Data Center Construction Site Foreman (Querétaro, Mexico)

Lambda

Santiago de Querétaro

On-site

MXN 800,000 - 1,029,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Lambda is seeking a Construction Onsite Foreman to lead field execution for data center fit-outs, electrical and network installations, and equipment handoffs. You will coordinate trade crews, enforce safety, and drive on-site progress from drawings to energized capacity.

You will travel to active sites (~75%), manage daily reports, punch lists, and coordination with the Data Center Implementation Manager and Project Manager to meet schedule and quality targets.

Qualifications

  • 5+ years construction field experience in data centers or critical facilities.
  • Experience supervising on-site crews and coordinating multiple trades.
  • Strong reading of drawings, specs, and installation instructions.
  • Proven safety ownership and ability to stop unsafe work.
  • Familiarity with field reporting tools and project platforms.

Responsibilities

  • Direct daily activity across MEP trades and network installers on the floor.
  • Oversee fit-out, cabinet setting, cable management, and containment work.
  • Enforce safety and quality standards; conduct safety walks.
  • Coordinate outages, access, and vendor logistics; manage field documentation.
  • Own three-week lookahead; track progress and report to managers.
  • Assist with commissioning through turnover to operations.

Skills

Data center experience
Foreman/lead experience
Reading construction drawings
Safety leadership
Field documentation
Project coordination tools

Education

High school diploma or equivalent
Trade apprenticeship/journeyman
OSHA 30 certification

Tools

Procore
Smartsheet
MS Project
Monday.com

Job description

Travel

75% , Sustained on-site presence required at active data center construction and fit-out sites.

What You’ll Do

As a Construction Onsite Foreman, you are Lambda’s eyes, ears, and hands in the field. You will hold daily on-site command of colocation white space fit-outs, high-density compute expansions, and infrastructure upgrades, working under the Data Center Implementation Manager and alongside the Data Center Implementation Project Manager to turn drawings and schedules into installed, energized, and accepted capacity.

You will direct and coordinate trade crews and vendor teams on the floor, sequence work across electrical, mechanical, low voltage, and network scopes, enforce safety and quality standards, and keep material and equipment flowing to the point of install. You will catch field conflicts before they become schedule impacts, escalate what cannot be solved at the site level, and own the daily record of what actually happened on your job.

