Senior C++ Embedded Engineer – Real-Time, Impactful Systems

Black.ai

Auckland

On-site

NZD 120,000 - 180,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Salary package
Health insurance
Self-development budget
Parental leave
Wellness leave
Unlimited leave

Job summary

Halter in Auckland is seeking a firmware engineer to own guidance firmware and the virtual fencing logic for cattle collars. You’ll design, implement, and test end-to-end in a live fleet across farms and continents.

You’ll work with embedded developers, backend and frontend teams; enjoy challenging constraints, real-time performance, and ownership from design to production, with a culture that values experimentation and impact.

Qualifications

  • Strong C++ fundamentals and software design patterns.
  • Comfort with tight constraints: concurrency, limited memory and stack, real-time behaviour.
  • Good judgement under uncertainty and unclear requirements.
  • Enjoy reasoning about geometry, probability and timing for path planning.
  • Strong sense of ownership and end-to-end problem solving.
  • Give and receive feedback well, as a strong team player.

Responsibilities

  • Own the guidance firmware and virtual fencing logic for cattle collars.
  • Design guidance algorithms, state machines and geometry for virtual fences.
  • Develop protocols to move data onto the collar and back via low-bandwidth radio.
  • Build all in modern C++ (C++23) on FreeRTOS with power/memory constraints.
  • Debug hard field-only problems using logs and telemetry.
  • Collaborate with firmware, backend, frontend, designers and animal experts.
  • Mentor other engineers and contribute to design conversations.

Skills

C++ fundamentals
Concurrency
Real-time systems
Geometry & timing
Ownership & debugging
Team player

Tools

FreeRTOS
C++23

Job description

Halter in Auckland is seeking a firmware engineer to own guidance firmware and the virtual fencing logic for cattle collars. You’ll design, implement, and test end-to-end in a live fleet across farms and continents.

You’ll work with embedded developers, backend and frontend teams; enjoy challenging constraints, real-time performance, and ownership from design to production, with a culture that values experimentation and impact.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Embedded C++ Engineer — Real-Time Animal Guidance
Senior Embedded C++ Engineer — Real-Time Animal Guidance

Halter • Auckland

On-site
NZD 140,000 - 190,000
Wellness leave & unlimited annual
Self-development budget
Employee stock ownership plan
+3
Senior Firmware Engineer — End-to-End Embedded & LoRa
Senior Firmware Engineer — End-to-End Embedded & LoRa

Halter • Auckland

On-site
NZD 120,000 - 180,000
Snacks and drinks
Health insurance
Parental leave
+3
Senior Backend Engineer - Real-Time, Scalable AWS Systems
Senior Backend Engineer - Real-Time, Scalable AWS Systems

Halter • Auckland

On-site
NZD 120,000 - 180,000
Snacks and drinks
Health insurance
Parental leave
+3
Electronics Engineer — Wearable Animal Tech (End-to-End HW)
Electronics Engineer — Wearable Animal Tech (End-to-End HW)

Halter • Auckland

On-site
NZD 70,000 - 110,000
Senior Backend Engineer — Real-Time Systems on AWS
Senior Backend Engineer — Real-Time Systems on AWS

Halter • Auckland

On-site
NZD 140,000 - 190,000
Snacks & drinks
Health insurance
Parental leave
+3
Product-Driven Software Engineer for On-Farm Systems
Product-Driven Software Engineer for On-Farm Systems

Halter • Auckland

On-site
NZD 120,000 - 180,000
Salary and equity package
Southern Cross Health Insurance
Self-development budget
+3
Senior Application Security Engineer: Lead Secure, Scalable Systems
Senior Application Security Engineer: Lead Secure, Scalable Systems

Halter • Auckland

On-site
NZD 140,000 - 200,000
Unlimited leave
Wellness days
Personal growth budget
+3
Senior Firmware Engineer
Senior Firmware Engineer

Halter • Auckland

On-site
NZD 120,000 - 180,000
Snacks and drinks
Health insurance
Parental leave
+3
Senior Mechanical Engineer Real-World Livestock Hardware
Senior Mechanical Engineer Real-World Livestock Hardware

Gallagher Animal Management • Hamilton

On-site
NZD 120,000 - 160,000
Competitive salary and incentive
Free parking
On-site café
+4
Electronics Engineer
Electronics Engineer

Halter • Auckland

On-site
NZD 70,000 - 110,000
Top locations