Sr Master Planner

Jabil

Apodaca

On-site

MXN 420,000 - 700,000

Full time

7 hours ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Jabil in Mexico's Nuevo León region seeks an experienced Master Planner to manage all planning activities for a dedicated workcell and mentor Production Planners and Document Coordinators. You will develop MPS, maintain PO coverage, and ensure 95%+ on-time performance while optimizing capacity and material control.

You will own BOMs, routings, and EOL tasks, coordinating with manufacturing to meet customer demand and drive efficient use of resources.

Qualifications

  • HS Diploma or equivalent required.
  • Bachelor’s degree required.
  • APICS certification preferred.
  • Supervisor experience preferred.
  • Thorough knowledge of MRP, lead times, and planning processes.
  • 8 years in Planning Activities with 1.5 years as Master Planner.

Responsibilities

  • Ensure 100% on-time delivery.
  • Establish build readiness for the workcell.
  • Maintain capacity efficiency and forecast accuracy.
  • Develop MPS and load into ERP with PO coverage.
  • Reconcile MPS to PO coverage weekly.
  • Own production planning, BOM and document control.
  • Lead BOMs and routings for accurate WIP tracking.
  • Manage EOL planning 30 days before last build date.
  • Manage internal purge process for Workcells.
  • Follow safety, health and security procedures.

Skills

MRP knowledge
Production planning
Capacity planning
Data analysis
Forecasting

Education

HS Diploma or equivalent
Bachelor’s degree
APICS certification

Tools

ERP systems
Jabil software packages

Job description

Summary

Manage all planning activities for the dedicated assigned workcell and mentor the Production Planners and Document Coordinators in the workcell.

  • Maintain efficiency of capacity and customer sizing.
  • Maintain accurate revenue forecasting.
  • Maintain material control and liability.
  • Develop Master Production Schedule (MPS) and load into Jabil’s ERP system, including Purchase Order (PO) coverage.
  • Reconcile the MPS to customer PO coverage weekly to ensure that Jabil is not exposed over and above customer PO coverage or other authorized customer demand.
  • Ensure the MPS is always 100% accurate and achievable.
  • Achieve and maintain 95% MPS goal.
  • Own production planning, BOM and document control with or without additional support.
  • Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand.
  • Maintain the workcell’s capacity planning model; drive resolution on uneven capacity utilization that keeps Jabil focused on the customer but efficiently utilizing manufacturing resources.
  • Meet daily with the Workcell and manufacturing team to assess production schedules, (adjust as necessary based on production results) optimize run quantities, and minimize changeovers to help achieve 100% on time delivery.
  • Maintain the customers’ latest contract on file at all times and be familiar with the terms and conditions of the contract regarding customer liability of material planning and production scheduling. This includes the liability window for Jabil material purchase order placement, purchase price for components, and liability for any in-house materials (purchased and manufactured).
  • Be the workcell’s “expert” on all planning activities by supporting the Production Planner goal of never starting to build product without having a valid PO, adequate material quantities, and accurate BOM and an accurate routing.
  • Lead the Workcell on the creation of Bills of Material (BOMs) and routings that allows accurate tracking of WIP assemblies and accurate inventory movement transactions.
  • End-of Life (EOL) management should include chairing a meeting 30 days prior to the last planned build date to create tactics to support the EOL strategy. The Master Planner would own the build schedule, corrections and resolution of MPS to customer demand, planned tactics on deadlines for assemblies out of the various work areas on the floor, deadline for last shipment, and support plan for potential RMAs.
  • Manage Jabil purge process for internal Workcell purges.
  • Adhere to all safety and health rules and regulations associated with this position and as directed by supervisor.
  • Comply and follow all procedures within the company security policy.
Summary

Manage all planning activities for the dedicated assigned workcell and mentor the Production Planners and Document Coordinators in the workcell.

