Turn this role into an interview — a resume and cover letter built around what this employer wants.
Barton Malow in Sterling, VA is seeking an experienced Scheduler to support large, fast-paced construction projects with hybrid on-site work. The role requires collaborating with the project team to develop and update schedules and to provide timely reporting to owners and subcontractors.
The ideal candidate has at least 6 years of planning and scheduling experience, especially on data center builds, and proficiency with Oracle P6, MS Office, Bluebeam, Autodesk Build, and Box.
Scheduler is typically assigned to large complex and fast paced construction projects which require hybrid work on the job-site. Willingness and enthusiasm to work on-site directly with the project team is critical. Must be a flexible and adaptable team player, as well as have strong communication and client service skills. Must develop relationships with operational personnel to drive process and deliver results.
Leads planning & scheduling efforts and assists project teams in the preparation of project schedules and has ability to progress schedule status that facilitates subcontractor and owner reporting
Has ability to establish baselines, draft narratives and perform variance, float and delay analysis
Ability to forecast a project from a schedule perspective and align with cost and manhour projections
Drive change management process to properly document scope and/or unforeseen changes related schedule on each individual project, assisting with the incorporation of fragnets and TIA preparation