JOB PURPOSE:
Responsible for undertakingprotective relay setting and coordination, short circuit simulations,protection assessment, the development of protection setting guidelines,transmission line and equipment parameter modeling to ensure a safe, efficient,secure and reliable operation of the NGCP grid (230kV and above) and subgrid(115kV and below) protection system
PrincipalDuties and Responsibilities
- Responsibility1:PREPARATION OF PROTECTIVE RELAY SETTINGS FOR VARIOUS NGCP NEW/UPGRADINGPROJECTS
- Conductactivities, analyze, evaluate and prepare of new Protection Settings asreferred to Existing Luzon Grid System Configuration and/or Ultimate Scheme.
- Participate in coordination meetings with other functional groups regardingupcoming projects.
- Analyze and evaluate protection setting schematic diagram, downloaded relayparameters, relay manuals provided by P&E, O&M and RRA for projectsrelated activities.
- Preparation of protective relay settings (Grid/Subgrid) for new/upgradingprojects.
- Assessment and preparation of relay settings for System IntegratedProtection Scheme (SIPS).
- Evaluate maintenance and standardization of setting template using MCADsoftware for each relay installed in the grid to ensure conformity with theapproved protective relay setting guidelines.
- Updating of ASPEN Oneliner basecase to reflect Grid changes.
- Conduct short circuit simulation using ASPEN ONELINER software.
- Monitoring on the implementation of issued protection settings.
- Validation of returned/implemented protection settings.
- Responsibility2:EFFICIENT PROTECTION SETTINGS ON INSTALLED/EXISTING PROTECTION RELAYS IN LUZONGRID
- Preparationofnecessary protection setting on existing relays installed on substationsaffected by on-going upgrading/new projects and customer related connectionapplications.
- Monitor any dynamic changes in Luzon Grid including 69kV (Subgrid)distribution owned by NGCP.
- Assessment on applicability of existing protection schemes in compliancewith NGCP Protection Philosophy.
- Review and preparation of protection settings for substations(Grid/Subgrid) affected by system re-configuration.
- Evaluate submitted latest protection schematic diagram and downloaded relayparameter (as-left) from concerned O&M (MTD & Districts).
- Monitoring on the implementation of issued protection settings.
- Validation of returned/implemented protection settings.
- Responsibility3:PROPER SETTING COORDINATION OF CUSTOMER PROTECTION WITH LUZON GRID SYSTEMPROTECTION
- Protection reviewon submitted/provided protection settings from customers such as Power Plant(IPPs) and Distribution Utilities (DUs) to have proper protection settingcoordination.
- Conduct plant/customer visit regarding requirements on protection settingreview.
- Evaluate the required setting documents such as protection diagram, relaymanuals and relay settings provided by respective customer.
- Protection assessment on customer protection scheme if in compliance withNGCP Philosophy.
- Review on customer protection settings as referred to NGCP ProtectionSetting Methodology and practices.
- Provide recommendation on setting adjustment and/or possible additionalprotection installation.
- Responsibility4:PROTECTION ASSESSMENT ON CUSTOMER CONNECTION APPLICATION
- Ensure that theprotection system of upcoming customer will be in compliant with protectionphilosophy and well- coordinated with Grid/Subgrid protection system.
- Assessment on submitted documents related to protection relays and theirrespective settings.
- Updating of ASPEN Oneliner basecase to include additional connection.
- Prepare protection setting review on affected substations/feeders.
- Arrange or participate in coordination meeting regarding protectionrequirements related to protection coordination in compliance with NGCPProtection Setting Methodology.
- Provide recommendation to protection system and signify approval onconcerned customer connection application.
- Responsibility5:ACTIVE MONITORING OF LUZON GRID FAULT LEVEL DATA
- Monitor thedynamic changes on Luzon Grid substation buses fault level magnitude and ensureprotection system applicability. Respond to customer request regarding faultlevel data under NGCP area of responsibility (AOR).
- Assessment of submitted upgrading/changes on Luzon grid/feeder systemconfiguration.
- Maintenance and standardization of ASPEN Oneliner basecase to reflectlatest Grid configuration.
- Preparation of the semi-annual fault level simulation/issuance for NGCPowned Luzon Grid substation buses.
- Prepare fault level issuance at connection point as per customer request.
- Responsibility6:PREPARATION OF ANNUAL AGOMA AND IAP REPORTING
- Report onprojected significant changes on Luzon Grid fault level data due to incomingnew projects, substation upgrading, various customer connections and others.Monitor and report affected equipment rating particularly the installed powercircuit breakers.
- Fault level assessment on scheduled NGCP projects provided by Transmission Planning Department (TDP).
- Fault level assessment on incoming power plant connections provided by DOE.
- Prepare ASPEN Oneliner model reflecting the future changes on Gridconfiguration.
- Conduct short circuit simulation to compare present fault level againstprojected fault level and determine the significant increase and decrease inmagnitude per NGCP substation buses.
- Identify underrated circuit breakers due to significant increase in faultlevel and provide necessary grid reconfiguration option to lessen respectivefault level.
- Preparation of AGOMA presentation materials.
- Finalization of the AGOMA reporting.
- Responsibility7: INFORMATION SECURITY, SAFETY AND QUALITY MANAGEMENT
- Ensure thatactivities are fully compliant with NGCP information security, safety andquality standards.
- Complies withapplicable regulations and NGCP standards on information security, safety andquality.
- Strives for thecontinuous improvement of NGCP processes necessary for the achievement ofcorporate objectives.
- Upholds corporatepolicies and guidelines.
- Responsibility8: OTHERS
- Other tasksassigned.
- Represents theUnit Head, on conferences and meeting with other functional groups and otheragencies concerning power system protection and assists in the generaladministration of the division.
- Act asOfficer-in-Charge in the absence of the Unit Head.
- Resource Speakeron conferences and seminars regarding protection system.
- Participate inthe conduct of System Disturbance Analysis.
- Preparation ofpresentation materials regarding protection assessment, setting coordinationand other topics related to power system.
- Participate inproduct presentation and customer energization workshop.
- Participate incommissioning activities.
- Perform fieldrelay retrieval in support to system disturbance analysis.
- On-sitedownloading of relay parameter.
- Performs other duties related to powersystem engineering.
Requirements:
- Bachelor of Science inElectrical Engineering (BSEE)
- Registered ElectricalEngineer (RA 1080) with valid/updated PRC license
- Four (4) years ofexperience in power system engineering
- Able to write and speakin English and Filipino
- Normal workingcondition with occasional field work
- Knowledgeable incomputer, Test equipment, Protection Relay and Mathcad calculation software
- Expertise in AspenOneliner short circuit simulation software