Construction Scheduler | Mission Critical

Sargent Electric Company

Pittsburgh (Allegheny County)

Sur place

USD 90 000 - 120 000

Plein temps

Il y a 22 heures
Soyez parmi les premiers à postuler

Obtenez une réponse de cet employeur

Votre CV et votre lettre de motivation, adaptés exactement à ce que l’employeur recherche.

Passez les filtres ATS

Résumé du poste

Sargent Electric Company in Pittsburgh, PA is seeking a Construction Scheduler for the Mission Critical business unit. The role develops, maintains, and manages detailed schedules for large-scale electrical construction projects from preconstruction through turnover, with local travel to project sites.

The ideal candidate will have a BS in Construction Management or related field and proven Primavera P6 scheduling experience, plus strong communication skills for stakeholders and field teams.

Qualifications

  • Bachelor of Science degree in Construction Management or related field.
  • Proven ability to develop and maintain Primavera P6 schedules.
  • Ability to translate complex schedule information for stakeholders.
  • Experience with construction management tools such as BuildingConnected, Vista, Bluebeam, PlanGrid, Procore, ProjectSite.

Responsabilités

  • Manage project schedules from preconstruction through turnover.
  • Develop Primavera P6 schedules and maintain baselines, updates, milestones, and critical path.
  • Drive field updates with project managers, superintendents, and field teams.
  • Integrate electrical scope into schedules across underground, grounding, raceway, cables, and equipment.
  • Incorporate procurement, prefabrication, BIM coordination, and long-lead deliveries.
  • Analyze critical path and risks; support mitigation and recovery plans.
  • Report schedule performance with baseline-versus-actual analyses and milestones.
  • Translate schedule into near-term look-aheads aligned with resources and priorities.
  • Coordinate electrical schedule with the general contractor master schedule.
  • Plan commissioning and turnover milestones including testing and documentation.
  • Communicate schedule status and establish scheduling standards and best practices.
  • Champion safety culture and pursue ongoing learning and development.
  • Perform additional duties as delegated by Sargent Electric leadership.

Connaissances

Scheduling
Risk analysis
Communication
Team coordination

Formation

Bachelor of Science in Construction Management or related field

Outils

Primavera P6
BuildingConnected
Vista
Bluebeam
PlanGrid
Procore
ProjectSite

Description du poste

Sargent Electric is a leading specialty contractor focused on electrical, instrumentation, wireless, utility, and low voltage systems. Founded in Pittsburgh in 1907, we operate from 8 locations across the Midwest, Mid-Atlantic and Northeast, delivering projects nationwide for our strategic customers.

We support the breadth of client needs, from routine 24/7 service and emergency restoration to their largest and most complex projects. Our proven safety record, technical depth, and longstanding client relationships have made us a partner of choice for Fortune 500 companies, leading general contractors, and EPC contractors.

We are seeking to hire a Construction Scheduler - Mission Critical - in our Pittsburgh, PA office.

POSITION OVERVIEW:

This full-time role supports the Mission Critical business unit by developing, maintaining, and managing detailed schedules for large-scale electrical construction projects from preconstruction through commissioning and turnover. The work location may be a project site or Mission Critical office, with local travel to project sites.

