Eine vollständige Bewerbung in einer Minute
Maßgeschneiderter Lebenslauf und Anschreiben – versandbereit.
Company: Barton Malow
Job Location: Sterling, Virginia
Position: Construction Scheduler (Mission Critical)
REQ ID: 11940
Scheduler is typically assigned to large complex and fast paced construction projects which require hybrid work on the job‑site. Willingness and enthusiasm to work on‑site directly with the project team is critical. Must be a flexible and adaptable team player, as well as have strong communication and client service skills. Must develop relationships with operational personnel to drive process and deliver results.
Leads planning & scheduling efforts and assists project teams in the preparation of project schedules and has ability to progress schedule status that facilitates subcontractor and owner reporting.
Has ability to establish baselines, draft narratives and perform variance, float and delay analysis.
Ability to forecast a project from a schedule perspective and align with cost and manhour projections.
Drive change management process to properly document scope and/or unforeseen changes related schedule on each individual project, assisting with the incorporation of fragnets and TIA preparation.