Commissioning Engineer - Data Center Construction

Canadian Breaks Consulting LLC

Childress (TX)

On-site

USD 115,000 - 165,000

Full time

9 days ago
Application generator

Turn this role into an interview — a resume and cover letter built around what this employer wants.

Get past ATS filters

Benefits offered by this job

Fully covered BCBS health insurance
Dental & Vision Insurance
2 weeks PTO

Job summary

Canadian Breaks Consulting, LLC seeks a Commissioning Engineer to support onsite commissioning quality control on a Childress, TX project. You will assist contractors with startup preparation, execute checklists, perform functional testing, and close documentation enabling system turnover.

Requirements include 3+ years in commissioning, startup, or field engineering on industrial or mission-critical projects, and the ability to work fully onsite in Childress, TX.

Qualifications

  • 3+ years of commissioning, startup, or field engineering experience on industrial, high-tech, semiconductor, or mission-critical projects.

Responsibilities

  • Perform verification of MEP, electrical, and controls system installations and witness testing against drawings, specifications, and sequences of operation.
  • Execute pre-functional checklists, startup verification, and functional performance testing, and support integrated systems testing and load bank testing.
  • Assist contractors with startup preparation, including readiness checks, checklist execution, and documentation review.
  • Ensure all systems are ready to operate safely and all safety precautions are in place before any system is operated.
  • Interface between trade managers and multiple subcontractors to assist in coordinating mechanical, electrical, and controls startups.
  • Maintain commissioning records, checklists, and status tracking logs in the project commissioning management system so documentation matches field conditions.
  • Interpret construction documents and technical manuals required for verification and document control.
  • Log, track, and close commissioning deficiencies, including verification of retest.
  • Compile turnover documentation, including O&M manuals, training records, and warranty start dates.

Skills

Commissioning
Field engineering
Startup testing
Documentation
Electrical installations
MS Office
Team collaboration

Tools

Latista
Prolog
Procore
E-Builder
Bluebeam
Microsoft Project
Primavera P6
AutoCAD
Revit
Navisworks

Job description

Commissioning Engineer – Consultant
About CBC

Canadian Breaks Consulting, LLC is a growing consulting firm based in Amarillo, TX serving clients with customized project management solutions to complex problems on critical projects.

Our Mission: "To plan, manage, and execute projects with hearts, hands, and feet of Christ."

Our Core Values

Integrity: A commitment to Truth with a consistent and uncompromising adherence to strong moral and ethical principles and values.

Excellence: A constant and consistent drive to uphold and raise standards in whatever you do.

Prudence: A commitment to taking the extra step and considering the reasonableness of your actions as well as their consequences.

Stewardship: An unwavering willingness to carefully and responsibly manage interests separate from and greater than your own.

About the Role
Introduction

The Commissioning Engineer supports onsite commissioning quality control by assisting contractors with startup preparation, executing checklists and functional testing, and closing the documentation that allows a system to be turned over. This position is fully onsite at the project in Childress, TX.