WHAT YOU'LL DO:
  • Manage Project Schedules. Develop and maintain logic-driven schedules from preconstruction through commissioning and turnover
  • Develop Primavera P6 Schedules. Maintain baselines, updates, activity logic, durations, milestones, constraints, critical path, and physical percent complete in Primavera P6
  • Drive Field-Based Updates. Work with project managers, superintendents, general foremen, and field teams so updates reflect actual conditions, installed progress, productivity, materials, access, and constraints
  • Integrate Electrical Scope. Schedule underground, grounding, raceway, cable tray, equipment setting, busway, cable installation, terminations, controls, testing, energization, commissioning, and turnover activities
  • Integrate Procurement and Prefabrication. Incorporate engineering releases, submittals, approvals, procurement, fabrication, long-lead deliveries, BIM coordination, clash detection, detailing, and material release activities
  • Analyze Critical Path and Risk. Identify critical and near-critical activities, sequencing conflicts, constraints, and emerging risks and support mitigation and recovery plans
  • Report Schedule Performance. Prepare critical-path analysis, baseline-versus-actual reporting, milestone tracking, variance analysis, look-aheads, and recovery schedules
  • Support Look-Ahead Planning. Translate the overall schedule into executable near-term plans aligned with manpower, materials, equipment, access, predecessor work, and field priorities
  • Coordinate with the General Contractor. Reconcile the electrical construction schedule with the general contractor master schedule and other trade schedules
  • Plan Commissioning and Turnover. Integrate testing, energization, startup support, commissioning, punch list, documentation, and phased turnover milestones
  • Communicate and Improve. Clearly communicate schedule status, risks, priorities, and required actions and help establish consistent Mission Critical scheduling standards and best practices
  • Champion Safety Culture. Lead by example in upholding safety standards and support best practices across field and office environments
  • Crave Learning. Grow through hands-on experience, training, and mentorship and actively engage in available development opportunities
  • Additional Responsibilities. Assume additional duties and responsibilities as delegated by Sargent Executive Management
WHAT YOU'LL BRING:
  • Bachelor of Science degree in Construction Management, Engineering, Architecture, Business Administration, or a related discipline; candidates with two or more years of relevant construction scheduling experience may receive equivalent consideration in lieu of a degree
  • Demonstrated ability to develop and maintain detailed construction schedules using Primavera P6
  • Ability to translate complex schedule information into clear, actionable information for project stakeholders
  • Experience with construction management applications such as BuildingConnected, Vista, Bluebeam, PlanGrid, Procore, ProjectSite, Primavera P6, and related applications preferred
  • Strong understanding of electrical construction sequencing in a multi-trade environment preferred
  • Excellent written, verbal, interpersonal, computer, multitasking, and time-management skills
REQUIRED EXPERIENCE:
  • At least 2 years of construction scheduling, project controls, or construction management experience supporting electrical, mission critical, data center, industrial, or other complex construction projects
  • Experience scheduling large-scale electrical construction, data center, mission critical, industrial, or similarly complex projects preferred
WHY JOIN SARGENT ELECTRIC:
  • Competitive compensation based on experience
  • Established, growing company with a strong industry reputation
  • Collaborative, team-driven environmentOpportunity to directly impact project success and cost efficiency
EQUAL EMPLOYMENT OPPORTUNITY:

Sargent Electric Company is committed to providing equal employment opportunities to all qualified individuals in accordance with applicable federal, state, and local laws.

Obtenez votre examen gratuit et confidentiel de votre CV.

ou faites glisser et déposez votre fichier ici.

Similar jobs

Postes similaires à comparer

Construction Scheduler | Mission Critical
Construction Scheduler | Mission Critical

Sargent Electric • Pittsburgh

Sur place
USD 90 000 - 130 000
Competitive compensation
Strong industry reputation
Collaborative environment
Mission-Critical Construction Scheduler | Electrical Projects
Mission-Critical Construction Scheduler | Electrical Projects

Sargent Electric Company • Pittsburgh

Sur place
USD 90 000 - 120 000
Forensic Schedule, Risk, and Planning Manager/Hybrid Flexibility
Forensic Schedule, Risk, and Planning Manager/Hybrid Flexibility

Sargent Electric Company • Pittsburgh

Hybride
USD 95 000 - 135 000
Forensic Schedule, Risk, and Planning Manager/Hybrid Flexibility
Forensic Schedule, Risk, and Planning Manager/Hybrid Flexibility

Sargent Electric • Pittsburgh

Hybride
USD 110 000 - 160 000
Electrical Construction Planner
Electrical Construction Planner

Sargent Electric Company • Pittsburgh

Sur place
USD 70 000 - 110 000
Competitive compensation
Strong industry reputation
Collaborative environment
+1
Assistant Project Manager
Assistant Project Manager

Sargent Electric Company • Pittsburgh

Sur place
USD 60 000 - 90 000
Competitive compensation based on опыт
Assistant Project Manager- Mission Critical
Assistant Project Manager- Mission Critical

Sargent Electric Company • Lancaster

Sur place
USD 65 000 - 85 000
Collaborative, team-driven environment
Competitive compensation based on experience
Opportunity to impact project success
Project Manager Mission Critical
Project Manager Mission Critical

Sargent Electric • Lancaster

Sur place
USD 80 000 - 110 000
Assistant Project Manager
Assistant Project Manager

Sargent Electric • Pittsburgh

Sur place
USD 60 000 - 80 000
Assistant Project Manager- Mission Critical
Assistant Project Manager- Mission Critical

Sargent Electric • Pittsburgh

Sur place
USD 60 000 - 80 000