Construction Scheduler | Mission Critical

Sargent Electric

Pittsburgh (Allegheny County)

On-site

USD 90,000 - 130,000

Full time

3 days ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Competitive compensation
Strong industry reputation
Collaborative environment

Job summary

Sargent Electric is seeking a Construction Scheduler - Mission Critical to develop, maintain, and manage detailed schedules for large-scale electrical projects from preconstruction through turnover. The work location may be a project site or Mission Critical office, with local travel to project sites.

You will build Primavera P6 schedules, integrate procurement and field updates, monitor critical path, and coordinate with general contractors to align schedules with milestones while upholding

Qualifications

  • Bachelor of Science degree in Construction Management, Engineering, Architecture, Business Administration, or a related discipline; candidates with two or more years of relevant construction scheduling experience may receive equivalent consideration in lieu of a degree.
  • Demonstrated ability to develop and maintain detailed construction schedules using Primavera P6.
  • Ability to translate complex schedule information into clear, actionable information for project stakeholders.
  • Experience with construction management applications such as BuildingConnected, Vista, Bluebeam, PlanGrid, Procore, ProjectSite, Primavera P6, and related applications preferred.
  • Strong understanding of electrical construction sequencing in a multi-trade environment preferred

Responsibilities

  • Manage Project Schedules. Develop and maintain logic-driven schedules from preconstruction through commissioning and turnover
  • Develop Primavera P6 Schedules. Maintain baselines, updates, activity logic, durations, milestones, constraints, critical path, and physical percent complete in Primavera P6
  • Drive Field-Based Updates. Work with project managers, superintendents, general foremen, and field teams so updates reflect actual conditions, installed progress, productivity, materials, access, and constraints
  • Integrate Electrical Scope. Schedule underground, grounding, raceway, cable tray, equipment setting, busway, cable installation, terminations, controls, testing, energization, commissioning, and turnover activities
  • Integrate Procurement and Prefabrication. Incorporate engineering releases, submittals, approvals, procurement, fabrication, long-lead deliveries, BIM coordination, clash detection, detailing, and material release activities
  • Analyze Critical Path and Risk. Identify critical and near-critical activities, sequencing conflicts, constraints, and emerging risks and support mitigation and recovery plans
  • Report Schedule Performance. Prepare critical-path analysis, baseline-versus-actual reporting, milestone tracking, variance analysis, look-aheads, and recovery schedules
  • Support Look-Ahead Planning. Translate the overall schedule into executable near-term plans aligned with manpower, materials, equipment, access, predecessor work, and field priorities
  • Coordinate with the General Contractor. Reconcile the electrical construction schedule with the general contractor master schedule and other trade schedules
  • Plan Commissioning and Turnover. Integrate testing, energization, startup support, commissioning, punch list, documentation, and phased turnover milestones
  • Communicate and Improve. Clearly communicate schedule status, risks, priorities, and required actions and help establish consistent Mission Critical scheduling standards and best practices
  • Champion Safety Culture. Lead by example in upholding safety standards and support best practices across field and office environments
  • Crave Learning. Grow through hands-on experience, training, and mentorship and actively engage in available development opportunities
  • Additional Responsibilities. Assume additional duties and responsibilities as delegated by Sargent Executive Management

Skills

Primavera P6
Scheduling
Communication
Critical Path Analysis
Look-ahead Planning

Education

Bachelor of Science in Construction Management/Related Field
2+ years scheduling experience substitute degree

Tools

BuildingConnected
Vista
Bluebeam
PlanGrid
Procore
ProjectSite
Primavera P6

Job description

Sargent Electric is a leading specialty contractor focused on electrical, instrumentation, wireless, utility, and low voltage systems. Founded in Pittsburgh in 1907, we operate from 8 locations across the Midwest, Mid-Atlantic and Northeast, delivering projects nationwide for our strategic customers.

We support the breadth of client needs, from routine 24/7 service and emergency restoration to their largest and most complex projects. Our proven safety record, technical depth, and longstanding client relationships have made us a partner of choice for Fortune 500 companies, leading general contractors, and EPC contractors.

We are seeking to hire a Construction Scheduler - Mission Critical - in our Pittsburgh, PA office.

POSITION OVERVIEW:

This full-time role supports the Mission Critical business unit by developing, maintaining, and managing detailed schedules for large-scale electrical construction projects from preconstruction through commissioning and turnover. The work location may be a project site or Mission Critical office, with local travel to project sites.

