Commissioning Manager (Data Centre Construction) | Clear | Amsterdam

Tech Junction Ltd

Amsterdam

Hybrid

EUR 110.000 - 150.000

Vollzeit

Vor 2 Tagen
Sei unter den ersten Bewerbenden

Erhalte eine Antwort von diesem Arbeitgeber

Dein Lebenslauf und dein Anschreiben, genau auf das zugeschnitten, was gesucht wird.

Schaffe es an den ATS-Filtern vorbei

Benefits dieser Stelle

Rotation package
Working-away allowance
Flights included
Accommodation

Zusammenfassung

Clear is seeking a Commissioning Manager in Amsterdam to lead end-to-end commissioning for hyperscale data centres. You will drive strategy, script development, IST, and deficiency tracking on-site, coordinating multiple disciplines and vendors to ensure flawless handover.

Ideal candidates bring 8+ years in mission-critical commissioning, strong IST leadership, and deep BMS/EPMS experience, with an EU passport and willingness to rotate on-site in Amsterdam.

Qualifikationen

  • Bachelor’s degree in Electrical/Mechanical or Building Services.
  • 8+ years in testing and commissioning data centres or complex facilities.
  • Experience with Level 1-5 commissioning (UPS, gensets, chillers, CRAC/CRAH).
  • Knowledge of Uptime Institute tiers and ASHRAE guidelines.
  • Experience leading IST and deficiency tracking.
  • Strong BMS/EPMS understanding and control logic.
  • Excellent leadership and stakeholder communication.
  • EU passport and on-site availability in Amsterdam

Aufgaben

  • Direct and oversee commissioning lifecycle (Levels 1-5) for electrical, mechanical, and control systems.
  • Develop and approve commissioning scripts, SOPs, and IST protocols.
  • Lead IST, black-start, load-bank, and thermal tests.
  • Coordinate third-party agents, equipment manufacturers, and contractors.
  • Log and resolve snags and defects before handover.
  • Ensure compliance with ASHRAE, Uptime Institute, and local codes.
  • Collaborate with construction, design, operations, and client reps.
  • Maintain commissioning documentation and handover packages.

Kenntnisse

Electrical Eng
Mechanical Eng
IST leadership
BMS knowledge
Deficiency tracking
ASHRAE standards
Uptime Institute
Project leadership
Stakeholder comms

Ausbildung

BSc Electrical Eng
Building Services

Tools

Jira
Confluence
BMS/EPMS

Jobbeschreibung

Position Summary: Driving advanced facility commissioning, integrated testing, and operational handover for hyperscale data centres in Amsterdam, Clear is actively seeking an accomplished Commissioning Manager for a permanent professional engagement. In this vital technical leadership role, you will take full operational, tactical, and technical ownership of the end-to-end commissioning lifecycle (Levels 1 through 5), ensuring uncompromised system reliability, thermal performance, and electrical resilience across critical infrastructure. Bringing extensive hands-on experience in mission-critical data centre commissioning, you will empower global engineering teams to achieve flawless integrated systems testing and seamless facility handover. This prestigious career opportunity offers competitive remuneration, rotation packages including working-away allowances, accommodation, and flights, alongside professional growth within a premier international executive recruitment and consulting enterprise.

Detailed Job Description:

As a Commissioning Manager supporting Clear on an on-site basis in Amsterdam, Netherlands, you will take full operational, tactical, and technical ownership of commissioning strategy, test script development, integrated systems testing (IST), and deficiency tracking. Your day-to-day responsibilities include leading multidisciplinary commissioning teams through electrical, mechanical, and automation testing phases, coordinating vendor representatives, resolving complex functional anomalies, collaborating with electrical and mechanical construction managers, and interacting directly with professional delivery consultants like Amelia Burrows.

