Mechanical Project Managers - Data Centre Construction - PMC - Johor Bahru

AG STAFFING

Johor Bahru

On-site

MYR 180,000 - 240,000

Full time

5 days ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

Jora Malaysia is seeking Mechanical Project Managers for Data Centre Construction in Johor Bahru to lead cooling infrastructure projects. You will oversee the installation of large-scale chilled water systems and assist in the deployment of advanced cooling topologies for high-density AI clusters.

The role requires coordinating piping networks, containment, gas suppression systems per BOMBA requirements, and the setup of ventilation and backup generator fuel supply networks.

Qualifications

  • Experience leading mechanical systems for large facilities.
  • Strong knowledge of cooling infrastructure and project delivery.
  • Familiarity with safety standards and compliance.

Responsibilities

  • Oversee the installation of large-scale chilled water systems and related cooling equipment.
  • Lead deployment of advanced cooling topologies for high-density data centres.
  • Manage piping networks, valve matrices and containment for critical infrastructure.
  • Coordinate gas suppression systems and fire safety integration per regulations.
  • supervise ventilation and fuel oil supply/storage networks for backup generators.

Job description

Jora Malaysia will close on 9th September 2026. Thank you for being with us, we are cheering you on as you continue your career journey.

Mechanical Project Managers - Data Centre Construction - PMC - Johor Bahru

Mechanical Project Managers - Data Centre Construction - PMC - Johor Bahru

Key Responsibilities

1. Cooling Infrastructure & Technical Execution

  • System Delivery: Oversee the installation of large-scale chilled water systems, including high-efficiency centrifugal chillers, cooling towers, Computer Room Air Handlers (CRAHs), and Computer Room Air Conditioning (CRAC) units.
  • Liquid Cooling Transition: Drive the deployment of advanced cooling topologies for high-density AI clusters, including Direct-to-Chip (Direct-to-CHip / Liquid-to-Water) cooling, rear-door heat exchangers, and Coolant Distribution Units (CDUs).
  • Piping & Containment: Manage the fabrication and installation of heavy-duty condenser and chilled water piping networks, valve matrices, and secondary containment loops.
  • BOMBA Integration: Lead the deployment of mission-critical gas suppression systems (e.g., Inergen, FM200, Novec 1230) and Pre-Action dry-pipe sprinkler systems, ensuring strict alignment with BOMBA requirements.
  • Ventilation & Smoke Extraction: Supervise the installation of pressurization fans, smoke spill systems, and fuel oil supply/storage networks for backup diesel generators.

Job Types: Full-time, Contract

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Data Centre Mechanical PM: Liquid Cooling Systems
Data Centre Mechanical PM: Liquid Cooling Systems

AG STAFFING • Johor Bahru

On-site
MYR 180,000 - 240,000
Project Manager (Data Center, HVAC) | Johor Bahru
Project Manager (Data Center, HVAC) | Johor Bahru

Michael Page • Johor Bahru

On-site
MYR 120,000 - 180,000
Transport allowance
Good work-life balance
Project Engineer (Data Center, HVAC) | Johor Bahru
Project Engineer (Data Center, HVAC) | Johor Bahru

Michael Page • Johor Bahru

On-site
MYR 60,000 - 90,000
Project Coordinator (Cooling Plant)
Project Coordinator (Cooling Plant)

Speedy Global Solutions Sdn Bhd • Kuala Lumpur

On-site
MYR 67,000 - 112,000
Medical insurance
Performance-based bonuses
Career progression
Data Centre Project Engineer
Data Centre Project Engineer

Neuron Solutions Sdn. Bhd. • Johor Bahru

On-site
MYR 67,000 - 134,000
Project Manager (Data Center) | Contract
Project Manager (Data Center) | Contract

AirSWIFT • Johor Bahru

On-site
MYR 240,000 - 540,000
Asst Manager, Mechanical Design | Data Centre | Cyberjaya
Asst Manager, Mechanical Design | Data Centre | Cyberjaya

Anchor • Cyberjaya

On-site
MYR 90,000 - 140,000
Mechanical Engineer
Mechanical Engineer

PMX Malaysia Sdn Bhd • Cyberjaya

On-site
MYR 78,000 - 112,000
Data Centre Project Engineer
Data Centre Project Engineer

Neuron Solutions Sdn. Bhd. • Kulai

On-site
MYR 60,000 - 120,000
Mechanical Engineer - Data Centre Construction (Johor)
Mechanical Engineer - Data Centre Construction (Johor)

PMX Malaysia Sdn Bhd • Johor Bahru

On-site
MYR 70,000 - 100,000