Assistant Project Manager: Construction & Scheduling
Insight Global
Glastonbury (CT)
On-site
USD 65,000 - 88,000
Full time
14 days+
Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Get past ATS filters
Benefits offered by this job
Medical insurance
401(k)
Vision insurance
Job summary
A professional services firm is seeking an experienced Assistant Project Manager in Glastonbury, Connecticut. This role involves working with Senior Project Managers throughout the project lifecycle, managing RFPs, budgets, and schedules. Candidates should have a degree in engineering and proficiency in AutoCAD. The position offers a salary between $65,000 and $88,000 annually, alongside benefits such as medical and vision insurance.
Qualifications
Ability to read, navigate, and analyze architectural construction documents.
Previous construction experience required.
Proficiency in Microsoft Office Suite.
Responsibilities
Perform Quantity Takeoffs and document data effectively.
Generate Project Budgets for management and clients.
Manage RFP processes and create leveling spreadsheets.
Skills
Reading architectural construction drawings
Proficiency in Microsoft Excel
Understanding of CAD programs
Education
Engineering Degree (Mechanical / Civil preferred)
Tools
AutoCAD
Job description
A professional services firm is seeking an experienced Assistant Project Manager in Glastonbury, Connecticut. This role involves working with Senior Project Managers throughout the project lifecycle, managing RFPs, budgets, and schedules. Candidates should have a degree in engineering and proficiency in AutoCAD. The position offers a salary between $65,000 and $88,000 annually, alongside benefits such as medical and vision insurance.