Stand out for this role — generate a tailored resume and cover letter in about a minute.
Amelia Coal Mining Limited is seeking a senior civil engineer to coordinate, monitor, and ensure the timely execution of civil projects at the railway siding, ensuring safety, regulatory compliance, and cost effectiveness for the Amelia Coal Mine project in India.
You will review drawings and estimates, supervise contractors, manage materials and schedules, develop subordinates, and drive quality control and safety practices across site activities.
BUSINESS_UNIT-1 Amelia Coal Mining Limited
BUSINESS_UNIT-3 Amelia Coal Mining Limited
Country India
Function Engg, Main & Utility Services
Rail Operations Civil Design
Post Graduate
Coordinate, monitor, and ensure the timely execution of civil projects and activities in a cost-effective manner while maintaining high-quality standards, specifically focusing on work at the railway siding, to ensure smooth operations and compliance with safety and regulatory requirements.
Job Context:
Amelia Coal Mine is located in the Main basin of Singrauli Coalfield, Singrauli District of Madhya Pradesh (~37 km from Singrauli City). The block has been allotted to THDC India Limited, a Mini Ratna Public Sector Undertaking (Joint Venture of NTPC Limited and Government of Uttar Pradesh). THDC has appointed Amelia Coal Mining Limited as their MDO. In FY2023, ACML has begun Overburden Removal and Coal Production. State of Art Technology utilized in Amelia Coal Mine is combination of shovels and dumpers and Surface Miners. Amelia Coal Mine is currently in the ramp-up phase with Peak Rated Capacity (PRC) of 5.6 Million Tonnes Per Annum. Scope of the MDO includes Access to Site, Finance, deploy HEMM, Operate and Maintain Mine, excavate and deliver coal; Construction and Maintain of Coal Handling Plant (CHP), infrastructure including Conveyor (Mine to Railway Siding), Railway Siding, Approach and Access Roads; Arrange Power Supply, Undertake Land Acquisition, R&R, obtain possession of land, procure and renew EC, FC, licenses, permits, etc.
Major Challenges:
Some of the major challenges includes achieve and maintain peak coal production and overburden removal, ensure safe operation, maintain coal quality, shifting of Project PDFs, facilitate land acquisition, physical possession of land, implementation of R&R policy, construction, operation and maintenance of Coal Handling Plant (CHP), Coal Conveyor and Railway Siding, compliance with statutory norms, renewal/ amendment of statutory clearances, undertake progressive mine closure, facilitate smooth operation and comply with the requirements as per terms of contract with THDC, Contractors, Sub-Contractors, etc.
KRA (Accountabilities) (Max 1325 Characters)
Supporting Actions (Max 1325 Characters)
KRA1 Estimates / Drawings
KRA2 Quality Control Management
KRA3 Material & Time Management
KRA4 Cost Control
KRA5 Safety
KRA6 Development of Subordinates