Key Responsibilities
  • Daily Field Supervision:
    • Serve as Lambda’s on-site lead for assigned data center projects. Direct daily activity across MEP contractors, low voltage and network installers, rack and integration crews, and OEM field service teams. Run daily huddles, set the day’s priorities, and confirm each crew knows its scope, sequence, and constraints.
  • Fit-Out & Installation Oversight:
    • Oversee physical execution of white space fit-out work including rack and cabinet setting, containment, busway and branch circuit distribution, rPDU installation, cable tray, structured cabling, liquid cooling and CDU tie-ins, and airflow management. Verify installations match approved drawings and Lambda standards before work is covered or energized.
  • Safety Leadership:
    • Enforce site safety requirements, energized work permits, LOTO procedures, hot work permits, and PPE compliance. Conduct daily safety walks, stop unsafe work immediately, and lead incident and near-miss reporting with the data center provider and general contractor.
  • Quality Control & Inspections:
    • Perform in-progress and pre-cover inspections, torque and terminations checks, labeling verification, and workmanship reviews. Build and drive punch lists to closure, rejecting non-conforming work and confirming corrections in the field.
  • Trade & Vendor Coordination:
    • Deconflict overlapping trade work, sequence access to shared space and shafts, and coordinate outage and switching windows with the data center provider. Escort and manage vendor access, badging, tool and material handling, and site rules compliance.
  • OFCI Material Management:
    • Receive, inspect, stage, and secure OFCI (Owner-Furnished, Contractor-Installed) equipment. Verify shipments against packing lists and submittals, document damage and shortages immediately, manage laydown and storage areas, and confirm material readiness ahead of each install window.
  • Schedule Support & Lookaheads:
    • Own the three-week lookahead in the field. Track daily progress against the construction schedule, flag manpower and material gaps early, and provide the Implementation Project Manager with accurate percent-complete and constraint data.
  • Field Documentation & Reporting:
    • Produce daily field reports covering manpower counts, work completed, deliveries, delays, safety observations, and photo documentation. Maintain redline markups, RFI and field observation logs, and as-built notes for turnover.
  • Issue Resolution & Escalation:
    • Resolve constructability conflicts and field questions at the site level where possible. Generate clear RFIs with photos and drawing references when a design or scope decision is needed, and elevate cost, schedule, or safety impacts without delay.
  • Commissioning & Turnover Support:
    • Support pre-functional checks, Level 1 through Level 4 commissioning activities, and integrated systems testing. Coordinate contractor availability for scripts, witness testing where directed, and drive open-item closure through final acceptance and handoff to Data Center Operations.
  • Cross-functional Alignment:
    • Work closely with Network Engineering, Data Center Operations, HPC, Supply Chain, and Technical Project Management so that deployment, cabling, and hardware install activities land in the right sequence and space is turned over ready for GPU deployment.
You
  • Come from the trades, with a working foreman’s command of how mission-critical space actually gets built, installed, and energized.
  • Experienced running crews and vendors in live and occupied data center environments where uptime and adjacency risk are unforgiving.
  • Fluent in reading and marking up construction drawings, single lines, riser diagrams, submittals, and installation details.
  • Sets a visible safety standard and is comfortable stopping work and holding contractors to it, including under schedule pressure.
  • Detail-driven on workmanship, labeling, torque, containment, and cable management, with a low tolerance for shortcuts that create operational debt.
  • Organized in the field with materials, tools, laydown, and deliveries, and disciplined about documenting what happened each day.
  • Direct and clear communicator who can brief a project manager, challenge a contractor, and write a usable daily report.
  • Comfortable working with limited oversight, making sound calls on site, and knowing precisely when to elevate.
  • Proficient with mobile field tools, photo documentation, and punch list and project tracking platforms.
  • Willing to travel to project sites and to work off-hours, nights, or weekends when critical activities or outage windows require it.
Top Five Requirements
  • Hands-On Data Center or Mission-Critical Field Experience:
    • Proven record supervising construction, fit-out, or infrastructure installation work in data centers or comparable mission-critical facilities.
  • Crew & Trade Supervision:
    • Demonstrated ability to direct and sequence multiple trades and vendors on a live site, holding daily accountability for scope, pace, and workmanship.
  • MEP & Low Voltage Installation Knowledge:
    • Practical command of electrical distribution, mechanical and cooling systems, containment, and structured cabling, with the ability to read drawings and catch field conflicts.
  • Safety Ownership:
    • Consistent enforcement of site safety, LOTO, energized work, and permitting requirements, with the authority and willingness to stop unsafe work.
  • Field Documentation & Reporting Discipline:
    • Reliable daily reporting, photo documentation, redlines, punch list management, and clear escalation to project management.
Qualifications
  • High school diploma or equivalent required. Completed trade apprenticeship, journeyman license, technical certification, or associate degree in a construction or engineering discipline strongly preferred.
  • 5+ years of construction field experience, including 2+ years in a foreman, lead, or superintendent capacity.
  • Direct experience with data center white space fit-out, critical facility construction, or comparable industrial and mission-critical installation work.
  • Working knowledge of electrical, mechanical, and low voltage systems and installation practices, including power distribution, cooling, containment, and cabling.
  • Ability to read and interpret construction drawings, specifications, submittals, and installation instructions, and to produce accurate redlines.
  • OSHA 30 certification required or obtained within 90 days of hire. NFPA 70E familiarity preferred. First Aid and CPR certification a plus.
  • Familiarity with commissioning processes, pre-functional checklists, and punch list closeout.
  • Comfortable with field reporting tools and project platforms (e.g., Procore, Smartsheet, MS Project, Monday.com) and with mobile photo documentation.
  • Able to lift, climb, work at height, and remain on foot in active construction environments for extended periods.
  • Willingness to travel to and work within active construction sites (~75%), including off-hours and weekend work during critical activities.
  • Committed to safety, quality, and continuous improvement in field execution practices.
Salary Range Information

The annual salary range for this position has been set based on market data and other factors. However, a salary higher or lower than this range may be appropriate for a candidate whose qualifications differ meaningfully from those listed in the job description.

