Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.
TotalEnergies, Istanbul-based AGUP-2 project, seeks a Vendors QC Inspector (Turkish Nationals Only). The role ensures quality from fabrication through testing, aligning with ITPs, QCPs, and project standards. Strong CSWIP/NDT/Welding skills, 10+ years in oil & gas, and fluent English are required.
Responsibilities include documentation review, NCR handling, and collaboration with QA/QC teams, vendors and third-party inspectors in a high-stakes environment.
Our client is a global multi-energy company operating large-scale refining and petrochemical facilities. It transforms crude oil into fuels and essential industrial products through highly integrated and technologically advanced operations. The organisation is recognised for its strong HSE culture, operational excellence, and commitment to reducing environmental impact. Joining the company means contributing to complex international projects within a high-performance industrial environment.
MISSIONS & ACTIVITIES
DIMENSIONS
AGUP PHASE 2 – CPF-2 VENDORS QC INSPECTOR M/F
The main missions and activities of the Job Holder are as follows:
Document Review & Records
Compliance & Standards
Factory Acceptance & Testing
Reporting & Coordination
CONTEXT & ENVIRONMENT
Agreements were signed by TotalEnergies in Iraq to enhance the development of the country’s natural resources. The GGIP project, located in the Basra region, a 5-in-1 project:
The Associated Gas Upstream Project Phase 1: Enhance Ratawi Oil field production thanks to infrastructures upgrade and new export pipeline (AGUP1), in addition to a gas export and process facilities (AG25).
The Associated Gas Upstream Project Phase 2: Enhance Ratawi Oil field production to 210 kbpd with a new CPF and additional development wells (AGUP2).
The Gas Midstream Project - GMP: Valorise the gas from Ratawi, Majoon and Al Qurna West-2 (Phase I) oil fields.
The Common Seawater Supply Project - CSSP: Major water-injection project that will help the long-term production of several fields of South Iraq. TotalEnergies will only be involved into the seawater treatment plant building.
The Solar Power Plant - SPP: major solar project (PV plant with 1250 GW DC) which will allow to produce power (1000 GW AC) to be injected into the grid.
AGUP Phase 2 is the major full field development. It involves drilling around 221 wells, feeding a new built CPF, at TotalEnergies standards, with a capacity of 210 kbopd. Oil will flow respectively at 60 to 80 kbopd from Yamama (~100 MMscfd) and 150 to 130 kbopd from LP reservoirs (~30 MMscfd).
AGUP2 project will be developed with the objective to maximise economical results, with a particular focus on the CAPEX, while maintaining the technical quality of the installations, with high H3SE requirements and focus. The project development includes several interfaces with other projects (mainly AGUP ph1, GMP and CSSP) which shall be managed in an optimised and agile manner.
The country context is complex due to several factors and risks to be mitigated all along the project. Particular attention will be paid to the safety culture enhancement and to the local content that will be a key factor for the Project’s success.
ACCOUNTABILITIES
CANDIDATE PROFILE / QUALIFICATIONS
Accountable for ensuring that all vendor manufacturing, inspection, and testing activities are performed in full compliance with:
Contract requirements,
Approved project specifications and drawings,
Applicable TotalEnergies GS specifications,
International codes and standards referenced in the contract,
Follow-up and assessment of the Quality during CPF-2 Procurement and EPSCC Subcontracting activities,
Raise awareness of the management for any deviation in regards with Quality or to EPSCC contract requirements,
Accountable for issuing clear, factual, and timely inspection reports,
Accountable for verifying that approved ITPs and Quality Control Plans (QCPs) are strictly applied by the Vendor, including:
Respect of Hold, Witness, Review, and Surveillance points
Proper notification to COMPANY / CONTRACTOR as required by contract
No progression beyond Hold Points without written clearance
Material Compliance & Traceability
Accountable for confirming material conformity and traceability in accordance with contract and GS requirements, including:
Verification of Material Test Certificates (MTC / EN 10204)
Traceability from raw material to finished equipment
Proper identification, segregation, storage, and preservation
Accountable for preventing use of non-conforming, unidentified, or untraceable materials.
Professional experience:
Degree: Diploma/ Degree in technical discipline,
Minimum 10 years of experience in Oil & Gas Industry or Heavy industries with similar large-scale projects and context in Contract, Engineering and Construction activities for Onshore (or Onshore yards) projects,
Experience in Quality Supervision, Inspection coordination, Procurement, Non destructive Examination and Welding,
Welding Professional Qualification – Minimum CSWIP 3.2.1 certification
NDT Qualification – Minimum CSWIP or PCN Level II in RT and ASNT Level II in UT/MT/PT
Painting/Coating Qualification – Minimum BGAS/CSWIP Grade 2 or AMPP (NACE CIP) Grade 2
Experience in Engineering discipline might be a plus,
Ability to adapt and to represent the Company in discussions and meetings with Vendors, main Contractor and Subcontractors,
Flexibility and mobility,
Proven records of ability to effectively integrate a team and adhere to team-spirit rules. Demonstrate sound organisation ability and work in a multi-cultural/international business environment,
Strong Leadership Good interpersonal and communication skills; Good motivational skills,
Dedication and ability to work under pressing conditions.
Fluent in English (absolute mandatory)
Place of work : Istanbul, Turkey