Commissioning Engineer - Data Center Construction

Canadian Breaks Consulting LLC

Childress (TX)

On-site

USD 70,000 - 110,000

Full time

14 days+
Application generator

Turn this role into an interview — a resume and cover letter built around what this employer wants.

Get past ATS filters

Job summary

Canadian Breaks Consulting, LLC, Amarillo, TX, is hiring a Commissioning Engineer – Consultant to support onsite commissioning quality control at a project in Childress, TX. This role focuses on startup preparation, checklists, functional testing, and turnover documentation.

The ideal candidate has 3+ years in commissioning, startup, or field engineering on industrial or mission-critical projects, and can read construction docs and verify installed work on site.

Qualifications

  • 3+ years of commissioning, startup, or field engineering on industrial, high-tech, semiconductor, or mission-critical projects.
  • Ability to read and interpret construction documents, specifications, control sequences, and technical manuals, and verify installed work against them.

Responsibilities

  • Support onsite commissioning quality control and startup preparation.
  • Assist contractors with startup checklists and functional testing.
  • Close documentation to enable turnover of the system.

Skills

Commissioning/Startup experience
Reading construction docs
On-site work readiness

Tools

Latista
OSHA 30

Job description

Job Description

Job Description


Commissioning Engineer – Consultant


About CBC

Canadian Breaks Consulting, LLC is a growing consulting firm based in Amarillo, TX serving clients with customized project management solutions to complex problems on critical projects.


Our Mission: \"To plan, manage, and execute projects with hearts, hands, and feet of Christ.\"


Our Core Values

Integrity: A commitment to Truth with a consistent and uncompromising adherence to strong moral and ethical principles and values.


Excellence: A constant and consistent drive to uphold and raise standards in whatever you do.


Prudence: A commitment to taking the extra step and considering the reasonableness of your actions as well as their consequences.


Stewardship: An unwavering willingness to carefully and responsibly manage interests separate from and greater than your own.


About the Role

Introduction

The Commissioning Engineer supports onsite commissioning quality control by assisting contractors with startup preparation, executing checklists and functional testing, and closing the documentation that allows a system to be turned over. This position is fully onsite at the project in Childress, TX.


Years of Experience

3+ years of relevant experience in commissioning, startup, or field engineering


Qualifications

Required


  • 3+ years of commissioning, startup, or field engineering experience on industrial, high-tech, semiconductor, or mission-critical projects.

  • Ability to read and interpret construction documents, specifications, control sequences, and technical manuals, and to verify installed work against them.

  • Able to work fully onsite in Childress, TX, access all areas and levels of an active construction site, pass a pre-employment drug and alcohol screen, and work in the United States without sponsorship.


Preferred


  • Thorough understanding of all aspects of commissioning, from pre-functional checklists through functional performance testing and turnover.

  • Familiarity with medium- and low-voltage distribution, large generators, UPS equipment, and electrical installations on large mechanical and process equipment.

  • Hands-on BMS, EPMS, or I&C verification and functional testing experience.

  • Hands-on experience supporting integrated systems testing and load bank testing.

  • Data center or other mission-critical MEP startup exposure.

  • Experience with commissioning management software such as Latista or equivalent.

  • OSHA 30 certification and current


Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Commissioning Engineer
Commissioning Engineer

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 115,000 - 165,000
Fully covered health insurance
Dental & Vision Insurance
2 weeks PTO
Commissioning Manager - Data Center Construction
Commissioning Manager - Data Center Construction

Canadian Breaks Consulting, LLC • Childress (TX)

On-site
USD 175,000 - 225,000
Health insurance
Dental & Vision insurance
Paid time off
Commissioning Manager - Data Center Construction
Commissioning Manager - Data Center Construction

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 175,000 - 225,000
Health insurance
Dental & Vision Insurance
2 weeks PTO
Commissioning Field Superintendent - Data Center Construction
Commissioning Field Superintendent - Data Center Construction

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 155,000 - 205,000
Health insurance
Dental & Vision insurance
Paid time off
Commissioning Manager
Commissioning Manager

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 175,000 - 225,000
BCBS Health Insurance
Dental & Vision Insurance
2 weeks PTO
Commissioning Field Superintendent
Commissioning Field Superintendent

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 155,000 - 205,000
BCBS health insurance
Dental & Vision insurance
2 weeks PTO
Onsite Data Center Commissioning Engineer
Onsite Data Center Commissioning Engineer

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 70,000 - 110,000
Onsite Data Center Commissioning Lead, Senior Consultant
Onsite Data Center Commissioning Lead, Senior Consultant

Canadian Breaks Consulting, LLC • Childress (TX)

On-site
USD 175,000 - 225,000
Health insurance
Dental & Vision insurance
Paid time off
Commissioning Manager | Data Center - 1S6J016
Commissioning Manager | Data Center - 1S6J016

SNIPEBRIDGE • Phoenix (AZ)

On-site
USD 120,000 - 170,000
Data Center Commissioning Lead – Onsite Startup Expert
Data Center Commissioning Lead – Onsite Startup Expert

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 175,000 - 225,000
Health insurance
Dental & Vision Insurance
2 weeks PTO