schedules, submittals, technical studies, and RFIs.
  • You will research and develop emerging trends and new technologies to optimize electrical systems and infrastructure in data centers, enhancing efficiency, reliability, and scalability.
  • You will be responsible for ensuring the timely delivery of design packages by identifying bottlenecks, introducing efficiencies, and proactively managing evolving project requirements.
  • You will ensure electrical systems meet all applicable codes and standards (NEC, IEEE, IEC) while maintaining design quality and mitigating technical risk.
  • You will contribute to budget management by evaluating the cost impact of design changes, tracking electrical expenditures, and analysing contractual obligations tied to the EoR.
  • You will participate in risk assessment and commissioning efforts, including factory and site acceptance testing, milestone inspections, and integration verification.
  • You will coordinate closely with mechanical, controls, and architectural teams to ensure the electrical systems are fully integrated into the broader design framework.
  • You will mentor and support junior engineers, reinforcing consistent design practices and ensuring knowledge continuity across the team.
  • You will help capture lessons learned and apply them to improve future design processes, standards, and project outcomes.
  • You will support construction activities in the field, resolving installation issues, conducting walkthroughs, and ensuring a successful handoff to operations.
Skills, Knowledge, Education, and Experience
  • Bachelor’s degree in Electrical Engineering or Power Engineering with electrical building systems emphasis.
  • Revit BIM design experience required.
  • Proficiency in power distribution and lighting design, including controls implementation.
  • Experience with short circuit analysis and utilisation of analytical modelling software such as SKM or similar tools.
  • Strong background in the design, construction, and commissioning of medium and low voltage electrical distribution systems, and power management or SCADA tools.
  • Preferred qualifications include a Professional Engineering (PE) license.
  • Experience in mission-critical facilities and their electrical/mechanical infrastructure.
  • Knowledge and experience in estimating, electrical design, operation, and commissioning of substations, switchgear, and power monitoring.
  • Minimum 5 years' experience in A/E industry preferred.
  • Comprehensive understanding of professional services from conceptual design through project close-out.
  • Strong written and verbal communication skills, organisational skills, and ability to motivate and mentor staff.
  • Familiarity with sustainable design approaches and related project impacts.
  • Passion for improving workflows and mentoring team members.
  • Proficient with Microsoft Productivity Suite products.

At Worldwide Mission Critical, you'll find the support, trust, and room to grow that helped us become one of the fastest-growing companies in the country — and we're just getting started.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Electrical Project Engineer - Big Data Center
Electrical Project Engineer - Big Data Center

INT Technologies • Phoenix (AZ)

On-site
USD 80,000 - 100,000
Health insurance
401(k)
Generous PTO
Electrical Design Engineer
Electrical Design Engineer

Daksta • United States

Remote
USD 120,000 - 200,000
Bonus
Benefits
Senior Electrical Engineer
Senior Electrical Engineer

Data Center Frontier LLC • Chicago (IL)

Hybrid
USD 120,000 - 180,000
Medical insurance
401(k) plan
Principal Electrical Engineer Data Centers
Principal Electrical Engineer Data Centers

Data Center Frontier LLC • Dallas (TX)

Hybrid
USD 100,000 - 130,000
Medical insurance
401(k) plan
Senior Electrical Engineer
Senior Electrical Engineer

Data Center Frontier LLC • Overland Park (KS)

On-site
USD 85,000 - 120,000
Medical insurance
401(k) plan
Competitive salaries
Data Center Construction Electrical Estimator
Data Center Construction Electrical Estimator

Worldwide Mission Critical • United States

Remote
USD 90,000 - 140,000
Senior Electrical Engineer
Senior Electrical Engineer

Pkaza - Data Center Recruiting • City of White Plains (NY)

Hybrid
USD 120,000 - 190,000
Medical insurance
401(k) plan
Electrical Project Engineer for Data Center
Electrical Project Engineer for Data Center

INT Technologies • Denver (CO)

On-site
USD 85,000 - 110,000
Health insurance
401(k) plan
Generous paid time off
Senior Electrical Engineer- Data Center Design
Senior Electrical Engineer- Data Center Design

Data Center Frontier LLC • Dallas (TX)

On-site
USD 80,000 - 120,000
Medical insurance
401(k) plan
Competitive salaries
Principal Electrical Engineer Data Centers
Principal Electrical Engineer Data Centers

Pkaza • Los Angeles (CA)

Hybrid
USD 120,000 - 160,000
Medical insurance
401(k) plan
Competitive salaries