Sr. Master Planner

Jabil

Región Centro

Presencial

MXN 600.000 - 900.000

Jornada completa

Hace 2 días
Sé de los primeros/as/es en solicitar esta vacante

Recibe más respuestas de empleadores

Envía un currículum específico para el puesto de trabajo en cuestión de minutos.

Descripción de la vacante

Jabil in Mexico seeks a Master Planner to manage all planning activities for the dedicated workcell and mentor the Production Planners and Document Coordinators in the workcell. This role develops the Master Production Schedule, ensures 95% on-time delivery, maintains BOMs and routings, and drives capacity and material planning in alignment with customer demand and contract terms.

The ideal candidate has 8+ years in planning, APICS certification, and a strong ability to optimize changeovers and

Formación

  • Advanced PC skills and knowledge of company software packages.
  • Ability to read safety rules, operating and maintenance instructions, and procedures.
  • APICS certification is preferred.
  • Bachelor’s degree and HS diploma are required; supervisor experience preferred.

Responsabilidades

  • Ensure 100% on-time delivery and build readiness.
  • Develop Master Production Schedule (MPS) and load into ERP with PO coverage.
  • Reconcile MPS to customer PO coverage weekly.
  • Maintain BOMs and routings for accurate tracking of WIP and inventory movement.
  • Lead capacity planning and communicate constraints to workcell and customer.
  • Meet daily with workcell/manufacturing to optimize schedules and reduce changeovers.
  • Manage end-of-life planning and purge process with strict adherence to contracts.

Conocimientos

MRP knowledge
Capacity planning
ERP systems
Forecasting
Documentation

Educación

HS Diploma or equivalent
Bachelor’s degree
APICS certification
Supervisor experience

Descripción del empleo

Summary

Manage all planning activities for the dedicated assigned workcell and mentor the Production Planners and Document Coordinators in the workcell.

Responsibilities
  • Maintain efficiency of capacity and customer sizing.
  • Maintain accurate revenue forecasting.
  • Maintain material control and liability.
  • Develop Master Production Schedule (MPS) and load into Jabil’s ERP system, including Purchase Order (PO) coverage.
  • Reconcile the MPS to customer PO coverage weekly to ensure that Jabil is not exposed over and above customer PO coverage or other authorized customer demand.
  • Ensure the MPS is always 100% accurate and achievable.
  • Achieve and maintain 95% MPS goal.
  • Own production planning, BOM and document control with or without additional support.
  • Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand.
  • Maintain the workcell’s capacity planning model; drive resolution on uneven capacity utilization that keeps Jabil focused on the customer but efficiently utilizing manufacturing resources.
  • Meet daily with the Workcell and manufacturing team to assess production schedules, (adjust as necessary based on production results) optimize run quantities, and minimize changeovers to help achieve 100% on time delivery.
  • Maintain the customers’ latest contract on file at all times and be familiar with the terms and conditions of the contract regarding customer liability of material planning and production scheduling. This includes the liability window for Jabil material purchase order placement, purchase price for components, and liability for any in-house materials (purchased and manufactured).
  • Be the workcell’s “expert” on all planning activities by supporting the Production Planner goal of never starting to build product without having a valid PO, adequate material quantities, and accurate BOM and an accurate routing.
  • Lead the Workcell on the creation of Bills of Material (BOMs) and routings that allows accurate tracking of WIP assemblies and accurate inventory movement transactions.
  • End-of Life (EOL) management should include chairing a meeting 30 days prior to the last planned build date to create tactics to support the EOL strategy. The Master Planner would own the build schedule, corrections and resolution of MPS to customer demand, planned tactics on deadlines for assemblies out of the various work areas on the floor, deadline for last shipment, and support plan for potential RMAs.
  • Manage Jabil purge process for internal Workcell purges.
  • Adhere to all safety and health rules and regulations associated with this position and as directed by supervisor.
  • Comply and follow all procedures within the company security policy.
Essential Duties And Responsibilities
  • Ensure 100% on-time delivery.
  • Establish build readiness.
  • Maintain efficiency of capacity and customer sizing.
  • Maintain accurate revenue forecasting.
  • Maintain material control and liability.
  • Develop Master Production Schedule (MPS) and load into Jabil’s ERP system, including Purchase Order (PO) coverage.
  • Reconcile the MPS to customer PO coverage weekly to ensure that Jabil is not exposed over and above customer PO coverage or other authorized customer demand.
  • Ensure the MPS is always 100% accurate and achievable.Achieve and maintain 95% MPS goal.
  • Own production planning, BOM and document control with or without additional support.
  • Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand.
  • Maintain the workcell’s capacity planning model; drive resolution on uneven capacity utilization that keeps Jabil focused on the customer but efficiently utilizing manufacturing resources.
  • Meet daily with the Workcell and manufacturing team to assess production schedules, (adjust as necessary based on production results) optimize run quantities, and minimize changeovers to help achieve 100% on time delivery.
  • Maintain the customers’ latest contract on file at all times and be familiar with the terms and conditions of the contract regarding customer liability of material planning and production scheduling. This includes the liability window for Jabil material purchase order placement, purchase price for components, and liability for any in-house materials (purchased and manufactured).
  • Be the workcell’s “expert” on all planning activities by supporting the Production Planner goal of never starting to build product without having a valid PO, adequate material quantities, and accurate BOM and an accurate routing.
  • Lead the Workcell on the creation of Bills of Material (BOMs) and routings that allows accurate tracking of WIP assemblies and accurate inventory movement transactions.
  • End-of Life (EOL) management should include chairing a meeting 30 days prior to the last planned build date to create tactics to support the EOL strategy. The Master Planner would own the build schedule, corrections and resolution of MPS to customer demand, planned tactics on deadlines for assemblies out of the various work areas on the floor, deadline for last shipment, and support plan for potential RMAs.
  • Manage Jabil purge process for internal Workcell purges.
  • Adhere to all safety and health rules and regulations associated with this position and as directed by supervisor.
  • Comply and follow all procedures within the company security policy.
Management & Supervisory Responsibilities
  • Typically reports to Management. Direct supervisor job title(s) typically include: Planning Manager
  • Job is NOT directly responsible for managing other employees (e.g., hiring/termination and/or pay decisions, performance management).
Job Qualifications

