An application made for this job — a tailored resume and cover letter that speak straight to the posting.
Eaton’s CPDI OPS Operations division is seeking an Assembler I - 2nd shift at our Spring Forest Rd, Raleigh, NC site. The hourly rate is $18.50 plus a 10% shift differential. Core hours are 2:30pm-11:00pm. This on-site role involves building sub-assemblies and wiring for UPS systems and ensuring quality standards at Raleigh Plant.
You will follow SOPs, inspect materials, use fixtures and tools, and contribute to safety and process improvements while working with a team of dedicated professionals.
Eaton’s CPDI OPS Operations division is seeking an Assembler I - 2nd shift at our Spring Forest Rd, Raleigh, NC site. The hourly rate is $18.50 plus a 10% shift differential. Core hours are 2:30pm-11:00pm. This on-site role involves building sub-assemblies and wiring for UPS systems and ensuring quality standards at Raleigh Plant.
You will follow SOPs, inspect materials, use fixtures and tools, and contribute to safety and process improvements while working with a team of dedicated professionals.