FILINVEST COMPANY:Filinvest Development Corporation Utilities Inc. (FDCUI)
WORKING SCHEDULE:MONDAY-FRIDAY (8:00A AM - 5:00 PM)
OFFICE LOCATION:MAKATI CITY
EMPLOYMENT TYPE:PROBATIONARY
JOB SUMMARY:
To provide technical assistance to ETS team in day-to-day activities. To perform various Front-End-Engineering assignments requiring the application of basic principles and fundamental theories in the power industry practices related to mechanical engineering discipline. Prepare technical documents like but not limited to drawings, plans, reports, schedule, bid documents and other documents as required per project basis.
- Prepare Bid Document (Non-Disclosure Agreement, ITB-Instruction to Bidders, Bid Data Sheet, Engineering Specifications, Drawings, Bill of Quantities, Basis of Design, Minimum Functional Specifications, Eligibility Documents, General Conditions of Contract, Special Conditions of the Contract, Bidders Qualification Information and other Forms as required).
- Assist in evaluating technical qualifications of the bidders like but not limited to single largest completed contact, ongoing contracts, technical expertise, compliance.
- Conduct review and provide comments on the submitted documents involving civil works, structural drawings, geotechnical reports, structural calculations, construction methodology, and testing procedures.
- Coordinates within ETS multi engineering discipline (mechanical, electrical, Instrument and Control), EPC contractor, Owner Engineers, Lender Engineers, on site project team and any other stakeholders involve.
- Conduct reviews and provide comments on civil works drawings, structural drawings, civil design descriptions, site layouts, and other related documents.
- Actively participate in daily huddle meetings, weekly design meeting and other meetings as needed. Provide an update and minutes of meeting as required.
- Monitor and updates the existing trackers related to design and engineering.
- As needed, conduct site inspections and ensure civil/structural works (foundations, structures, roads, drainage, retaining walls, earthworks) comply with design specifications and quality standards.
- Raise RFI (Request for Information), SOR (Site Observation Report) and if necessary, NCR’s if supplied materials, civil works, or activities are non-compliant or installations/construction are unsatisfactory and not meet the design requirements.