Electrical Engineers (Data Centre Construction) JB

AG STAFFING

Pasir Gudang

On-site

MYR 60,000 - 100,000

Full time

4 days ago
Be an early applicant
Application generator

Stand out for this role — generate a tailored resume and cover letter in about a minute.

Get past ATS filters

Job summary

AG STAFFING seeks Electrical Engineers (Data Centre Construction) in Johor Bahru to own and manage the data centre power infrastructure from HT utility connections to server racks, ensuring continuous, redundant power distribution.

You will supervise HT/MV/LV switchgear installations, transformers, diesel generators, UPS, and PDUs, and lead site testing, including insulation tests, relay calibration, and load bank tests, while liaising with utility providers and regulators to energize and

Qualifications

  • Experience supervising electrical installations for data centres or similar facilities.
  • Ability to coordinate with utility providers and regulators.
  • Strong focus on safety and adherence to local codes.

Responsibilities

  • Power Infrastructure Build: Supervise the installation of HT/MV/LV switchgears, transformers, diesel generators, UPS systems, and Power Distribution Units (PDUs).
  • Testing Oversight: Lead the site testing for electrical systems, including insulation testing, protection relay calibration, and load bank testing.
  • Authority Liaison: Coordinate with local utility providers (like TNB) and regulatory bodies for testing, energization, and permanent power connection.
  • Safety & Compliance: Ensure all electrical installations comply with local safety standards, electrical grid codes, and site health guidelines.

Skills

Power infrastructure
HT/MV/LV switchgear
Electrical testing
Regulatory liaison
Safety compliance

Job description

Jora Malaysia will close on 16th September 2026. Thank you for being with us, we are cheering you on as you continue your career journey.

Electrical Engineers (Data Centre Construction) JB

The Electrical Engineer owns the power infrastructure of the data centre. This role manages everything from the high-voltage utility connection down to the server racks, ensuring continuous, redundant power distribution.

Key Responsibilities
  • Power Infrastructure Build: Supervise the installation of HT/MV/LV switchgears, transformers, diesel generators, UPS systems, and Power Distribution Units (PDUs).
  • Testing Oversight: Lead the site testing for electrical systems, including insulation testing, protection relay calibration, and load bank testing.
  • Authority Liaison: Coordinate with local utility providers (like TNB) and regulatory bodies for testing, energization, and permanent power connection.
  • Safety & Compliance: Ensure all electrical installations comply with local safety standards, electrical grid codes, and site health guidelines.
Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Critical Facilities Electrical Engineer (Data Centre) - Johor Bahru
Critical Facilities Electrical Engineer (Data Centre) - Johor Bahru

Neuron Solutions Sdn. Bhd. • Johor Bahru

On-site
MYR 90,000 - 135,000
Electrical Project Managers (Data Centre Construction) - PMC - JB
Electrical Project Managers (Data Centre Construction) - PMC - JB

AG STAFFING • Johor Bahru

On-site
MYR 120,000 - 160,000
Engineer (Mechanical & Electrical)
Engineer (Mechanical & Electrical)

Kerjaya Prospek Group • Iskandar Puteri

On-site
MYR 89,000 - 134,000
TECHNICAL MANAGER (ELECTRICAL)
TECHNICAL MANAGER (ELECTRICAL)

IJM Corporation Berhad • Selangor

On-site
MYR 60,000 - 100,000
Electrical Engineer
Electrical Engineer

PXB Engineering Sdn Bhd • Shah Alam

On-site
MYR 245,000 - 367,000
Data Centre Electrical Engineer: Power & Infrastructure
Data Centre Electrical Engineer: Power & Infrastructure

AG STAFFING • Pasir Gudang

On-site
MYR 60,000 - 100,000
Data Centre Electrical PM — HV Power & IT Cooling Lead
Data Centre Electrical PM — HV Power & IT Cooling Lead

AG STAFFING • Johor Bahru

On-site
MYR 120,000 - 160,000
Shift Lead Engineer (Data Center)
Shift Lead Engineer (Data Center)

Neuron Solutions Sdn. Bhd. • Kulai

On-site
MYR 60,000 - 100,000
SME (Electrical / Mechanical Engineer)
SME (Electrical / Mechanical Engineer)

YTL DC SOUTH SDN. BHD. • Kulai

On-site
MYR 90,000 - 140,000
Electrical Technician
Electrical Technician

TWY Search International • Bandar Baru Bangi

On-site
MYR 28,000 - 47,000