Master planner

Jabil

Chihuahua

Presencial

MXN 600.000 - 900.000

Jornada completa

Hace 8 días

Recibe más respuestas de empleadores

Envía un currículum específico para el puesto de trabajo en cuestión de minutos.

Descripción de la vacante

Jabil in Chihuahua, MX seeks a Master Planner to manage all planning activities for a dedicated workcell and mentor the Production Planners and Document Coordinators. You will develop the Master Production Schedule, maintain BOMs and routings, and ensure accurate material control and ERP loading with PO coverage.

Responsibilities include reconciling MPS to PO coverage, driving 95% MPS accuracy, and sustaining 100% on-time delivery.

Formación

  • Bachelor’s degree in a relevant field and several years of planning experience.
  • Strong knowledge of MRP/ERP and BOMs.
  • Experience in capacity planning and production scheduling.

Responsabilidades

  • Manage all planning activities for the assigned workcell.
  • Develop MPS and load into ERP with PO coverage.
  • Maintain BOMs, routings and WIP tracking to ensure accurate inventory movement.
  • Ensure 95%+ MPS accuracy and 100% on-time delivery.
  • Lead end-to-end planning, material control and documentation.
  • Coordinate with workcell and manufacturing teams to optimize schedules.

Conocimientos

MRP knowledge
ERP systems
BOM management
Capacity planning
Production scheduling
Documentation control

Educación

Bachelor’s degree + 5 years experience
Master’s degree + 3 years experience
PhD
APICS Certification

Herramientas

ERP software
Routing software
Forecasting tools

Descripción del empleo

Job Summary

Manage all planning activities for the dedicated assigned workcell and mentor the Production Planners and Document Coordinators in the workcell.

  • Maintain efficiency of capacity and customer sizing.
  • Maintain accurate revenue forecasting.
  • Maintain material control and liability.
  • Develop Master Production Schedule (MPS) and load into Jabil’s ERP system, including Purchase Order (PO) coverage.
  • Reconcile the MPS to customer PO coverage weekly to ensure that Jabil is not exposed over and above customer PO coverage or other authorized customer demand.
  • Ensure the MPS is always 100% accurate and achievable.
  • Achieve and maintain 95% MPS goal.
  • Own production planning, BOM and document control with or without additional support.
  • Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand.
  • Maintain the workcell’s capacity planning model; drive resolution on uneven capacity utilization that keeps Jabil focused on the customer but efficiently utilizing manufacturing resources.
  • Meet daily with the Workcell and manufacturing team to assess production schedules, (adjust as necessary based on production results) optimize run quantities, and minimize changeovers to help achieve 100% on time delivery.
  • Maintain the customers’ latest contract on file at all times and be familiar with the terms and conditions of the contract regarding customer liability of material planning and production scheduling. This includes the liability window for Jabil material purchase order placement, purchase price for components, and liability for any in-house materials (purchased and manufactured).
  • Be the workcell’s “expert” on all planning activities by supporting the Production Planner goal of never starting to build product without having a valid PO, adequate material quantities, and accurate BOM and an accurate routing.
  • Lead the Workcell on the creation of Bills of Material (BOMs) and routings that allows accurate tracking of WIP assemblies and accurate inventory movement transactions.
  • End-of Life (EOL) management should include chairing a meeting 30 days prior to the last planned build date to create tactics to support the EOL strategy. The Master Planner would own the build schedule, corrections and resolution of MPS to customer demand, planned tactics on deadlines for assemblies out of the various work areas on the floor, deadline for last shipment, and support plan for potential RMAs.
  • Manage Jabil purge process for internal Workcell purges.
  • Adhere to all safety and health rules and regulations associated with this position and as directed by supervisor.
  • Comply and follow all procedures within the company security policy.
Essential Duties And Responsibilities
  • Ensure 100% on-time delivery.
  • Establish build readiness.
  • Maintain efficiency of capacity and customer sizing.
  • Maintain accurate revenue forecasting.
  • Maintain material control and liability.
  • Develop Master Production Schedule (MPS) and load into Jabil’s ERP system, including Purchase Order (PO) coverage.
  • Reconcile the MPS to customer PO coverage weekly to ensure that Jabil is not exposed over and above customer PO coverage or other authorized customer demand.
  • Ensure the MPS is always 100% accurate and achievable.
  • Achieve and maintain 95% MPS goal.
  • Own production planning, BOM and document control with or without additional support.
  • Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand.
  • Maintain the workcell’s capacity planning model; drive resolution on uneven capacity utilization that keeps Jabil focused on the customer but efficiently utilizing manufacturing resources.
  • Meet daily with the Workcell and manufacturing team to assess production schedules, (adjust as necessary based on production results) optimize run quantities, and minimize changeovers to help achieve 100% on time delivery.
  • Maintain the customers’ latest contract on file at all times and be familiar with the terms and conditions of the contract regarding customer liability of material planning and production scheduling. This includes the liability window for Jabil material purchase order placement, purchase price for components, and liability for any in-house materials (purchased and manufactured).
  • Be the workcell’s “expert” on all planning activities by supporting the Production Planner goal of never starting to build product without having a valid PO, adequate material quantities, and accurate BOM and an accurate routing.
  • Lead the Workcell on the creation of Bills of Material (BOMs) and routings that allows accurate tracking of WIP assemblies and accurate inventory movement transactions.
  • End-of Life (EOL) management should include chairing a meeting 30 days prior to the last planned build date to create tactics to support the EOL strategy. The Master Planner would own the build schedule, corrections and resolution of MPS to customer demand, planned tactics on deadlines for assemblies out of the various work areas on the floor, deadline for last shipment, and support plan for potential RMAs.
  • Manage Jabil purge process for internal Workcell purges.
  • Adhere to all safety and health rules and regulations associated with this position and as directed by supervisor.
  • Comply and follow all procedures within the company security policy.
Management & Supervisory Responsibilities
  • Typically reports to Management. Direct supervisor job title(s) typically include: TBD
  • Job is NOT directly responsible for managing other employees (e.g., hiring/termination and/or pay decisions, performance management).
Education & Experience Requirements

