BCBA: Flexible Hours & Travel-Time, Impactful ABA Roles

Healthcare Recruiters International

Houston (TX)

On-site

USD 96,000 - 131,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

5K Sign-On Bonus
Paid mileage
Paid travel time
401K w/ match
PTO & Paid Holidays

Job summary

HealthCare Recruiters International is seeking a Board Certified Behavioral Analyst (BCBA) for in-home and school-based services in the Houston area. The position supports children ages 2–8 with flexible full-time or part-time schedules and a generous hourly rate.

Travel is required with mileage and travel time paid, plus 5K–10K relocation assistance. Responsibilities include treatment planning, parent training, and collaborating with a Clinical Director.

Qualifications

  • Master's Degree in a related field.
  • BCBA certification required.
  • 1+ years of BCBA experience preferred.
  • Newly licensed candidates with extensive RBT experience will be considered.
  • Passion for ABA services.
  • Willingness to relocate to TX and reside in Houston/Katy/Pearland.
  • Commitment of at least 15+ hours per week.
  • Ability to work until 7 PM two days per week.

Responsibilities

  • Offer full-time or part-time services.
  • Maintain regular hours (9–5, 10–6, or 11–7) with some evenings 4–7 PM.
  • Create and update treatment plans and provide parent training.
  • Travel between clients; caseload approximately 6–8.
  • Document and communicate case progress with Clinical Director.

Skills

BCBA experience
RBT experience
ABA services
Flexibility hours

Education

Master's Degree
BCBA certification

Job description

HealthCare Recruiters International is seeking a Board Certified Behavioral Analyst (BCBA) for in-home and school-based services in the Houston area. The position supports children ages 2–8 with flexible full-time or part-time schedules and a generous hourly rate.

Travel is required with mileage and travel time paid, plus 5K–10K relocation assistance. Responsibilities include treatment planning, parent training, and collaborating with a Clinical Director.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

BCBA, Board Certified Behavioral Analyst
BCBA, Board Certified Behavioral Analyst

Healthcare Recruiters International • Houston (TX)

On-site
USD 96,000 - 131,000
5K Sign-On Bonus
Paid mileage
Paid travel time
+2
BCBA - Flexible Hours, Lead Evaluations & Supervision
BCBA - Flexible Hours, Lead Evaluations & Supervision

Hidden Light ABA • Houston (TX)

Remote
USD 88,000 - 105,000
Sign up bonus
Health Insurance
401K with Matching
+6
BCBA: In-Home Behavior Analyst | Flexible Hours & Growth
BCBA: In-Home Behavior Analyst | Flexible Hours & Growth

Strive ABA Therapy • Lynn (MA)

Hybrid
USD 117,000 - 138,000
Competitive salary
Flexible schedule
Career advancement opportunities
+5
BCBA: Impactful ABA Leader — Flexible, Relocation Covered
BCBA: Impactful ABA Leader — Flexible, Relocation Covered

Key Autism Services - Texas • Houston (TX)

Hybrid
USD 80,000 - 115,000
Competitive salary commensurate with experience
Comprehensive Health Coverage
Generous 401k Retirement Plan
+6
BCBA I: Impactful ABA with Mentorship & WFH Options
BCBA I: Impactful ABA with Mentorship & WFH Options

Amenity ABA Center • Houston (TX)

Hybrid
USD 75,000 - 91,000
Health Insurance
PTO
Sick Time Off
+3
Board Certified Behavioral Analyst (BCBA) W/2 years Experience (Minimum) MEDICAID CREDENTIALED
Board Certified Behavioral Analyst (BCBA) W/2 years Experience (Minimum) MEDICAID CREDENTIALED

Safe Haven Mental Health Solutions • Houston (TX)

On-site
USD 80,000 - 95,000
BCBA: Impactful ABA Leader, Flexible Hours, Sign-On Bonus
BCBA: Impactful ABA Leader, Flexible Hours, Sign-On Bonus

Above and Beyond Therapy • Philadelphia

On-site
USD 4,500 - 7,500
Sign-on bonus
Relocation bonus
Health insurance
+3
BCBA: In-Home ABA with Flexible Hours & Travel
BCBA: In-Home ABA with Flexible Hours & Travel

Strive ABA Therapy • Lawrence (MA)

Hybrid
USD 117,000 - 138,000
Competitive salary commensurate with教育
BCBA: Flexible Schedule, Small Caseloads, Relocation
BCBA: Flexible Schedule, Small Caseloads, Relocation

Texas ABA Centers • Cross Timber (TX)

On-site
USD 85,000 - 110,000
401(k) with employer match
Performance bonuses
Student-loan repayment
+3
In-Home BCBA Leader: Mentor RBTs & Drive Real Impact
In-Home BCBA Leader: Mentor RBTs & Drive Real Impact

Spectrum of Hope • Houston (TX)

On-site
USD 76,000 - 90,000
Bonus structure
Autonomy and leadership opportunity