Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
The Lane Construction Corporation seeks a cost control professional to manage project cost tracking, budgets, forecasts, and earned value reporting for assigned projects.
You will collaborate with field engineers, project managers and directors; develop cost code structures; monitor variances; and assist with change orders, reconciliations, and cash flow projections. Strong Excel skills and JD Edwards/Vision CPM experience are required.
Requisition ID11813-Posted05/13/2026-I-405 Renton/Bellvue-Reimburse (3450)-AFC-Bachelor's Degree
Lane Construction is one of America’s leading construction companies, specializing in large, complex civil infrastructure. For 135 years, it has contributed to the development of the country’s transportation systems including the Interstate Highway System and a vast network of roads, bridges, airports, metros, and railways. Lane specializes in mobility, tunneling, and water resources to address sustainable development and climate change adaptation challenges.
Responsibilities
Requirements
Education : Bachelor's Degree
Employment Conditions: 2 years of experience in cost control, with exposure to EVM concepts, Proficient in Excel, Experience with JD Edwards required, Experience with Vision CPM required
Physical Requirements: Employee is regularly required to sit; use hands to handle or feel; and talk or hear. The employee is frequently required to reach with hands and arms. The employee must be able to use fingers to grasp, move and manipulate small objects. The employee must have the ability to sit at a computer terminal for extended periods. The employee is regularly required to stand; walk and stoop, kneel, crouch. Specific vision abilities required by this job include close vision, distance vision, color vision, peripheral vision, depth perception and ability to adjust focus. The employee must have the ability to speak clearly so listeners can understand and understand the speech of another person. The employee must frequently lift and/or move up to 10 pounds and occasionally be required to lift and/or move up to 30 pounds. The work environment will consist of low levels of noise (i.e., typical office).
Lane Construction offers a comprehensive benefits package with an excellent opportunity to grow and be part of one of the most respected names in the construction industry. Lane is an Equal Opportunity Employer.