Bachelor’s degree + 5 years of experience, or Masters + 3 years of related experience, or PhD without experience.

APICS Certification And Supervisor Experience Also Preferred.

Thorough knowledge of MRP, lead times for specific component types, internal run rates, test development lead times, machine programming lead times and complete understanding of the chronological sequence of events that must occur in order to build a product.

Or an equivalent combination of education, training, or experience.

Consigue la evaluación confidencial y gratuita de tu currículum.
o arrastra y suelta tu archivo aquí
Similar jobs

Puestos de trabajo similares que vale la pena comparar

Sr. Master Planner
Sr. Master Planner

Jabil • Región Centro

Presencial
MXN 600.000 - 900.000
Planner I
Planner I

Jabil • Tijuana

Presencial
MXN 240.000 - 420.000
Production Manager
Production Manager

Jabil • Región Centro

Presencial
MXN 420.000 - 660.000
Planner II
Planner II

Jabil Malaysia • Región Centro

Presencial
MXN 300.000 - 420.000
Workcell Manager
Workcell Manager

Jabil • Chihuahua

Presencial
MXN 350.000 - 550.000
Planning Manager
Planning Manager

Plasticos Castella SA • Ciudad Juárez

Presencial
MXN 600.000 - 900.000
Business Unit PM
Business Unit PM

Jabil • Apodaca

Presencial
MXN 700.000 - 1.050.000
Production Scheduler
Production Scheduler

Jabil • Región Centro

Presencial
MXN 279.000 - 424.000
Operations Project Manager III
Operations Project Manager III

Jabil • Región Centro

Presencial
MXN 1.049.685 - 1.399.580
Workcell Manager
Workcell Manager

Jabil • Tijuana

Presencial
MXN 480.000 - 650.000