Master Schedule Planner

OmniOn Power

Matamoros

Presencial

MXN 480.000 - 720.000

Jornada completa

14 días+
Generador de candidaturas

Una candidatura completa en un minuto: currículum y carta de presentación adaptados, listos para enviar.

Supera los filtros ATS

Descripción de la vacante

OmniOn Power in Matamoros, Tamaulipas, Mexico, seeks a Master Production Scheduler to transform volatile demand into a feasible Ready-to-Run schedule. You will manage high‑mix BOMs, balance materials and capacity, and ensure 100% readiness before production, with about 20% on-site time.

You will lead the SAP 4.7 to S/4HANA Public Cloud transition, maintain scheduling logic in Power Query, and collaborate with Planning, Sourcing, Manufacturing, Quality and Engineering to improve Schedule

Formación

  • Bachelor’s degree in Engineering (Electromechanical, Industrial), Supply Chain, or Administration.
  • 3+ years in a high-volume manufacturing environment.
  • Technical English: Intermediate to advanced for global team coordination.
  • Strong experience in SAP ECC 4.7 or S/4HANA (MD04, COHV, COOIS, and Material Master maintenance).
  • RCCP capacity planning to manage shop floor bottlenecks.
  • Deep understanding of multi-level Bills of Materials in an electromechanical environment.
  • Knowledge of ABC/XYZ analysis to set safety stocks and reorder points.
  • Experience defining and improving KPIs related to plan execution.

Responsabilidades

  • High-Mix Schedule Management: Own the MPS for high-complexity lines, ensuring alignment between demand and production capability.
  • Capacity & Bottleneck Resolution: Identify and resolve capacity constraints; ensure Full Kit availability.
  • System Transition & Logic: Daily planning in SAP 4.7 and migration to SAP S/4HANA Public Cloud.
  • Data Intelligence: Use Power Query to audit and own scheduling logic.
  • Parameter Optimization: Set safety stocks, firm zones, and lead times for a large SKU portfolio.
  • Order Acknowledgment: Maintain a 36-hour window for customer order confirmation.
  • Supply Chain Collaboration: Partner with Planning and Sourcing for materials flow.
  • Floor Collaboration: Work with Manufacturing, Quality, and Engineering to resolve escalations.

Conocimientos

BOM Management
Capacity Planning
SAP Proficiency
Data Analytics
Technical English

Educación

Bachelor's degree in Engineering (Electromechanical, Industrial), Supply Chain, or Administration

Herramientas

Power Query
Power BI
Excel
SAP ECC 4.7
S/4HANA

Descripción del empleo

We empower smarter business operations by connecting equipment, software, and services to protect, control and optimize assets within electrical infrastructures. The business provides customers, across various industries, with end-to-end product and service solutions ensuring the reliability and protection of their electrical infrastructure.We provide the latest industry insights and technology to develop solutions needed to meet customers evolving challenges, including innovative critical power solutions designed for high reliability and performance. Our culture is one of quality and operational excellence fueled and supported by talented people, tools and processes, and expertise.

To return to the OmniOn Power website, click here.

Job Overview

In this role, you will absorb the most intricate product lines in our portfolio, managing a high volume of BOMs where precision is critical. You will move beyond simple data entry, using Power Query and Power BI to build the logic that drives our scheduling reports. You will act as the link between the front office and the production floor, spending roughly 20% of your time on-site to validate capacity bottlenecks and ensure that “Full Kits” are available before production begins.

The Master Production Scheduler (MPS) is the architect of production stability for our most complex, high-mix product lines. This role is responsible for transforming volatile demand into a feasible, “Ready-to-Run” schedule. By navigating the transition from legacy SAP 4.7 to S/4HANA Public Cloud, you will ensure that material availability and capacity constraints are balanced to achieve world-class Schedule Adherence.

This position reports to the Planning & Fulfillment Manager, and it is located in Matamoros, Tamaulipas.

Responsibilities

As Master Production Scheduler you will be responsible for:

  • High-Mix Schedule Management: Own the MPS for high-complexity lines, ensuring flawless alignment between customer demand and production capability.

  • Capacity & Bottleneck Resolution: Proactively identify and resolve capacity constraints. Maintain a “Full Kit” philosophy—ensuring no order is released without 100% material and resource availability.