KNOWLEDGE REQUIREMENTS

  • Advanced PC skills, including training and knowledge of Jabil’s software packages. Ability to read and interpret documents such as safety rules, operating and maintenance instructions, and procedure manuals. Ability to write routine reports and correspondence. Ability to speak effectively before groups of customers or employees of organization.
  • Ability to add, subtract, multiply, and divide in all units of measure, using whole numbers, common fractions, and decimals. Ability to compute rate, ratio, and percent and to draw and interpret bar graphs.
  • Ability to solve practical problems and deal with a variety of concrete variables in situations where only limited standardization exists. Ability to interpret a variety of instructions furnished in written, oral, diagram, or schedule form.
Education & Experience Requirements
  • HS Diploma or equivalent required
  • Bachelor’s degree required
  • APICS certification and Supervisor experience also preferred
  • Thorough knowledge of MRP, lead times for specific component types, internal run rates, test development lead times, machine programming lead times and complete understanding of the chronological sequence of events that must occur in order to build a product.
  • Experience of 8 years in Planning Activities 1.5 years of them as Master Planner
  • Or an equivalent combination of education, training or experience.
Consigue la evaluación confidencial y gratuita de tu currículum.
o arrastra y suelta tu archivo aquí
Similar jobs

Puestos de trabajo similares que vale la pena comparar

Planning Supervisor
Planning Supervisor

Jabil • Chihuahua

Presencial
MXN 400.000 - 560.000
Planner I
Planner I

Jabil • Tijuana

Presencial
MXN 240.000 - 420.000
Planning Manager
Planning Manager

Plasticos Castella SA • Ciudad Juárez

Presencial
MXN 600.000 - 900.000
Master Planner: 100% On-Time Production & MPS
Master Planner: 100% On-Time Production & MPS

Jabil Malaysia • Chihuahua

Presencial
MXN 300.000 - 540.000
Sr Project Manager NPI
Sr Project Manager NPI

Jabil • Región Centro

Presencial
MXN 900.000 - 1.200.000
Buyer I
Buyer I

Jabil • Región Centro

Presencial
MXN 520.000 - 780.000
Business Unit PM
Business Unit PM

Jabil • Apodaca

Presencial
MXN 700.000 - 1.050.000
Buyer II
Buyer II

Jabil • Chihuahua

Presencial
MXN 300.000 - 550.000
Workcell Manager
Workcell Manager

Jabil • Chihuahua

Presencial
MXN 350.000 - 550.000
Master Scheduler & Planning Lead
Master Scheduler & Planning Lead

Jabil • Chihuahua

Presencial
MXN 400.000 - 560.000