Compensation Range: MX$800,000 - MX$1,029,000

About Lambda
  • Founded in 2012, with 500+ employees, and growing fast
  • Our investors notably include TWG Global, US Innovative Technology Fund (USIT), Andra Capital, SGW, Andrej Karpathy, ARK Invest, Fincadia Advisors, G Squared, In-Q-Tel (IQT), KHK & Partners, NVIDIA, Pegatron, Supermicro, Wistron, Wiwynn, Gradient Ventures, Mercato Partners, SVB, 1517, and Crescent Cove
  • We have research papers accepted at top machine learning and graphics conferences, including NeurIPS, ICCV, SIGGRAPH, and TOG
  • Our values are publicly available: https://lambda.ai/careers
  • We offer generous cash & equity compensation
  • Health, dental, and vision coverage for you and your dependents
  • Wellness and commuter stipends for select roles
  • 401k Plan with 2% company match (USA employees)
  • Flexible paid time off plan that we all actually use
Equal Opportunity Employer

Lambda is an Equal Opportunity employer. Applicants are considered without regard to race, color, religion, creed, national origin, age, sex, gender, marital status, sexual orientation and identity, genetic information, veteran status, citizenship, or any other factors prohibited by local, state, or federal law.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Data Center Operations Systems Engineer (Querétaro, Mexico)
Data Center Operations Systems Engineer (Querétaro, Mexico)

Lambda • Santiago de Querétaro

On-site
MXN 350,000 - 500,000
Data Center Operations Systems Engineer (Querétaro, Mexico)
Data Center Operations Systems Engineer (Querétaro, Mexico)

Lambda • Santiago de Querétaro

On-site
MXN 420,000 - 600,000
Data Center Construction Foreman — Onsite Lead, Safety & Quality
Data Center Construction Foreman — Onsite Lead, Safety & Quality

Lambda • Santiago de Querétaro

On-site
MXN 800,000 - 1,029,000
México - Data Center Commissioning Engineer (CxE) - Mechanical - All Levels
México - Data Center Commissioning Engineer (CxE) - Mechanical - All Levels

Apollo Mission Critical Engineering • Santiago de Querétaro

On-site
MXN 1,182,000 - 1,858,000
Health and wellness plans
Flexible spending accounts
Paid time off
+4
Senior Infrastructure Engineer
Senior Infrastructure Engineer

KMS Technology • Guadalajara

Hybrid
MXN 900,000 - 1,600,000
PTO 15 days
Medical insurance
Annual bonus
+5
Business Development Manager
Business Development Manager

TDK-Lambda Americas • Tijuana

On-site
MXN 1,604,850 - 2,139,800
Healthcare benefits
401(k) with match
Paid time off (PTO)
+3
Senior TypeScript + AWS Lambda Developer
Senior TypeScript + AWS Lambda Developer

NTT DATA, Europe & LATAM, Branch in USA, Inc. • Mexico

Remote
MXN 429,000 - 580,000
EH&S Manager, Metal-Mechanical Operations
EH&S Manager, Metal-Mechanical Operations

784 FLEXTRONICS INTEGRATED SERVICES MEX • Guadalajara

On-site
MXN 900,000 - 1,500,000
Competitive Salary
Life & Medical insurance
Christmas Bonus
+2
Staff Engineer - Distributed Systems
Staff Engineer - Distributed Systems

HighLevel • Monterrey

Remote
MXN 3,294,000 - 4,758,000
Senior Infrastructure Engineer
Senior Infrastructure Engineer

KMS Technology • Región Centro

Hybrid
MXN 900,000 - 1,500,000
Mexican law benefits
15 days PTO (first year)
5 days leave for death of immediate 가족
+7