WHAT YOU'LL DO:
  • Manage Project Schedules. Develop and maintain logic-driven schedules from preconstruction through commissioning and turnover
  • Develop Primavera P6 Schedules. Maintain baselines, updates, activity logic, durations, milestones, constraints, critical path, and physical percent complete in Primavera P6.
  • Drive Field-Based Updates. Work with project managers, superintendents, general foremen, and field teams so updates reflect actual conditions, installed progress, productivity, materials, access, and constraints.
  • Integrate Electrical Scope. Schedule underground, grounding, raceway, cable tray, equipment setting, busway, cable installation, terminations, controls, testing, energization, commissioning, and turnover activities.
  • Integrate Procurement and Prefabrication. Incorporate engineering releases, submittals, approvals, procurement, fabrication, long-lead deliveries, BIM coordination, clash detection, detailing, and material release activities.
  • Analyze Critical Path and Risk. Identify critical and near-critical activities, sequencing conflicts, constraints, and emerging risks and support mitigation and recovery plans.
  • Report Schedule Performance. Prepare critical-path analysis, baseline-versus-actual reporting, milestone tracking, variance analysis, look-aheads, and recovery schedules.
  • Support Look-Ahead Planning. Translate the overall schedule into executable near-term plans aligned with manpower, materials, equipment, access, predecessor work, and field priorities.
  • Coordinate with the General Contractor. Reconcile the electrical construction schedule with the general contractor master schedule and other trade schedules.
  • Plan Commissioning and Turnover. Integrate testing, energization, startup support, commissioning, punch list, documentation, and phased turnover milestones.
  • Communicate and Improve. Clearly communicate schedule status, risks, priorities, and required actions and help establish consistent Mission Critical scheduling standards and best practices.
  • Champion Safety Culture. Lead by example in upholding safety standards and support best practices across field and office environments.
  • Crave Learning. Grow through hands-on experience, training, and mentorship and actively engage in available development opportunities.
  • Additional Responsibilities. Assume additional duties and responsibilities as delegated by Sargent Executive Management.
WHAT YOU'LL BRING:
  • Bachelor of Science degree in Construction Management, Engineering, Architecture, Business Administration, or a related discipline; candidates with two or more years of relevant construction scheduling experience may receive equivalent consideration in lieu of a degree.
  • Demonstrated ability to develop and maintain detailed construction schedules using Primavera P6.
  • Ability to translate complex schedule information into clear, actionable information for project stakeholders.
  • Experience with construction management applications such as BuildingConnected, Vista, Bluebeam, PlanGrid, Procore, ProjectSite, Primavera P6, and related applications preferred.
  • Strong understanding of electrical construction sequencing in a multi-trade environment preferred
  • Excellent written, verbal, interpersonal, computer, multitasking, and time-management skills.
REQUIRED EXPERIENCE:
  • At least 2 years of construction scheduling, project controls, or construction management experience supporting electrical, mission critical, data center, industrial, or other complex construction projects.
  • Experience scheduling large-scale electrical construction, data center, mission critical, industrial, or similarly complex projects preferred.
WHY JOIN SARGENT ELECTRIC?
  • Competitive compensation based on experience
  • Established, growing company with a strong industry reputation
  • Collaborative, team-driven environment
  • Opportunity to directly impact project success and cost efficiency
EQUAL EMPLOYMENT OPPORTUNITY:

Sargent Electric Company is committed to providing equal employment opportunities to all qualified individuals in accordance with applicable federal, state, and local laws.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Construction Scheduler | Mission Critical
Construction Scheduler | Mission Critical

Sargent Electric Company • Pittsburgh

On-site
USD 90,000 - 120,000
Mission-Critical Construction Scheduler | Electrical Projects
Mission-Critical Construction Scheduler | Electrical Projects

Sargent Electric Company • Pittsburgh

On-site
USD 90,000 - 120,000
Forensic Schedule, Risk, and Planning Manager/Hybrid Flexibility
Forensic Schedule, Risk, and Planning Manager/Hybrid Flexibility

Sargent Electric Company • Pittsburgh

Hybrid
USD 95,000 - 135,000
Forensic Schedule, Risk, and Planning Manager/Hybrid Flexibility
Forensic Schedule, Risk, and Planning Manager/Hybrid Flexibility

Sargent Electric • Pittsburgh

Hybrid
USD 110,000 - 160,000
Electrical Construction Planner
Electrical Construction Planner

Sargent Electric Company • Pittsburgh

On-site
USD 70,000 - 110,000
Competitive compensation
Strong industry reputation
Collaborative environment
+1
Assistant Project Manager
Assistant Project Manager

Sargent Electric Company • Pittsburgh

On-site
USD 60,000 - 90,000
Competitive compensation based on опыт
Assistant Project Manager- Mission Critical
Assistant Project Manager- Mission Critical

Sargent Electric Company • Lancaster

On-site
USD 65,000 - 85,000
Collaborative, team-driven environment
Competitive compensation based on experience
Opportunity to impact project success
Assistant Project Manager
Assistant Project Manager

Sargent Electric • Pittsburgh

On-site
USD 60,000 - 80,000
Assistant Project Manager- Mission Critical
Assistant Project Manager- Mission Critical

Sargent Electric • Pittsburgh

On-site
USD 60,000 - 80,000
Project Manager Mission Critical
Project Manager Mission Critical

Sargent Electric • Lancaster

On-site
USD 80,000 - 110,000