  • Maintain efficiency of capacity and customer sizing.
  • Maintain accurate revenue forecasting.
  • Maintain material control and liability.
  • Develop Master Production Schedule (MPS) and load into Jabil’s ERP system, including Purchase Order (PO) coverage.
  • Reconcile the MPS to customer PO coverage weekly to ensure that Jabil is not exposed over and above customer PO coverage or other authorized customer demand.
  • Ensure the MPS is always 100% accurate and achievable.
  • Achieve and maintain 95% MPS goal.
  • Own production planning, BOM and document control with or without additional support.
  • Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand.
  • Maintain the workcell’s capacity planning model; drive resolution on uneven capacity utilization that keeps Jabil focused on the customer but efficiently utilizing manufacturing resources.
  • Meet daily with the Workcell and manufacturing team to assess production schedules, (adjust as necessary based on production results) optimize run quantities, and minimize changeovers to help achieve 100% on time delivery.
  • Maintain the customers’ latest contract on file at all times and be familiar with the terms and conditions of the contract regarding customer liability of material planning and production scheduling. This includes the liability window for Jabil material purchase order placement, purchase price for components, and liability for any in‑house materials (purchased and manufactured).
  • Be the workcell’s “expert” on all planning activities by supporting the Production Planner goal of never starting to build product without having a valid PO, adequate material quantities, and accurate BOM and an accurate routing.
  • Lead the Workcell on the creation of Bills of Material (BOMs) and routings that allows accurate tracking of WIP assemblies and accurate inventory movement transactions.
  • End-of Life (EOL) management should include chairing a meeting 30 days prior to the last planned build date to create tactics to support the EOL strategy. The Master Planner would own the build schedule, corrections and resolution of MPS to customer demand, planned tactics on deadlines for assemblies out of the various work areas on the floor, deadline for last shipment, and support plan for potential RMAs.
  • Manage Jabil purge process for internal Workcell purges.
  • Adhere to all safety and health rules and regulations associated with this position and as directed by supervisor.
  • Comply and follow all procedures within the company security policy.
Essential Duties and Responsibilities
  • Ensure 100% on-time delivery.
  • Establish build readiness.
  • Maintain efficiency of capacity and customer sizing.
  • Maintain accurate revenue forecasting.
  • Maintain material control and liability.
  • Develop Master Production Schedule (MPS) and load into Jabil’s ERP system, including Purchase Order (PO) coverage.
  • Reconcile the MPS to customer PO coverage weekly to ensure that Jabil is not exposed over and above customer PO coverage or other authorized customer demand.
  • Ensure the MPS is always 100% accurate and achievable.
  • Achieve and maintain 95% MPS goal.
  • Own production planning, BOM and document control with or without additional support.
  • Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand.
  • Maintain the workcell’s capacity planning model; drive resolution on uneven capacity utilization that keeps Jabil focused on the customer but efficiently utilizing manufacturing resources.
  • Meet daily with the Workcell and manufacturing team to assess production schedules, (adjust as necessary based on production results) optimize run quantities, and minimize changeovers to help achieve 100% on time delivery.
  • Maintain the customers’ latest contract on file at all times and be familiar with the terms and conditions of the contract regarding customer liability of material planning and production scheduling. This includes the liability window for Jabil material purchase order placement, purchase price for components, and liability for any in‑house materials (purchased and manufactured).
  • Be the workcell’s “expert” on all planning activities by supporting the Production Planner goal of never starting to build product without having a valid PO, adequate material quantities, and accurate BOM and an accurate routing.
  • Lead the Workcell on the creation of Bills of Material (BOMs) and routings that allows accurate tracking of WIP assemblies and accurate inventory movement transactions.
  • End‑of‑Life (EOL) management should include chairing a meeting 30 days prior to the last planned build date to create tactics to support the EOL strategy. The Master Planner would own the build schedule, corrections and resolution of MPS to customer demand, planned tactics on deadlines for assemblies out of the various work areas on the floor, deadline for last shipment, and support plan for potential RMAs.
  • Manage Jabil purge process for internal Workcell purges.
  • Adhere to all safety and health rules and regulations associated with this position and as directed by supervisor.
  • Comply and follow all procedures within the company security policy.
Management & Supervisory Responsibilities
  • Typically reports to Management. Direct supervisor job title(s) typically include: Planning Manager
  • Job is NOT directly responsible for managing other employees (e.g., hiring/termination and/or pay decisions, performance management).
Job Qualifications

KNOWLEDGE REQUIREMENTS

  • Advanced PC skills, including training and knowledge of Jabil’s software packages. Ability to read and interpret documents such as safety rules, operating and maintenance instructions, and procedure manuals. Ability to write routine reports and correspondence. Ability to speak effectively before groups of customers or employees of organization.
  • Ability to add, subtract, multiply, and divide in all units of measure, using whole numbers, common fractions, and decimals. Ability to compute rate, ratio, and percent and to draw and interpret bar graphs.
  • Ability to solve practical problems and deal with a variety of concrete variables in situations where only limited standardization exists. Ability to interpret a variety of instructions furnished in written, oral, diagram, or schedule form.
Education & Experience Requirements
  • HS Diploma or equivalent required
  • Bachelor’s degree required
  • APICS certification and Supervisor experience also preferred
  • Thorough knowledge of MRP, lead times for specific component types, internal run rates, test development lead times, machine programming lead times and complete understanding of the chronological sequence of events that must occur in order to build a product.
  • Experience of 8 years in Planning Activities 1.5 years of them as Master Planner
  • Or an equivalent combination of education, training or experience.
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Master Planner
Master Planner

Jabil • Tijuana

On-site
MXN 600,000 - 900,000
Master Planner
Master Planner

Jabil • Apodaca

On-site
MXN 600,000 - 900,000
Master Planner
Master Planner

Jabil • Chihuahua

On-site
MXN 360,000 - 600,000
Sr Master Planner
Sr Master Planner

Jabil Monterrey S. de R.L. de C.V. • Monterrey

On-site
MXN 420,000 - 660,000
Sr MPS
Sr MPS

Jabil • Región Centro

On-site
MXN 600,000 - 800,000
Sr MPS
Sr MPS

Jabil • Guadalajara

On-site
MXN 550,000 - 900,000
Master Planner
Master Planner

Nypro DR • Monterrey

On-site
MXN 1,024,000 - 1,583,000
Planner II
Planner II

Jabil • Chihuahua

On-site
MXN 420,000 - 540,000
Production Scheduler
Production Scheduler

Jabil • Región Centro

On-site
MXN 300,000 - 420,000
Sr. Production Control
Sr. Production Control

Jabil • Región Centro

On-site
MXN 420,000 - 780,000