Data Center Construction Project Manager

hxt construction pte. ltd.

Singapore

On-site

SGD 90,000 - 130,000

Full time

13 days ago
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

hxt construction pte. ltd. seeks a Project Execution professional to manage day-to-day site operations for critical data center projects, coordinating MEP systems and ensuring alignment with fast-track hyperscale schedules.

The role emphasizes safety, QA/QC, and rigorous coordination across contractors and vendors. The position requires oversight of installation and integration of power, cooling, and ICT infrastructure, with attention to redundancy configurations and adherence to local

Responsibilities

  • Manage day-to-day site operations for data center construction (CSA + MEP).
  • Coordinate contractors across critical systems including power, cooling, and fire protection.
  • Ensure works align with fast-track schedules typical of hyperscale and colocation builds.
  • Oversee installation and integration of critical infrastructure: medium/low voltage power distribution, cooling systems, ICT infrastructure.
  • Ensure redundancy configurations (N+1, 2N, etc.) are properly implemented.
  • Ensure compliance with local regulations and authority requirements (e.g., Singapore’s Building and Construction Authority).
  • Align construction with industry standards such as Uptime Institute Tier classifications and/or TIA standards.
  • Enforce strict safety standards due to high-risk electrical and mechanical works.
  • Conduct regular audits, risk assessments, and toolbox meetings.
  • Ensure all installations meet mission-critical tolerances and specifications.
  • Monitor inspections, testing, and turnover processes.
  • Manage punch lists and defect rectification.
  • Coordinate with commissioning teams for FAT, SAT, IST.
  • Ensure systems are ready for energization and operational validation.
  • Track progress against critical milestones (e.g., RFSU – Ready for Service).
  • Identify risks to schedule and implement recovery plans.
  • Support cost tracking, variation orders, and contractor claims.
  • Manage general contractors, MEP subcontractors, and equipment vendors.
  • Ensure proper sequencing and interface coordination between trades.
  • Ensure completion of as-built drawings, O&M manuals, and turnover packages.
  • Support smooth transition to operations and facilities teams.

Skills

Site management
MEP coordination
Quality control
Safety audits

Job description

hxt construction pte. ltd. seeks a Project Execution professional to manage day-to-day site operations for critical data center projects, coordinating MEP systems and ensuring alignment with fast-track hyperscale schedules.

The role emphasizes safety, QA/QC, and rigorous coordination across contractors and vendors. The position requires oversight of installation and integration of power, cooling, and ICT infrastructure, with attention to redundancy configurations and adherence to local

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Data Center Build Site Lead - Planning & Execution
Data Center Build Site Lead - Planning & Execution

firmus metal international pte. ltd. • Shenton Way

On-site
SGD 120,000 - 180,000
Senior Data Center Infrastructure Project Lead
Senior Data Center Infrastructure Project Lead

jac recruitment pte. ltd. • Singapore

On-site
SGD 180,000 - 240,000
PROJECT MANAGER
PROJECT MANAGER

hxt construction pte. ltd. • Singapore

On-site
SGD 90,000 - 130,000
Data Center Project Manager (Singapore)
Data Center Project Manager (Singapore)

CBRE Group, Inc. • Singapore

On-site
SGD 120,000 - 180,000
Project Manager - Data Centre
Project Manager - Data Centre

BUILDBRIDGE PARTNERS PTE. LTD. • Singapore

On-site
SGD 120,000 - 180,000
Data Center Project Manager (36-Month Contract)
Data Center Project Manager (36-Month Contract)

CBRE Group, Inc. • Singapore

On-site
SGD 120,000 - 180,000
Project Manager (Data Center Project)
Project Manager (Data Center Project)

LEIGHTON CONTRACTORS (ASIA) LIMITED (Singapore Branch) • Singapore

On-site
SGD 120,000 - 180,000
Data Centre Project Engineer - Build & Delivery
Data Centre Project Engineer - Build & Delivery

Staffhub Group • Singapore

On-site
SGD 42,000 - 62,000
Data Center Project Lead: Critical Infra & MEP Delivery
Data Center Project Lead: Critical Infra & MEP Delivery

CBRE Group, Inc. • Singapore

On-site
SGD 120,000 - 180,000
Senior Data Centre Project Manager
Senior Data Centre Project Manager

jac recruitment pte. ltd. • Singapore

On-site
SGD 180,000 - 240,000