Key Responsibilities:
  • Direct, manage, and oversee the complete commissioning lifecycle (Levels 1-5) for hyperscale data centre electrical, mechanical, and control systems.
  • Author, review, and approve comprehensive commissioning scripts, method statements, Standard Operating Procedures (SOPs), and IST protocols.
  • Lead Integrated Systems Testing (IST), simulated black-start testing, generator load-bank testing, and mechanical thermal load tests.
  • Coordinate onsite activities for third-party commissioning agents, equipment manufacturers, electrical contractors, and mechanical vendors.
  • Identify, log, track, and resolve commissioning snags, punch-list items, and operational deficiencies prior to client handover.
  • Ensure strict adherence to ASHRAE standards, Uptime Institute tier requirements, and local safety and environmental codes.
  • Collaborate seamlessly with construction managers, design engineers, operations teams, and client technical representatives.
  • Maintain meticulous commissioning documentation, test result sign-offs, calibration logs, and final handover certification packages.
Required Qualifications & Skills:
  • Bachelor’s degree in Electrical Engineering, Mechanical Engineering, Building Services, or related technical discipline.
  • Minimum of 8+ years of progressive professional hands-on experience in testing and commissioning mission-critical data centres or complex industrial facilities.
  • Strong, demonstrable operational expertise in Level 1 through Level 5 commissioning processes for electrical (UPS, generators, switchgear) and mechanical (chillers, CRAC/CRAH) systems.
  • Comprehensive working knowledge of Uptime Institute tier classification standards and ASHRAE testing guidelines.
  • Deep practical experience in leading Integrated Systems Testing (IST) and managing complex deficiency tracking logs.
  • Solid practical grasp of building management systems (BMS), power monitoring systems (EPMS), and automated control logic.
  • Exceptional analytical problem-solving aptitude, leadership capabilities, and professional stakeholder communication skills.
  • Mandatory possession of a valid EU passport and physical availability for on-site rotation operations in Amsterdam, Netherlands.
Nice-to-Have Skills:
  • Professional commissioning certifications such as Certified Commissioning Authority (CxA) or Accredited Commissioning Process Manager (ACP-M).
  • Prior professional working experience in hyperscale data centre commissioning across Europe, North America, or Asia.
  • Hands-on familiarity with electrical power systems analysis software, thermal imaging, and vibration analysis tools.
  • Experience utilizing enterprise agile tracking platforms (Jira, Confluence) for deficiency tracking and project reporting.
  • Active participation in commissioning associations, IEEE societies, or critical facility operations think tanks.
Application Information:
  • Salary/Rate: Market Competitive Salary + Rotation Package (Working-away allowance, accommodation, and flights included)
  • Deadline: Open until filled (Urgent Amsterdam Data Centre Commissioning Manager Opening)
  • Notice Period: Immediate to 30 Days Preferred
  • Contract Duration: Permanent / Full-Time On-Site Rotation Engagement (Amsterdam, Netherlands)
  • Company Website: https://www.clear-er.com
  • Contact Name: Amelia Burrows (Delivery Consultant)
Recruitment Pro Tip:

When applying for this Commissioning Manager position through Clear, ensure your resume explicitly highlights your Level 1-5 commissioning portfolio, IST leadership record, and confirms your valid EU passport status.

Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

Electrical Construction Manager (Data Centre Construction) | Clear | Amsterdam
Electrical Construction Manager (Data Centre Construction) | Clear | Amsterdam

Tech Junction Ltd • Amsterdam

Hybrid
EUR 90.000 - 140.000
Rotation package
Working-away allowance
Accommodation
+1
Electrical Contracts Manager (Data Centre Construction) | Clear | Amsterdam
Electrical Contracts Manager (Data Centre Construction) | Clear | Amsterdam

Tech Junction Ltd • Amsterdam

Hybrid
EUR 90.000 - 130.000
Working-away allowance
Accommodation
Flights included
Mechanical Engineer (Data Centre Construction) | Clear | Amsterdam
Mechanical Engineer (Data Centre Construction) | Clear | Amsterdam

Tech Junction Ltd • Amsterdam

Hybrid
EUR 70.000 - 100.000
Working-away allowance
Accommodation
Flights included
Commissioning Manager
Commissioning Manager

Optimus Search Limited • Amsterdam

Vor Ort
EUR 120.000 - 185.000
EHS Advisor (Data Centre Construction) | Clear | Amsterdam
EHS Advisor (Data Centre Construction) | Clear | Amsterdam

Tech Junction Ltd • Amsterdam

Hybrid
EUR 70.000 - 95.000
Rotation package
Working-away allowance
Accommodation
+1
Commissioning Engineer - Data Centres across Europe
Commissioning Engineer - Data Centres across Europe

Progressive • Amsterdam

Vor Ort
EUR 65.000 - 90.000
CSA Engineer (Civil, Structural & Architectural) | Clear | Amsterdam
CSA Engineer (Civil, Structural & Architectural) | Clear | Amsterdam

Tech Junction Ltd • Amsterdam

Hybrid
EUR 90.000 - 130.000
Rotation benefits including working‑a​
Accommodation
Flights included
Commissioning Manager - AMS 1246
Commissioning Manager - AMS 1246

Winthrop Technologies Ltd. • Amsterdam

Vor Ort
EUR 90.000 - 130.000
Market leader in data centre delivery
Forward-thinking team
Career progression opportunities
+1
Data Centre Commissioning Manager - IST Lead, EU Rotation
Data Centre Commissioning Manager - IST Lead, EU Rotation

Tech Junction Ltd • Amsterdam

Hybrid
EUR 110.000 - 150.000
Rotation package
Working-away allowance
Flights included
+1
Program Manager (Commissioning and Quality)
Program Manager (Commissioning and Quality)

GerTEK Project Management and Technical Services • Amsterdam

Vor Ort
EUR 70.000 - 90.000