Years of Experience

3+ years of relevant experience in commissioning, startup, or field engineering

Qualifications
Required
  • 3+ years of commissioning, startup, or field engineering experience on industrial, high-tech, semiconductor, or mission-critical projects.
  • Ability to read and interpret construction documents, specifications, control sequences, and technical manuals, and to verify installed work against them.
  • Able to work fully onsite in Childress, TX, access all areas and levels of an active construction site, pass a pre-employment drug and alcohol screen, and work in the United States without sponsorship.
Preferred
  • Thorough understanding of all aspects of commissioning, from pre-functional checklists through functional performance testing and turnover.
  • Familiarity with medium- and low-voltage distribution, large generators, UPS equipment, and electrical installations on large mechanical and process equipment.
  • Hands‑on BMS, EPMS, or I&C verification and functional testing experience.
  • Hands‑on experience supporting integrated systems testing and load bank testing.
  • Data center or other mission‑critical MEP startup exposure.
  • Experience with commissioning management software such as Latista or equivalent.
  • OSHA 30 certification and current site‑safety credentials.
  • Highly developed visual observation and interpretation skills.
  • Proficient in Windows and Microsoft Office 365 (Excel, Word, Outlook, Power Point and Teams), and have a strong understanding of working within a computer network.
  • Experience with project management software such as Prolog, Procore, E-Builder, Bluebeam, Microsoft Project, and Primavera Project Planner (P6).
  • Experience with design software such as AutoCAD, Revit and Navisworks.
  • Training in design and construction document reading, design specifications, survey theory and techniques.
  • Experience in organizing technical data in a neat and accurate method. Familiar with Construction Specifications Institutes (CSI) MasterFormat.
  • Strong understanding of construction means and methods, sequencing, and field practices.
  • Ability to work well and maintain a cooperative attitude in a fast‑paced environment and manage multiple priorities.
  • Excellent time‑management skills and ability to multi‑task and prioritize work while frequently interrupted by phone calls and questions on work in progress.
  • Excellent written and oral communication skills with an ability to develop strong interpersonal relationships.
  • Ability to work closely with variety of trade and craft people in a field work situation. Patience and professionalism are essential.
  • Must be a strong team player with the ability to collaborate with various personnel within and across departments and at all levels of leadership.
  • Work schedule must be flexible to allow extended hours or off‑shift work to accommodate changing construction schedule and sequences.
Key Responsibilities
  • Perform verification of MEP, electrical, and controls system installations and witness testing against drawings, specifications, and sequences of operation.
  • Execute pre-functional checklists, startup verification, and functional performance testing, and support integrated systems testing and load bank testing.
  • Assist contractors with startup preparation, including readiness checks, checklist execution, and documentation review.
  • Ensure all systems are ready to operate safely and all safety precautions are in place before any system is operated.
  • Interface between trade managers and multiple subcontractors to assist in coordinating mechanical, electrical, and controls startups.
  • Maintain commissioning records, checklists, and status tracking logs in the project commissioning management system so documentation matches field conditions.
  • Interpret construction documents and technical manuals required for verification and document control.
  • Log, track, and close commissioning deficiencies, including verification of retest.
  • Compile turnover documentation, including O&M manuals, training records, and warranty start dates.
Pay and Benefits

$115,000-$165,000

  • Fully covered Employee+Fam BCBS PPO health insurance
  • Fully covered Employee+Fam Dental & Vision Insurance
  • 2 weeks PTO
Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Commissioning Engineer
Commissioning Engineer

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 115,000 - 165,000
Fully covered health insurance
Dental & Vision Insurance
2 weeks PTO
Commissioning Manager - Data Center Construction
Commissioning Manager - Data Center Construction

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 175,000 - 225,000
Health insurance
Dental & Vision Insurance
2 weeks PTO
Commissioning Manager
Commissioning Manager

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 175,000 - 225,000
BCBS Health Insurance
Dental & Vision Insurance
2 weeks PTO
Commissioning Field Superintendent - Data Center Construction
Commissioning Field Superintendent - Data Center Construction

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 155,000 - 205,000
Health insurance
Dental & Vision insurance
Paid time off
Commissioning Field Superintendent
Commissioning Field Superintendent

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 155,000 - 205,000
BCBS health insurance
Dental & Vision insurance
2 weeks PTO
Security Construction Manager - Data Centers
Security Construction Manager - Data Centers

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 175,000 - 225,000
Health insurance (BCBS PPO)
Dental & Vision insurance
PTO 2 weeks
Mechanical QA/QC - Data Center Construction
Mechanical QA/QC - Data Center Construction

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 150,000 - 175,000
BCBS PPO health insurance
Dental & Vision insurance
2 weeks PTO
Mechanical Field Superintendent - Senior Consultant
Mechanical Field Superintendent - Senior Consultant

Canadian Breaks Consulting LLC • Boise (ID)

On-site
USD 175,000 - 225,000
Fully covered Employee+Fam BCBS PPO 건강
Fully covered Employee+Fam Dental &amp
2 weeks PTO
Mechanical Field Superintendent
Mechanical Field Superintendent

Canadian Breaks Consulting LLC • Boise (ID)

On-site
USD 175,000 - 225,000
Health insurance
Dental insurance
Vision insurance
+1
Security Construction Manager
Security Construction Manager

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 175,000 - 225,000
Health insurance
Dental & Vision Insurance
2 weeks PTO