  • System Transition & Logic: Execute daily planning in SAP 4.7 while actively contributing to the migration to SAP S/4HANA Public Cloud.

  • Data Intelligence: Utilize Power Query to maintain and audit manual scheduling reports. You are expected to “own the logic” behind the data, not just the output.

  • Parameter Optimization: Use independent intelligence to set and audit system parameters, including safety stocks, firm zones, and lead times for a large SKU portfolio.

  • Order Acknowledgment: Maintain a 36-hour window for customer order confirmation, identifying and expediting outages to meet Original Acknowledge dates.

  • Supply Chaing Collaboration : Partner with Planning and Sourcing to ensure flow of materials and identification of short and long term critical short parts.

  • Floor Collaboration: Partner with Manufacturing, Quality, and Engineering on the shop floor to resolve escalations and improve Schedule Adherence.

ELIGIBILTY REQUIREMENTS:

OmniOn Power will only employ those who are legally authorized to work in Mexico for this opening. We will not sponsor individuals for employment visas, now or in the future, for this job opening.

Basic Qualifications
  • Education: Bachelor’s degree in Engineering (Electromechanical, Industrial), Supply Chain, or Administration.

  • Experience: 3+ years in a high-volume manufacturing environment.

  • Technical English: Intermediate to advanced level for global team coordination.

  • SAP Proficiency** : Strong experience in SAP ECC 4.7 or S/4HANA** (specifically MD04, COHV, COOIS, and Material Master maintenance).

  • Capacity Planning** :** Ability to perform Rough-Cut Capacity Planning (RCCP) to manage shop floor bottlenecks.

  • BOM Management** :** Deep understanding of multi-level Bills of Materials within an electromechanical manufacturing environment.

  • Inventory Strategy: Knowledge of ABC/XYZ analysis to independently set safety stocks and reorder points.

  • Schedule Adherence Tracking: Experience defining and improving KPIs related to plan execution.

Desired Qualifications
  • Advanced Data Analytics: Expertise in Power Query (M Language) and Excel to automate and audit manual scheduling logic.

  • Schedule Adherence Tracking: Experience defining and improving KPIs related to plan execution.

  • Assertive Communication: The confidence to negotiate with both Sales (demand) and Production (supply) to protect the integrity of the schedule.

  • Adaptability: A “change-agent” mindset necessary for moving from legacy manual processes to cloud-based ERP systems.

  • Attention to Detail: Precision-oriented approach to managing a large SKU portfolio where small errors can lead to material outages.

Consigue la evaluación confidencial y gratuita de tu currículum.
o arrastra y suelta tu archivo aquí
Similar jobs

Puestos de trabajo similares que vale la pena comparar

Senior Master Scheduler – High‑Mix Production & SAP
Senior Master Scheduler – High‑Mix Production & SAP

OmniOn Power Inc. • Matamoros

Presencial
MXN 600.000 - 900.000
Master Schedule Planner
Master Schedule Planner

OmniOn Power Inc. • Matamoros

Presencial
MXN 600.000 - 900.000
High-Mix Master Production Scheduler with SAP & Power BI
High-Mix Master Production Scheduler with SAP & Power BI

OmniOn Power • Matamoros

Presencial
MXN 480.000 - 720.000
Supply Chain Manager
Supply Chain Manager

OmniOn Power • Matamoros

Presencial
MXN 700.000 - 1.200.000
Master Production Scheduler
Master Production Scheduler

KION Group • Guadalupe

Presencial
MXN 420.000 - 640.000
Senior Materials Planner
Senior Materials Planner

OmniOn Power Inc. • Matamoros

Híbrido
MXN 600.000 - 900.000
Master Production Scheduler
Master Production Scheduler

Safran Aerosystems México, S. de R.L de C.V. • Mexicali

Presencial
MXN 1.041.000 - 1.389.000
Master Plan Scheduler
Master Plan Scheduler

TE Connectivity • Chihuahua

Presencial
MXN 480.000 - 720.000
Supply Chain Manager
Supply Chain Manager

OmniOn Power Inc. • Matamoros

Híbrido
MXN 1.200.000 - 2.000.000
Production Scheduling Professional
Production Scheduling Professional

Siemens Mobility • Santiago de Querétaro

Presencial
MXN 420.000 - 540.000