A complete application in a minute
Tailored resume and cover letter, ready to send.
Hammer Engineering Sdn Bhd seeks a Project Engineer to support the Project Manager in executing fuel gas metering, PRMS and fuel gas conditioning packages from contract award through engineering, procurement, fabrication, FAT, installation, commissioning and handover.
The role owns day-to-day engineering, document, procurement and site coordination on assigned projects, ensuring safety, specification, schedule and budget adherence.
The Project Engineer supports the Project Manager in executing fuel gas metering, pressure reduction & metering station (PRMS) and fuel gas train / conditioning packages, from contract award through engineering, procurement, fabrication, FAT, installation, commissioning and handover. The role owns the day-to-day engineering, document, procurement and site coordination work on assigned projects, so that each package is delivered safely, to specification, on schedule and within budget.
DUTIES & RESPONSIBILITIES OF THIS ROLE
A. Project Execution Support
1. Support the Project Manager in day-to-day execution of assigned projects, and take ownership of defined work packages (e.g. a skid, a metering run, a procurement package or a site activity) from start to finish.
2. Prepare and update the detailed project schedule (Primavera P6 / MS Project), 2–3 week look-ahead plans and progress S-curves, and flag slippage to the Project Manager early.
3. Coordinate daily with the in-house engineering, fabrication, QA/QC, procurement and site teams, and with the client, consultants, gas transporter / utility, vendors, sub-contractors and local authorities.
4. Prepare project deliverables to client requirements, including progress reports, minutes of meeting, technical queries (TQs), deviation requests, transmittals and the MDR / VDRL status register.
B. Engineering & Technical Deliverables – Fuel Gas Metering & Fuel Gas Train
5. Prepare or check engineering documents, including P&IDs, GA and isometric drawings, equipment and instrument data sheets, line / valve / instrument lists, cause & effect charts and bills of materials, working with the design engineers.
6. Perform or verify sizing calculations under the Project Manager’s review: meter sizing and run lengths, pressure regulator and control valve sizing (Cv), relief valve sizing, filter / separator sizing, Joule-Thomson cooling and heater duty, and line velocity / noise checks.
7. Specify and review equipment for the fuel gas train: inlet ESD / isolation valves, filter-separators, gas heaters, pressure regulators (active / monitor), slam-shut and creep relief valves, pressure safety valves, double block-and-bleed valves, and pressure / temperature transmitters.
8. Specify and review metering system equipment: ultrasonic, Coriolis, turbine, rotary or orifice meters, flow computers, gas chromatographs, moisture / H2S / dew point analysers and sampling systems, and their SCADA